Loading...
HomeMy WebLinkAboutBLD2007-01224 Cancelled Propane - BLD Permit / Conditions - 7/5/2007 Inspection Line(360)427-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352 Mason County Bldg. III 426 W. Cedar P.O. Box 186ti . , IP4 Shelton,WA 98584 RESIDENTIAL BUILDING PERMIT BLD2007-01224 OWNER: GREGG PAISLEY CONTRACTOR: LICENSE: EXP: RECEIVED: 7/5/2007ISSUED: 7/5/2007 SITE ADDRESS: 4911 E STATE ROUTE 3 SHELTON EXPIRES: 1/5/2008 PARCEL NUMBER: 321353100081 LEGAL DESCRIPTION: TR 8-A OF E1/2 SW SE SURVEY 8/60 PROJECT DESCRIPTION: DIRECTIONS TO SITE: PROPANE OUTLETS, SHOWERS AND WATER HEATER. 4911 E STATE ROUTE 3 - SHELTON General Information Construction &Occupancy Information Square Footage Information No. of Bedrooms: Type o Constr.: Type of Use: OTH Insp.Area: No.of Bathrooms: group: Lot Size: Deck: Type of Work: MEC Fire Dist.: 5 No.of Stories: \(;k. goad: Building: Valuation: Building Height: Occ:1Status: Basement: Manufactured Home Information Setback Informatiog,,r Shoreline&Planning Information Water Body: Make: Length: Ft. Front: Ft. ShoreTfi�i -"/ Ft. SEPA?: Rear: Ft. Slo Ft. Model: Width: Ft. Side 1: Ft. Shoreline Desig.: Year: Serial No.: Side 2: Ft. Comp. Plan Desig.: Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Showers 2 Gas Outlets 1 Mechanical Fee CMH 7/5/2007 $5.50 S12007000 Water Closets (Toilets) 2 Mechanical Base Fee CMH 7/5/2007 $25.30 S12007000 Plumbing Fee CMH 7/5/2007 $30.80 S12007000 Plumbing Base Fee CMH 7/5/2007 $22.00 S12007000 Total $83.60 r F i ALD2007-01224 Please referto the following pages for conditions of this permit. 1 of 3 CASE NOTES FOR BLD20 0 7-01 2 24 CONDITIONS FOR BLD2007-01224 1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and netary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person �i g this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. Xa 2) Owner/Agent is responsi^ I� o post the-assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. X 3) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Washington. Occupanqy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. X 4) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as a ended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior tQ„ esting additional inspections. X 5) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and b g regulations. X .--- 6) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 18 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevented action from .p in aken. No more than one extension may be granted. X cl_ ► r ALD2007-01224 Please referto the following pages for conditions of this permit. 2 of 3 7) All propane tanks must be installed in accordance with the International Fire Code and all applicable Mason County ordinances. All Propane tanks between 125 and 500 gallons must be located a minimum of 10'from any building, property line, public way, possible source of ignition (electrical outlets, electrical fixtures, compressors, etc).,and/or any weeds, grass, brush, trash.or any other similar combustible materials. If a propane tank is exposed to probable vehicular damisr�protective bollards must be installed. X - ✓ �Q 8) All propane tanks must be installed in accordance with the International Fire Code and all applicable Mason County ordinances. All propane tanks must meet the installation require rt and minimum setbacks as listed in the Mason County Fire Marshal's Standards for the Installation of Propane Tanks. X 9) Fuel piping shall be inspected after the installation of fuel piping is complete, and before the attachment of fixtures, appliances, or shut-off valves. At the time of inspection the test pressur $hall be no less than 10 psi held for no less than 15 minutes. Appliances to be attached to the fuel piping system shall not be used until the final inspectio Ijas been performed and approved by a Mason County building inspector. X 10) Owner/applicant must obtain a seperate permit the placement of any size propane tank serving a fixed appliance within a dwelling structure or unit prior to the placement of the tank. X 11) The placement of small propane tanks are not normally subject to a permit review by the Planning Department; however, propane tanks are subject to Planning Department regulations. Such regulations primarily consist of setbacks from shorelines and features considered to be critical areas (streams, wetlands, slopes, etc.) If you think such features exist on or nearby your property, please contact the Planning Department so that exact setback requirements can be determined. X This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied.Proof of continuation of work is by means of a progress inspection.The owneror the agent on the owners behalf,represents thot;the:information provided is accurate and grants employees of Mason County access to the above described property and structure for review and i ction. OWN ER OR AGENT: Cr�a•v, DATE: c � 3 of 3 `4LD2007-01224 Please referto the following pages for conditions of this permit. co o CONCRETE MECHANICAL Date �y MANUFACTURED HOME D .._... _ CD CD Footings I Setbacks Ribbons r Gas Piping Interior Date By Interior-Date By Data By < N Exterior Date BY Exterior-Date 2"--*)'d-7 B j -- --.___ INSULATION set�� 0 Point Load/Isolated Footings -- Date ey X BG I SLAB INSULATION m Date _ By Data By FIRE DEPARTMENT 0 Foundation(Malls Floors Date By � Bate BY NO By DECKS F RAM ING VV&ft Date By Date By data By PROPANE TANKS PLUMBING V*Uft Date By Dole BY OTHER Groundwork Attic Type_ Dana By Date _ By Date By D.W.b DRMALL Type: Date By Int Brace Wall pate By ft � ° By FINAL INSPECTION v a) Water Line Fire Separation OEn m Date By Date By Data By O m —4 Pass or Request Inspect. c Type of Insp. Fall Date Date Done By Comments �" -Zbta o ` 5 -o v _ co -- m cn 8 � Q 0 (n ._ 0 IN CD K i f i I 0 Mason County Dept. of Community Development Mason County Bldg. 3 426 W. Cedar IP14 P.O. Box 186 (360) 427-9670 Local (360) 482-5269 Elma Shelton, WA 98584 (360) 275-4467 Belfair Notice to Obtain Final Inspection November 21, 2008 GREGG PAISLEY 4919 LAKERIDGE DR E LAKE TAPPS WA 98391 Case No.: BLD2007-01224 Parcel No.: 321353100081 Proiect Description: PROPANE OUTLETS, SHOWERS AND WATER HEATER. The Mason County Department of Community Development is currently reviewing all permits that are expired and have not been approved for occupancy and use. Pursuant to Mason County Code, Title 14 Building and Construction, a permit and final inspection for this type of activity is required under the 2006 International Building Code or the code your permit was issued and your property is currently in violation status of occupancy and use. Please contact our office to make the necessary arrangements 21 days from the date of this letter. Failure to contact our office to make the necessary scheduled inspections will result in enforcement actions. To bring your site into compliance, you must schedule an inspection. One (1) $68.00 site investigation fee will need to be paid prior to inspection along with any outstanding fees currently due on your building permit. For every inspection required after that, you will be charged $68.00 again, per inspection until final inspection and conditions are met. To schedule an inspection, please call (360) 427-9670 ext. 262. If you should have any questions regarding this notification, please contact me at (360) 427-9670 eext 1-115. Sincerely, �f L Rich Todd Balderston Mason County Department of Community Development Cc: Property File November 21 , 2008 BLD2007-01224 ) FORM MUST BE COMPLETED IN INK MASON COUNTY PERMIT 1\1030 `"M`� PLEASE PRESS HARD v 1 a PLUMBING/MECHANICAL PERMIT APPLICATION 426 W. Cedar• P.O. Box 186, Shelton, WA 98584 Shelton (360) 427-9670• Belfair (360) 275-4467 • Elma (360) 482-5269 On the web www.co.mason.wa.us APPLICANT INFORMATION CONTRACTOR INFORMATION Owner v�� 'G' —l S'L S—LQ Company Name Mailing Address ` ct t k NL > ct 5 Mailing Address City 5'4-Z-r---V`! State L>/P- Zip Code qt:Tt City State Zip Code PhoneZ' 702 . I$(')7 Other Ph. Phone Other Ph. Lien/Title Holder S.�n� Contractor Reg.# Exp. E mail address 6P--L ,PA-i>Lz*"r G GwatL. Go=�l E Mail Address Drivers Lic.# FA i SLbi`gIs'j 3,F- DOB L — Drivers Lic.# DOB SEPTIC INFORMATION - Connect to New Septic Existing Septic. Connect to Sewer System Name of Sewer System PARCEL INFORMATION - 12 Digit Parcel No. Fire District Legal Description Site Address (Please include street name, street number and city) 5:�3 Directions to site 4 P ti k A -7 --)X Is property within 200'of Saltwater V-'0 Lake River/Creek > Pond 1: Wetland Seasonal Runoff—Stream—Slopes or Bluffs > 15% TYPE OF JOB - New Add Alt Repair Other Use of Building Location of Fixtures/Units - 1st Floor 2nd Floor Basement Garage Closet PLUMBING FIXTURES (Show Number of each) MECHANICAL UNITS Type of Fixture No. of Fixtures Fees Fuel Type:Electric_ LPQ,/— Natural Gas Heat Pump_ Toilets Type of Unit No. of Units Fees Bathroom Sink Furnace Bath Tubs � — ll Heatpumps Showers Z c�X Spot Vent Fan Water Heater Z '�)c Propane Tank Clothes Washer Gas Outlets Kithen Sinks Wood/Gas/Pellet Stove Dishwasher Kitchen Exhaust Hood Hosebibs Dryer Vent Other Other Base Fee �� Base Fee TOTAL PLUMBING TOTAL MECHANICAL OWNER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below.I declare that I am the owner,owners legal representative,or the contractor.I further declare that I am entitled to receive this permit and to do the work as proposed in the application.I declare that I have obtained the permission from all the necessary parties.If permission is required from any easement holder or any other party in interest regarding this application or the work proposed in the application, I have obtained permission from them to apply for this permit and conduct the work proposed. The owner or agent on owners behalf,represents that the information provided is accurate grants employees of Mason County access to the above described property and structure for review and inspection. PROOF OF CONTI N OF WORK IS BY MEANS OF A PROGRESS INSPECTION. , I Jr O'7 X Date: Owner/Owners Representative/Contractor (indicate which one) FOR OFFICIAL USE BEYOND THIS POINT Accepted by: Planning Pd Ck# Date Bld I'd Receipt No. DEPARTMENTAL REVIEW APPROVED DENIED NOTES Building Department Occ Group—Type Constr. Planning Department Environmental Health Department FEES Plumbing & Base Fee Site Ins ection Mechanical & Base fee UFC Plan Review Fee Wood/Gas/ Pellet Stove Fee Other Violation Fee TOTAL FEES