HomeMy WebLinkAboutSHR2020-00008 Hamma Hamma Bridge South to North WSDOT and Under River - SHR Application - 5/13/2022 RECEIVED:RECEIVED
MASON COUNTY MAY 13 2022
I615 W. Alder Street
Building.Planning,Environmental Health,Community Health
COMMUNITY SERVICES
615 W.Alder St.—Bldg.8,Shelton,Wa 98584
Phone:(360)427-9670 ext.352 ♦ Fax:(360)427-7798 PERMIT NO.:r`ixkA22 d V
SHORELINE PERMIT APPLICATION
SHORELINE PERMITS
CONDITIONAL USE* SUBSTANTIAL DEVELOPMENT
VARIANCE* EXEMPTION ❑
ACCESSORY DWELLING UNIT*
The Washington State Shoreline Management Act(RCW 90.58) requires that substantial developments within designated
shorelines of the state comply with its administrative procedures (WAC 173-14) and the provisions of the Mason County
Shoreline Management Master Program. The purpose of this Act and local program is to protect the state's shoreline
resources. The program requires that substantial development (any development of which the total cost or fair market
value exceeds $7,047.00 or materially interferes with the normal public use of the water or shorelines of the State be
reviewed with the goals, polices, and performance standards established in the Master Program.
Answer all questions completely. Attach any additional information that may further describe the proposed development.
Incomplete applications will be returned.
*Shoreline Variances and Conditional uses require public hearings and have additional pages that shall be
attached to this application.
APPLICANT: Hood Canal Communications In i'14e r A,061 i P41,
ADDRESS: 300 E Dalby Rd
(street)
Union WA 98592
(city) (state) (zip)
TELEPHONE: 360 898-2481 360 898-2481
(home) (business)
AUTHORIZED REPRESENTATIVE: Mike Oblizalo
ADDRESS: P.O. Box 249
(street)
Union WA 98592
(city) (state) (zip)
TELEPHONE: 360 898-3425
PROPERTY DESCRIPTION:
General location (include property address, water body and associated wetlands—identify the name of the shoreline):
Rev. Nov. 30, 2021
Project location is located at the Hamma Hamma river. The construction will take place within the
WSDOT right-of-way from the Souther Hamma Hamma river to the Nothern Hamma Hamma
Bridge.
Include all parcel numbers: Projects located in open water areas, away from land shall provide latitude/longitude.
Hamma Hamma Southern Bridge, 47032'42.8"N 123002'32.9"W to
Hamma Hamma Northern Bridge, 47032'56.7"N 123002'38.1"W
OWNERSHIP:
Contract
Applicant Owner Lessee F--] Purchaser (Identify) Other
Owner:State of Washington Department of Transportation State Lands Divison
P.O. Box 47440 Olympia WA 98504
(street) (city) (state) (zip)
DEVELOPMENT DESCRIPTON:
Development proposal (identify and describe the proposed project, including the type of materials to be used, construction
methods, principle dimensions, and other pertinent information):
The project will consist of directional drilling from the Southern Hamma Hamma Bridge on SR 101 to
Hamma Hamma Nothern Bridge of SR101. In the directional drill bore path we will be placing 2- 1.5" HDPE
conduits to house a fiber optic cable. The conduit will be placed a min of 42" deep in WSDOT right-of-way
and 8' below the creek bed. There will be 4 vehicle rated vaults buried level with the existing soil grade.
Existing Use (identify current use of property with exist improvements):
The existing use of the land is Washington State Department of Transportation state route 101
highway.
Reason for requesting development:
We are requesting the placement of these conduits and fiber optic cables in WSDOT right-of-way
is to extend broadband internet services to the unserved residents in Mason County North of this
location.
Estimated Fair Market Value of Project to Closest$1,000: $40,000.00
The Applicant shall provide, at a minimum, the following information:
a. SITE PLAN -drawn to scale and including:
i. The boundary of the parcel(s) of land upon which the development is proposed;
ii. The ordinary high water mark(OHWM). This may be an approximate location provided, that for any development
where a determination of consistency with the applicable regulations requires a precise location of the OHWM the
mark shall be located precisely and the biological and hydrological basis for the location as indicated on the plans
shall be included in the development plan.Where the OHWM is neither adjacent to or within the boundary of the
project, the plan shall indicate the distance and direction to the nearest OHWM of a shoreline;
iii. Where appropriate, the proposed land contours using five-foot intervals in water area and ten-foot intervals on
areas landward of OHWM, if development involves grading, cutting, filling, or other alteration of land contours;
iv. The dimensions and location of existing structures which will be maintained;
v. The dimensions and locations of proposed structures; parking and landscaping;
vi. The location of proposed utilities, such as sewer, septic tanks and drain fields, water, gas and electricity;
vii.The location, source, composition, and volume of fill material;
viii. The location, composition and volume of any extracted materials, and proposed disposal area;
b. CROSS SECTION,drawn to scale including:
i. The existing ground elevations;
ii. The proposed ground elevations;
iii. The location and height of existing structures;
iv. The location and height of proposed structures;
V. The OHWM.
c. VICINITY MAP, including:
i. The location of subject parcel using natural points of reference(roads, state highways, prominent landmarks,
etc.).
ii. If the development involves the removal of any soils by dredging or otherwise, identify the proposed disposal
site on the map. If disposal site is beyond the confines of the vicinity map, provide another vicinity map
showing the precise location of the disposal site and its distance to nearest city or town.
iii. On the map, or separately, give a brief narrative description of the vicinity of the proposed project including
identification of the adjacent uses, structures and improvements, intensity of development and physical
characteristics.
d. ADJACENT LANDOWNERS. Provide names and mailing addresses of all real property owners within 300
feet of property line boundaries where development is proposed as mailing labels or pre-addressed
envelopes.
ACKOWLEDGEMENT:
I hereby declare, to the best of my knowledge and belief, the forgoing information and all attached information is true and
correct.
171
(Applicant or Au rized Representative) (date)
_It 0i
Hama Hama Bore --
Project Location.
SR101 from Milpost 320.00 to 319.72 `'�
Section 27, T24N - R3W
From Olympia: Take 101 N towards Shelton WA. Hong I,,,,,,,,
Continue past Hoodsport for approximately 12 miles.
Project begins at 1 st bridge over Hama Hama River and
continues past 2nd bridge.
Utility Owner: Hood Canal Communications -� Y
to s toa.,
Diagram of Directional Drill `Nottoscale
NUSHWY101
Exit Pit Start Pit
8' Below River Bed
Drill Path
3W0 ay132461 FO Box 249 360 898 2244 Union. 1.�WA 98592 1 ICC.net Keeping ouf community connected
Overhead View of Project
River Width 145'
River Width 150'
Start and Exit Pits Start and Exit Pits
Setback 100' from Setback 100' from
River River
Southern Bridge (Drill 1) Norther Bridge (Drill 2)
900' of Directional
Drilling between
River Bores
A vault will be placed
in the middle tying
the two bores
together
Southern Bridge
Northern Bridge
Between Bridges (Drills 3 &4)
z.
r . b . �•�"'Mrs,.
.T _-9 '•��({{rrDirect an • 111
Drill 1 Start Pit
/ Drill sw
•
u
•
' t
Syr
•1- t�`3�1+ tip t �r i.• .i�:
1. .
•
n
_
t ,�A/
- T
k
r,
`r
A 17x30x24"deep vault will
be placed in bore exit pit
Vault will be backfilled with
Drill 1 Exit Pit and crushed rock
Start Pit for Next r r
—� directional drill -
Drl1/Sit+U�
V
Y _ i
s�
M P 319.79
Ar
t r 9�•h;.
A it
A 17x30x24"deep vault
will be placed in bore
exit pit
--�----r Exit pit for both drills Vault will be backfilled
_ between river
t with crushed rock Y
a�.. ,,,, branches for a tie .r.+�+• " "
together vault .• '"j` '`"�— ..�,.__
a
i�
2L1.44
Exit Pit where drills 3 and 4 meet
MP 319.84
N lonn Webb Rd N lonn Webb Rd
0.
low
AmW
11
yX_f y .
A
NO
7 y{{
NY
O
r L.Az
�' Se
- f
.1V
i
Existing Power runs
along W side of Bridge r
Y
.4Z
077
-- Bore Path. Bore will be
8' below bed of river. .�
�_��-.�w�' -'�;�r� - :sue-off��r�'•: .ip3'.- ;•r .
V /fA - ~j !
Photo Date: August 19th, 2021
AFFIDAVIT OF POSTING NOTICE
STATE OF WASHINGTON )
) ss:
COUNTY OF MASON J
RE: (Parcel#or Address of Site): 32427-00-60000(MP 319.99-19.72 of Hwy 101)
I, Julie Lewis , Planner for Mason County, do hereby certify that I have posted 1 copies
of the attached:
Notice of Application
On this 26th day of June , 2022, in 2 conspicuous
places as follows:
o One at The Site
o One at The Mason County Building One's Public Bulletin Board [411 N S 'St—Shelton, WA]
o One at
�1
In witness whereof, the party has signed this Affidavit of Posting Notice this day of
20� .
Signed by Julie Lewis
Mason County Community Services Department
615 W. Alder St—Shelton,WA 98584
Subscribed and sworn before me this 2 day of ,
202,2 , I certify that Jule— Lu,-) S signed this document.
Notary Public
State of Washington NOTARY PUBLIC in and for the State of Washington,
ARIANE M PAYSSE Printed Name of Notary: Ar cLwe_ M "SSE
MY COMMISSION EXPIRES
12/29/2025 residing at: NULL.M, CGIMA
My Commission Expires: ( Z 2oZ
(Notary Seal)
PUBLIC NOTICE
Notice of Application Administrative
Shoreline Substantial Development Permit
Notice is hereby given that Hood Canal
Communications, who is the applicant for
the following proposal, has filed an appli-
cation for an administrative Shoreline Sub-
stantial Development Permit (SHR2022-
00008) to directionally drill path for fiber
optic cable under the Hamma Hamma
River in an existing highway right of way.
Location: Hwy 101 MP 319.99 to 319.72
Parcel Number: 32427-00-60000 Zoning:
RR5(Rural Residential 5), RNR(Rural Nat-
ural Resource) Date of complete Applica-
tion: May 20, 2022 Notice of Application:
May 26, 2022 Public Comment Deadline:
June 25, 2022 Notice of Decision will be
issued: on or after June 25, 2022 A public
hearing will not be held regarding the pro-
posed project, however written comments
may be submitted to the Planning Depart-
ment during this 30-day shoreline public
comment period to: Mason County, Plan-
ning Department,Attn:Julie Lewis, 615 W.
Alder Street, Shelton, WA 98584, by June
25, 2022. The subject file application and
decision can be viewed by all interested
parties at the Permit Assistance Center,
located at above address during normal
business hours. Following the public com-
ment deadline, a copy of the decision will
be forwarded to all parties of record (only
those who provided comment(s)during the
30-day public comment period),the appli-
cant, Dept. of Ecology, and Attorney Gen-
eral only.The referenced decision may also
be viewed at the Permit Assistance Center
during normal business hours by interested
parties. Please note that there is a 14-day
appeal period following the issuance date
PUBLIC NOTICES
of said decision. Timely appeals shall be
filed with the Mason County Planning De-
partment in accordance with the require-
ments stipulated in MCC 15.09 and 15.11
A SEPA DNS was issued on May 25,2022,
with a comment period extending to June
8, 2022. Please contact Julie Lewis of the
Mason County Department of Community
Development at (360) 427-9670 ext. 357,
or at the address listed above, with ques-
tions regarding this permit application.
3494 May 26 1 t
Publication Cost Agreement
Publication cost is the responsibility of the applicant. Final permit processing
will not occur until advertising fees have been paid to the newspaper by the
applicant. The Shelton-Mason County Journal will bill the applicant directly.
Billing Address:
" 1)(4 ChklQi `-QVn1Y7 J/7 J CCL4. n::) Email: m ike oef-
P.O . &x ;�,4a
41 n (G/I . 0,/A MS T 2- Phone:
I / WE understand that I / WE must sign and date the attached
acknowledgment indicating and that I / WE understand that is MY / OUR
responsibility. I / WE must submit the signed page as part of application in
order for it to be considered as complete.
Signature of Property Owner Date Print Name
OR
A ��/l I2c)?2-
Signature of Applicant Date Print Name