Loading...
HomeMy WebLinkAboutBLD2024-00827 DEMO - BLD Inspections - 12/20/2024 INSPECTION CARD Mason County 615 W. Alder St. Building 8, Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov PERMIT# BLD2024-00827 PROJECT ADDRESS 173 NE Neyhart Farms Ln Tahuya, WA 98588 PARCEL# 322133200050 PROJECT DESCRIPTION Demolition of manufacture home for habitat restoration OWNER GREAT PENINSULA CONSERVANCY ADDRESS 6536 KITSAP WAY PHONE 360-373-3500 CONTRACTOR PAT HALL CONSTRUCTION INC. ADDRESS 4235 SE MILE HILL DRIVE SUITE B PHONE CONTRACTOR LICENSE PATHAHC817BN LENDER INSPECTION INSP I DATE Comments INSPECTION INSP DATE Comments onoeetionis-to-b7wr' ' Demolition Final Inspection 12?0 4 D-LO A)o ACCE.sS c Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov FBLD202,4, -00827 DEMO ESCRIPTION: DEMOLITION OF MANUFACTURE HOME ISSUED: 07/15/2024 T RESTORATION ESS: 173 NE NEYHART FARMS LN TAHUYA EXPIRES: 01/11/2025 PARCEL: 322133200050 APPLICANT: Grbavac,Jill OWNER: GREAT PENINSULA CONSERVANCY PO Box 2169 6536 KITSAP WAY Belfair,WA 98528 BREMERTON,WA 98312 3602753575 GENERAL CONTRACTOR'S LICENSE: PAT HALL CONSTRUCTION INC. License: PATHAHC817BN 4235 SE MILE HILL DRIVE SUITE B Expires: 01/15/2025 PORT ORCHARD,WA 98366 FEES: Paid Due State Fee-Residential $6.50 $0.00 Demolition Fee $120.00 $0.00 Technology Flat Convenience $5.00 $0.00 Fee Totals : $131.50 $0.00 REQUIRED INSPECTIONS Connection is to be verified by Health or Utilities Demolition Final Inspection CONDITIONS * All other necessary permits from Mason County, Washington State, Federal Agencies, and/or other agencies/groups that are required for this proposed development and construction must be obtained PRIOR TO DEVELOPMENT AND CONSTRUCTION. * For public safety, it is the responsibility of the applicant to confirm through written verification all utility services (electric, gas,water, sewer, ...) have been terminated prior to demolishing a structure. Printed by:Anna Schaffran on:07/16/2024 08:37 AM Page 1 of 2 Mason County Mason County - Division of Community Development 615 W.Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov DEMO BLD2024-00827 Proper erosion and sediment control practices must be used on the construction site and adjacent areas to prevent upland sediments from entering the aquatic environment. Erosion control measures must be in place prior to any clearing, grading, or construction. These control measures must be effective to prevent soil from being carried into surface water by stormwater runoff.Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of state regulations. Any work in or adjacent to waterways that will adversely affect water quality must receive specific prior authorization from the Department of Ecology. Silt fencing, straw matting, etc. must be installed and maintained until seeding or upland vegetation has become established around all areas disturbed or newly created by construction activities. * All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. * The demolition and disposal of demolition debris must meet requirements as per Mason County regulations. it is unlawful for any person to cause or allow the demolition (or major renovation)of any structure unless all asbestos containing materials have been removed from the area to be demolished. work shall not commence on an asbestos project or demolition unless the owner or operator has obtained written approval from ORCAA @ 2490 B Limited Lane NW, Olympia WA 98502, 360-586-1044,800-422-5623,www.orcaa.org * OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null & void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION UNLESS OTHERWISE APPROVED. * The Washington State Clean Air Act prohibits the burning of any construction or demolition debris in an outdoor fire. * All construction debris must be removed from the site after project completion to an approved location. Proper disposal of construction debris must be on land in such a manner that debris cannot enter or cause water quality degradation of aquatic environments. * Property is located in a AE Floodway.Any new development is subject to Mason County Code Section 14.22 and 14.24. 1 hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By: QnG01 ,SCb,2 Contractor or Authorized Agent: 03 I-Plo. Paaa rnP.h f Date: 0-7 • 1(o. 2024 Printed by:Anna Schaffran on:07/16/2024 08:37 AM Page 2 of 2