Loading...
HomeMy WebLinkAboutRelocate Schaefer State Park Campground 3 parcels - SEP Determinations - 11/18/2020 -31A Q,rf d _ Don Hoch DirectorPL K`; STATE OF WASHINGTON WASHINGTON STATE PARKS AND RECREATION COMMISSION 1111 Israel Road S.W. • P.O. Box 42650•Olympia, WA 98504-2650 •(360)902-8500 TDD Telecommunications Device for the Deaf: 800-833-6388 www.parks.state.wa.us STATE ENVIRONMENTAL POLICY ACT MITIGATED DETERMINATION OF NON-SIGNIFI �/Vc C� Date of Issuance: October 20, 2020 61,5 Nov 18 Project Name: Schafer State Park Campground Relocation Alder Str eet Proponent: Washington State Parks and Recreation Commission Lead agency: Washington State Parks and Recreation Commission Description of proposal: The Washington State Parks and Recreation Commission(State Parks) proposes the development of a new campground loop on the eastern side of Schafer State Park. This proposal includes development of a new campground loop with new campsites and cabins, a new comfort station, a new welcome center, and associated utilities. This new campground will maintain recreational opportunity and allow for the future removal and restoration of the existing campsites located along the river on the western side of the park; these campsites experience annual flooding damage and require extensive repairs to maintain. Location of Proposal: Schafer State Park is located at 1365 W Schafer Park Rd, Elma, WA 98541 in Mason County. The project site is found within Sections 29 & 32, Township 19 N, and Range 6 W and tax parcels 619293060020, 619322060010, and 619322060000. The approximate coordinates of the project site are: 47.0977400 N lat./-123.466499°W long. Threshold Determination: The Lead Agency has determined that this proposal will not have a probable significant adverse impact on the environment. Pursuant to WAC 197-11-350(3),the proposal has been clarified, changed, and conditioned to include necessary mitigation measures to avoid, minimize or compensate for probable significant impacts. An environmental impact statement(EIS) is not required under RCW 43.21 C.030(2)(c). This decision was made after review by the Lead Agency of a completed Environmental Checklist and other information on file with the Lead Agency. State Parks will implement the mitigation measures listed below to avoid,minimize or compensate for any potential significant impacts to Earth,Water and Transportation. Refer to the indicated sections of the attached Environmental Checklist for the rationale for requiring the following measures: SW Capital Program • 1111 Israel Road SW• P.O. Box 42650 • Olympia, WA 98504-2650 • (360)725-9750 Schafer State Park Campground Relocation MDNS October 13,2020 Page 2 of 2 I. Earth. The contractor will prepare a Temporary Erosion and Sediment Control (TESC) plan using the Department of Ecology's Best Management Practices (BMPs) and most current stormwater manual to control and minimize the risk of erosion. The Plan will be submitted to Mason County for approval prior to any commencement of work. II. Water. To mitigate for potential impacts to wetland buffers caused by fill for the proposed Welcome Center and paving associated with the proposed camp loop and associated campsites, State Parks will complete wetland buffer enhancement plantings within impacted buffers. ® This MDNS is issued under 197-11-340(2); the lead agency will not act on this proposal for 14 days from the date below. Comments must be submitted by November 4, 2020 or they may not be considered. Responsible Official: Chelsea Hamer Position/Title: Environmental Planner Phone: (360) 725-9764 Address: 1111 Israel Rd SW I PO Box 42650 Olympia, WA 98504-2650 Date: JOctober 20, 2020 Signature: - 01,11 "All Washington State Parks are developed and maintained for the enjoyment of all persons regardless of age, sex, creed,ethnic origin,or physical limitations." There is no agency SEPA appeal;however,all comments are welcome and will be thoroughly considered. SEPA ENVIRONMENTAL CHECKLIST A. Background aelpl 1. Name of proposed project,if applicable: Schafer State Park:Campground Relocation 2. Name of applicant: Washington State Parks and Recreation Commission 3. Address and phone number of applicant and contact person: Washington State Parks and Recreation Commission Attn:Chelsea Harris Eastern Region Headquarters 270 9th Street NE,Suite 200 East Wenatchee,WA 98802 chelsea.harris(@parks.wa.gov (509) 860-3192 4. Date checklist prepared: August 2020-October 2020 5. Agency requesting checklist: Washington State Parks and Recreation Commission 6. Proposed timing or schedule(including phasing,if applicable): Construction of Phase I is anticipated to be completed in Spring-Fall 2021.The construction timing for future phases has not yet been determined. 7. Do you have any plans for future additions,expansion,or further activity related to or connected with this proposal?If yes,explain. The existing campsites subject to flooding on the west side plan to be removed in the future and the site restored, following completion of the east side improvements.To the extent practicable,this SEPA checklist considers the potential foreseeable environmental impacts associated with future project actions. Additional SEPA reviews will be conducted at the earliest possible opportunity during the planning process pursuant to WAC 197-11-055.Depending upon the nature of the proposal,some future projects may be considered categorically exempt from additional review under SEPA(WAC 197-11-305).Categorically exempt projects do not require preparation of an environmental checklist or threshold determination.All future projects will be in compliance with State Parks policy as well as local,state,and federal environmental regulation. 8. List any environmental information you know about that has been prepared,or will be prepared,directly related to this proposal. o The Watershed Company,2020.Schafer State Park Wedand and Stream Delineation.Elma,Washington. 115 pages. o Health and Associates Inc.,2020.Schafer State Park Traffic Assessment.Seattle,Washington. 16 pages. SEPA Environmental checklist(WAC 19741-960) January 2018 Page 1 of 15 o Landau Associates,2020.Geotechnical Report.Schafer State Park Campground Relocation Phase I Design. Tumwater,Washington. A Critical Areas Report is forthcoming;if this analysis identifies new environmental considerations not covered in this checklist,an amendment to this document or revised checklist will be completed,as necessary. 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal?If yes,explain. There are no pending applications for government approvals of other proposals affecting the property. 10. List any government approvals or permits that will be needed for your proposal,if known. Mason County:Conditional Use Permit,Shoreline Substantial Development Permit,Critical Areas Review. 11. Give brief,complete description of your proposal,including the proposed uses and the size of the project and site.There are several questions later in this checklist that ask you to describe certain aspects of your proposal.You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.) Schafer State Park is a 120-acre camping park located on the East Fork of the Satsop River in Mason County.This park offers recreational opportunities including camping,picnicking,wildlife viewing,fishing,swimming,wading,and boating.Most of the existing campsites are located within the 100-year floodplain of the river;annual flooding of the park results in seasonal closures of the campground and requires extensive repair and maintenance. The existing campground located on the west side of W.Schafer Park Road experience annual flooding impacts from seasonal flooding of the East Fork Satsop River.This project includes the development of new day-use and campground loop roads on the eastern side of the park—east of W.Schafer Park Road.The area proposed for development is a former group camp area where laminated root rot required the removal of Douglas fir trees in the past;as a result,this area of the park is already mostly cleared and contains some existing infrastructure in the form of gravel roads,gravel campsites,and a vault toilet. Construction for this project is proposed in multiple phases;work proposed for each known phase is outlined below. The existing campsites subject to flooding on the west side of the park also plan to be removed in the future and the site restored,following completion of the east side improvements. Phase I o Site preparation for all proposed improvements of both phases (vegetation removal,clearing,grading,filling). o Provide new park entry and park loop road utilizing existing entrance to ranger residence/shop area and emergency exit to West Satsop Cloquallum Road. o Provide new camp loop with 18 partial hookup campsites,4 walk/bike-in primitive campsites,and 2 cabins. o All sites will include water and electric hookup utilities;camp host site will also include sewer hookup. o Provide new comfort station for camp loop. o Provide associated utilities for campsites and proposed structures (electric,water and sewer lines,new drain field, new reservoir). o Provide park-associated signage. o Provide pedestrian paths from camp loop to river and to amenities. o Provide stormwater treatment(filter strips or sheet flow into established or planted native vegetation). o Provide fencing/vegetation screening around ranger residence and existing shop compound. o Provide native plantings and grass seed to disturbed areas. o Provide mitigation plantings in wetland buffers. Phase II o Provide 6 new cabins within camp loop. o Provide new welcome center near park entrance. SEPA Environmental checklist(WAC 197-11-960) January 2018 Page 2 of 15 r 12. Location of the proposal.Give sufficient information for a person to understand the precise location of your proposed project,including a street address,if any,and section,township,and range,if known.If a proposal would occur over a range of area,provide the range or boundaries of the site(s).Provide a legal description, site plan,vicinity map,and topographic map,if reasonably available.While you should submit any plans required by the agency,you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. Schafer State Park is located at 1365 W Schafer Park Rd,Elma,WA 98541 in Mason County.The project site is found within Sections 29&32,Township 19 N,and Range 6 W and tax parcels 619293060020,619322060010,and 619322060000.The approximate coordinates of the project site are:47.0977400 N lat./-123.466499°W long.Please see Figure 1 below for a vicinity map. Schafer State Park Scchadfer St-aft :,deen Garden( �. rr••-r• .10 isl �3 ee ,Googfe Earth Figure 1.Vicinity Map B. Environmental Elements help 1. Earth VjgI4 a. General description of the site(circle one): Flat olling,hilly,steep slopes,mountainous,other: b. What is the steepest slope on the site(approximate percent slope)? 15% SEPA Environtnental checklist(WAC 197-11-960) January 2018 Page 3 of 15 c. What general types of soils are found on the site(e.g.,clay,sand,gravel,peat,muck)?If you know the classification of agricultural soils,specify them and note any agricultural land of long-term commercial significance and whether the proposal results in removing any of these soils. o Solduc gravelly loam,5 to 15 percent slopes. o Juno gravelly sandy loam,0 to 3 percent slopes along the river. d. Are there surface indications or history of unstable soils in the immediate vicinity?If so,describe. No,there are no indications or history of unstable soils in the immediate vicinity of the proposal. The existing campground on the western side of the park experiences annual flooding of the East Fork Satsop River which results in movement of sediments and debris of varying sizes along the shoreline.This project includes the development of a new campground loop road and welcome center on the eastern side of the park—east of W.Schafer Park Road,where soils are not subject to annual flooding and sediment movement. e. Describe the purpose,type,total area,and approximate quantities and total affected area of any filling, excavation,and grading proposed.Indicate source of fill. Some tree removal,clearing,and grubbing is required to prepare for the development of the campground. Approximately 209,000 SF of clearing and grubbing is proposed.This includes clearing for impervious surfaces and a general 2-5-foot area adjacent to the proposal for use during construction.The proposal includes approximately 3,966 cubic yards (CY) of cut and 3,299 CY of fill.The source of fill will be determined by the contractor. f. Could erosion occur as a result of clearing,construction,or use?If so,generally describe. It is possible that erosion could occur as a result of ground disturbing activities associated with this project.Best management practices and temporary erosion control measures such as the use of silt fencing and coin logs will be implemented to minimize and avoid potential erosion during construction activities.Disturbed areas will be promptly seeded or mulched following the completion of the project;erosion control measures will remain in place until soils are stabilized. g. About what percent of the site will be covered with impervious surfaces after project construction (e.g., asphalt or buildings)? The site includes 77,993 square feet(SF) of existing impervious surfacing within the project area(approx. 12%),and a total of 104,304 SF of impervious surfacing is proposed(approx. 16%);this total amount includes the reuse of some existing impervious surfaces on the site. h. Proposed measures to reduce or control erosion,or other impacts to the earth, if any. Best management practices and temporary erosion and sediment control(TESL)measures will be implemented to prevent and minimize potential erosion;erosion control measures will remain in place until soils are stabilized through revegetation.The temporary 2-5-foot clearing for construction described in B.1.e will be finished with topsoil and mulched with wood chips and will allow for reestablishment of native vegetation. 2. Air Jelp I a. What types of emissions to the air would result from the proposal during construction,operation,and maintenance when the project is completed?If any,generally describe and give approximate quantities if known. Construction activities may create some temporary vehicle and equipment exhaust and dust emissions.The use of this equipment may result in localized,short term emissions and potential fugitive dust.The completed project will have no long-term air emissions. SEPA Environmental checklist(WAC 197-11-960) January 2018 Page 4 of 15 b. Are there any off site sources of emissions or odor that may affect your proposal?If so,generally describe. There are no off-site sources or emissions that would affect the proposed project. c. Proposed measures to reduce or control emissions or other impacts to air,if any: Best Management Practices (BMPs)will be used during construction to minimize potential fugitive dust.Examples of BMPs would include Motorized equipment will meet required emission standards and will be turned off when not in use. 3. Water V1e14 a. Surface Water: hel W 1. Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams,saltwater,lakes,ponds,wetlands)?If yes,describe type and provide names.If appropriate,state what stream or river it flows into. Yes,below is a list of all water bodies on or near the project site. o East Fork Satsop River is a shoreline of the state(type S)with a 150 foot buffer. o Wetland A is a Category II wetland with a 225 foot buffer. o Wetland B is a Category III wetland with a 110 foot buffer. o Wetland F is a Category II wetland with a 110 foot buffer. o Wetland G is a Category II wetland with a 110 foot buffer. 2. Will the project require any work over,in,or adjacent to(within 200 feet)the described waters?If yes, please describe and attach available plans. Yes,portions of this project are proposed within 200ft of the East Fork Satsop River and will also include work within the buffers of Wetlands A,B,F,&G.Work proposed within the shoreline and Wetland A&B buffers includes the development of campsites and associated partial hookup (water and electric)utilities,pedestrian trails (paved and gravel),and mitigation plantings;work proposed within Wetland F&G buffers includes improvements to the campground entrance road,a new welcome center and associated road and parking development. 3. Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected.Indicate the source of fill material. No fill or dredge material will be placed in or removed from surface waters or wetlands.There will be approximately 33,812 SF of impacts to wetland buffers which will be mitigated through wetland buffer enhancement plantings. 4. Will the proposal require surface water withdrawals or diversions?Give general description,purpose,and approximate quantities if known. No. 5. Does the proposal lie within a 100-year floodplain? If so,note location on the site plan. Yes,portions of the project are located in the floodplain,see Figure 2 below. SEPA Environmental checklist(WAC 197-I1-960) January 2018 Page 5 of 15 Schafer State Park Campground Relocation - FEMA Floodplain f.4.� �MM Raw G Rip. EiY.Pnr1 � �f Project Location 1:8.209 U OAS 0.1 02ml FEMA FIRM Map AO, ■ 0 �.1 02 0.4km A. OPEN WATER, A E, S.u�.C.t N[li.CM.M h ..—I P cup"GEMM.UW5. T Ef iNo,NPs,NAUVt Yu—,a.-C—t IM.K.rff.N4 Od--S.—S C.f AE, FLOODWAY �'t NLIt C.. Ra°K..d 10 UN31-1mv ;.ti Ih.G C.U.f C...nlr R`..C.dgwRG Iswr Rhp JyohaR.f Cal�i✓r,U_n SAG.UMS.NG&UK NPS IRd.d Ov 1 Figure 2. FEMA Floodplain Map SEPA Environmental checklist(WAC 197-11-960) January 2018 Page 6 of 15 6. Does the proposal involve any discharges of waste materials to surface waters?If so,describe the type of waste and anticipated volume of discharge. No,the proposal does not involve any waste materials to surface waters. b. Ground Water. hel j 1. Will groundwater be withdrawn from a well for drinking water or other purposes?If so,give a general description of the well,proposed uses and approximate quantities withdrawn from the well.Will water be discharged to groundwater?Give general description,purpose,and approximate quantities if known. The existing well will service the new campground loop and the project includes the replacement of an existing reservoir system to accommodate the new campground loop. 2. Describe waste material that will be discharged into the ground from septic tanks or other sources,if any (e.g.,domestic sewage,industrial,agricultural,containing the following chemicals...,etc.).Describe the general size of the system,the number of such systems,the number of houses to be served(if applicable),or the number of animals or humans the system(s) are expected to serve. This project includes the installation of a new drainfield for the new comfort station proposed to service the new campground loop. c. Water runoff(including stormwater): 1. Describe the source of runoff(including stormwater) and method of collection and disposal,if any (include quantities,if known).Where will this water flow?Will this water flow into other waters?If so, describe. Sources of runoff include the increased impervious surface from the development of the campground.Runoff will continue to sheet flow into undisturbed,native topsoil and vegetation as it currently does. 2. Could waste materials enter ground or surface waters?If so,generally describe. It is possible that waste materials (e.g.,oil from leaking vehicles/equipment,etc.) could potentially enter ground water or surface waters during construction;however,the project will implement BMPs,such as the use of fiber rolls and/or silt fences and requiring the contractor to maintain vehicles in good working order,during construction as preventative avoidance measures. 3. Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site?If so,describe. The proposal will not significantly affect drainage patterns.The source of runoff will be the impervious surfaces associated with the proposal,including buildings,pavement,and gravel surfaces.All runoff will continue to sheet flow as it currently does to surrounding native vegetation. d. Proposed measures to reduce or control surface,ground,and runoff water, and drainage pattern impacts,if any: None proposed as the project is not anticipated to affect drainage patterns.Stormwater will continue to sheet flow from impervious surfaces to adjacent native vegetation. 4. Plants Bidpl a. Check the types of vegetation found on the site: ® Deciduous tree:alder,maple aspen,other ® Evergreen tree: fir,cedar,pine,other ® Shrubs SEPA Environmental checklist(WAC 19741-960) January 2018 Page 7 of 15 ® Grass ❑ Pasture ❑ Crop or grain ❑ Orchards,vineyards or other permanent crops. ® Wet soil plants:cattail,buttercup,bullrush,skunk cabbage,other ❑ Water plants:water lily,eelgrass,milfoil,other ❑ Other types of vegetation b. What kind and amount of vegetation will be removed or altered? Approximately 209,000 SF of clearing and grubbing is proposed to prepare the site for development.This includes clearing for the impervious surface and a general 2-5 foot area adjacent to the proposal for use during construction. Approximately 89 trees will be removed;many of these are saplings. c. List threatened and endangered species known to be on or near the site. There are no threatened or endangered plant species known to be on or near the site. d. Proposed landscaping,use of native plants,or other measures to preserve or enhance vegetation on the site, if any: The proposal includes plantings as part of the new campground and mitigation for the impacts to some of the identified wetland buffers.The planting schedule includes the following species:snowberry,Western hemlock,shore pine,red osier dogwood,vine maple,salmonberry,Pacific crabapple,ocean spray,Western swordfem,beaked hazelnut,Western red cedar,grand fir,cottonwood,and willow.The temporary clearing for construction purposes as described in BAb will be replanted,seeded,or finished with topsoil and mulched with wood chips to allow reestablishment of native vegetation. e. List all noxious weeds and invasive species known to be on or near the site. The Washington State Noxious Weed List Class B and C noxious weeds have been recorded on or near the project site: o Scotch broom(Cytisus scoparius)is a Class B noxious weed, o Himalayan blackberry(Rebus armeniacus)is a Class C noxious weed, o Reed Canarygrass (Phalaris arundinacea) is a Class C noxious weed, o English Ivy(Hedera hibernica)is a Class C noxious weed. 5. Animals iel a. List any birds and other animals which have been observed on or near the site or are known to be on or near the site.Examples include: Birds:hawk heron_eagle,songbirds,other: Mammals:deer,bear,elk,beaver,other: Fish:bass,salmon,trout,herring,shellfish,other: SEPA Environmental checklist(WAC 197-11-960) January 2018 Page 8 of 15 b. List any threatened and endangered species known to be on or near the site. Based on WDFW's Priority Habitat and Species (PHS) on the web and U.S.Fish and Wildlife Service's Environmental Conservation Online System (ECOS)online mapper and Information for Planning and Consultation(iPaC)website (accessed August 20,2020): o Steelhead(Oncorhynchus myki s) state candidate,federally threatened o Chinook salmon (Oncorhynchus tshawytscha)state candidate,federally threatened o Coho salmon (Oncorhynchus kisutch)federally threatened o Chum salmon (Oncorhynchus keta)state candidate,federally threatened o Bull Trout(Salvelinus confluentus) state candidate,federally threatened o Marbled Murrelet(Brachyramphus marmoratus) state endangered,federally threatened o Streaked Horned Lark(Eremophila alpestris strigata) state endangered,federally threatened o Yellow-billed Cuckoo(Cocg us americanus) state endangered,federally threatened o Bald Eagle(Haliaeetus leucocephalus)Non-BCC(Birds of Conservation Concern) o Great Blue Heron(Ardea Herodias fanninz)BCC o Rufous Hummingbird(Selasphorus rufus)BCC c. Is the site part of a migration route?If so,explain. Schafer State Park is located within the Pacific Flyway migratory route and the East Fork Satsop River is a migratory route for anadromous salmonids. d. Proposed measures to preserve or enhance wildlife,if any: No measures are proposed to preserve or enhance wildlife,as no impacts are anticipated. e. List any invasive animal species known to be on or near the site. There are no known invasive species to be on or near the site. 6. Energy and Natural Resources llelpI a. What kinds of energy(electric,natural gas,oil,wood stove,solar)will be used to meet the completed project's energy needs?Describe whether it will be used for heating,manufacturing,etc. Electricity will be needed for lighting and heating for the comfort station,cabins,and the new welcome center; electricity will also be needed for the new campsites'hookups. b. Would your project affect the potential use of solar energy by adjacent properties?If so,generally describe. No,the proposal will not affect the potential use of solar energy by adjacent properties. c. What kinds of energy conservation features are included in the plans of this proposal?List other proposed measures to reduce or control energy impacts,if any: Standard energy conservation features include water heaters,low flow appliances,motion detection lights,and radiant floor heating. 7. Environmental Health idpi a. Are there any environmental health hazards,including exposure to toxic chemicals,risk of fire and explosion,spill,or hazardous waste that could occur as a result of this proposal?If so,describe. It is possible that vehicles and equipment could spill or leak hazardous materials,primarily petroleum products (e.g.,gas,oil and lubricants)during construction activities.Best management practices,such as proper SEPA Environmental checklist(WAC 197-11-960) January 2018 Page 9 of 15 maintenance of vehicles and inspection for leaks prior to use,will be used to prevent contamination resulting from the use of vehicles and other equipment. 1. Describe any known or possible contamination at the site from present or past uses. Per the U.S.Environmental Protection Agency's Multisystem Search,and Ecology's Cleanup Site Search and What's in My Neighborhood interactive mapping tool,there are no recorded releases of hazardous substances. 2. Describe existing hazardous chemicals/conditions that might affect project development and design. This includes underground hazardous liquid and gas transmission pipelines located within the project area and in the vicinity. There are no existing hazardous chemicals or conditions that might affect project development and design. 3. Describe any toxic or hazardous chemicals that might be stored,used,or produced during the project's development or construction,or at any time during the operating life of the project. Vehicles and construction equipment used for construction require petroleum products(e.g.,gas,oil and lubricants).Vehicles and/or machinery may be stored at staging areas during construction periods.Their use in the project area will be short-term and temporary.Best management practices,such as regular inspection for leaks prior to use,will be implemented to prevent contamination. 4. Describe special emergency services that might be required. There are no special emergency services that would be required because of this proposal. 5. Proposed measures to reduce or control environmental health hazards,if any: Best Management Practices (BMPs),including proper maintenance of vehicles and equipment,and inspection for leaks prior to use,will be implemented to prevent contamination.Machine operators are required to have proper training to run equipment safely.Regular maintenance and administrator vehicles will be required to have spark arresters,fire extinguishers or some other type of fire prevention equipment. b. Noise 1. What types of noise exist in the area which may affect your project(e.g.,traffic,equipment,operation, other)? Noise in the area includes natural sounds and sounds from park visitors that are recreating in the park. 2. What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (e.g.,traffic,construction,operation,other)?Indicate what hours noise would come from the site. Operation of construction equipment will result in a temporary,short-term increase in noise levels along the trail. Equipment operations will only occur during standard daylight hours and all vehicles transporting materials will have mufflers to help minimize noise. This proposal could result in an increase in human noise near the new campsites.However,any increase in noise would be minimal and well within permissible environmental noise levels. 3. Proposed measures to reduce or control noise impacts,if any: The project will meet all requirements of WAC 173-60-040 Maximum permissible environmental noise levels. Potential noise impacts will be reduced or controlled by: 1)using BMPs during construction;2)limiting work to daylight hours;and 3)requiring contractors to meet noise control requirements for vehicles and equipment. SEPA Environtnental checklist(WAC 197-11-960) January 2018 Page 10 of 15 8. Land and Shoreline Use hel a. What is the current use of the site and adjacent properties?Will the proposal affect current land uses on nearby or adjacent properties?If so,describe. The site is used for recreation as a State Park.Activities include camping,hiking,bird watching,fishing,and swimming. Adjacent properties are primarily residential and forest land. b. Has the project site been used as working farmlands or working forest lands?If so,describe.How much agricultural or forest land of long-term commercial significance will be converted to other uses as a result of the proposal,if any?If resource lands have not been designated,how many acres in farmland or forest land tax status will be converted to nonfarm or non-forest use? No. 1. Will the proposal affect or be affected by surrounding working farm or forest land normal business operations,such as oversize equipment access,the application of pesticides,tilling, and harvesting?If so,how? No,the project will not affect or be affected by working farm or forest land operations in the vicinity. c. Describe any structures on the site. Schafer State Park currently includes: o 41 campsites (32 tent pads,9 utility sites) o Building utilized for registration, o Two walk-in primitive campsites interpretation,and a store o One group camp with capacity for 100 people o Ranger residence o Two comfort stations (one of which has a o Shop building shower) o Three miles of trail o One vault toilet near the small group camp o Historical marker o One vault toilet near the large group camp o Volleyball field o Approximately 42 day use parking spaces o Horseshoe pits o Approximately 42 picnic sites o Amphitheater o Two kitchen shelter o Dump station d. Will any structures be demolished?If so,what? Yes,a vault toilet located within the footprint of the new campground loop will be demolished as a part of this proposal. The existing campsites subject to flooding on the west side of the park plan to be removed in the future and the site restored,following completion of the east side improvements.Additional SEPA reviews will be conducted for any future proposals. e. What is the current zoning classification of the site? Rural Residential 10. f. What is the current comprehensive plan designation of the site? Public. g. If applicable,what is the current shoreline master program designation of the site? Rural. SEPA Environmental checklist(WAC 197-11-960) January 2018 Page 11 of 15 r h. Has any part of the site been classified as a critical area by the city or county? If so, specify. Yes,wetlands and floodplain. i. Approximately how many people would reside or work in the completed project? No people would reside in the completed project.This proposal will not result in any changes to State Parks current staffing levels. j. Approximately how many people would the completed project displace? None. k. Proposed measures to avoid or reduce displacement impacts,if any: Not applicable,the proposed project will not result in any displacement impacts. 1. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: Applicable permit applications will be submitted to Mason County to ensure that the project is compatible with existing and projected land uses and plans. m. Proposed measures to reduce or control impacts to agricultural and forest lands of long-term commercial significance,if any: Not applicable,no impacts to agriculture and forest lands are anticipated. 9. Housing llel a. Approximately how many units would be provided,if any?Indicate whether high,middle,or low-income housing. None,the project does not propose any residential use. b. Approximately how many units,if any,would be eliminated? Indicate whether high,middle,or low- income housing. None. c. Proposed measures to reduce or control housing impacts,if any: Not applicable,the project will not result in any housing impacts. 10. Aesthetics el a. What is the tallest height of any proposed structure(s),not including antennas?What is the principal exterior building material(s)proposed? The tallest proposed structure is the comfort station measuring approximately 19 feet tall.The exterior includes rock facade and cedar board and batten to match the existing theme of park structures. b. What views in the immediate vicinity would be altered or obstructed? The development of a new campground and welcome center will alter the views of the eastern side of the park, however,the east side of the park is a former group camp area and is already developed.Native vegetation plantings along the shoreline of the East Fork Satsop River will also alter the view of the park from the river. SEPA Environmental checklist(WAC 197-I1-960) January 2018 Page 12 of 15 c. Proposed measures to reduce or control aesthetic impacts,if any: Project actions will be guided by design standards that help to minimize potential visual impacts using appropriate building materials,colors,sizes,shapes,and other design elements,such as landscaping.Project actions may also help to preserve and enhance existing visual characteristics on site through a variety of means including restoration of degraded sites,sensitive placement of more intrusive facilities to more shielded locations,and through the use of landscape buffering. 11. Light and Glare BIL14 a. What type of light or glare will the proposal produce?What time of day would it mainly occur? None,this project does not propose any lighting or reflective surfaces that could produce glare. b. Could light or glare from the finished project be a safety hazard or interfere with views? No,there will be no glare associated with the finished project.Minimal lighting will be provided at the comfort station. c. What existing off-site sources of light or glare may affect your proposal? None,there are no existing off-site sources of light or glare that will affect the proposal. d. Proposed measures to reduce or control light and glare impacts,if any: Not applicable,the project will not result in any light or glare impacts.Light distribution will be managed to avoid artificial lights in camping areas to preserve quality of habitat and visitor experience. 12. Recreation VLel91 a. What designated and informal recreational opportunities are in the immediate vicinity? The proposed project is located at Schafer State Park which offers a range of recreational opportunities.Activities include camping,hiking,bird watching,fishing,and swimming. b. Would the proposed project displace any existing recreational uses?If so,describe. No,displacement of any recreational activities is not anticipated as part of this proposal.The intention of the project is to shift existing recreational opportunities from the west side of the park where seasonal flooding occurs,to the east side of the park.The existing campsites on the western side of the park will not be removed until the new campground is constructed to avoid loss of recreational opportunity. c. Proposed measures to reduce or control impacts on recreation,including recreation opportunities to be provided by the project or applicant,if any: The purpose of this proposal is to maintain existing recreational opportunities.The intention of the project is to shift existing recreational opportunities from the west side of the park where seasonal flooding occurs,to the east side of the park. 13. Historic and cultural preservation ViglPI a. Are there any buildings,structures,or sites,located on or near the site that are over 45 years old listed in or eligible for listing in national,state,or local preservation registers?If so,specifically describe. Schafer State Park contains a National Register listed historic district. The historic district boundary coincides with the park boundary;therefore,the entire project takes place within the historic district.Eleven contributing resources (i.e.,buildings,structures,and/or features) comprise the historic district.The campground development is in an area that contains no resources that contribute to the historic district;however,the one way access loop road is in the vicinity of a few contributing buildings. SEPA Environmental checklist(WAC 197-11-960) Januaty 2018 Page 13 of 15 J b. Are there any landmarks,features,or other evidence of Indian or historic use or occupation?This may include human burials or old cemeteries.Are there any material evidence,artifacts,or areas of cultural importance on or near the site?Please list any professional studies conducted at the site to identify such resources. No Native American sites are known in the park as documented by a recent cultural resources survey with extensive shovel testing.Nine of eleven contributing resources to the National Register district are within the study area,but none will be impacted by the proposed project. Jenks,James and Ryan Ives 2020 Cultural Resources Survey for the Washington State Parks and Recreation Commission's Schafer State Park Campground Relocation Project Mason County,Washington. c. Describe the methods used to assess the potential impacts to cultural and historic resources on or near the project site.Examples include consultation with tribes and the department of archaeology and historic preservation, archaeological surveys,historic maps,GIS data,etc. Under Governor's Executive Order 05-05 compliance,consultation partners included the Department of Archaeology and Historic Preservation and interested tribes. As stated above a cultural resources study with background research preceded project construction,undertaken by qualified archaeologists and a historian. d. Proposed measures to avoid,minimize,or compensate for loss,changes to,and disturbance to resources. Please include plans for the above and any permits that may be required. As there are no project impacts to cultural resources,no mitigation measures are proposed. 14. Transportation ftlpl a. Identify public streets and highways serving the site or affected geographic area and describe proposed access to the existing street system.Show on site plans,if any. West Schafer Park Road provides access to the park.Access to the site will include one new gated emergency driveway extending north from West Satsop Cloquallum Road.Any new driveway will be designed in accordance with Mason County standards. b. Is the site or affected geographic area currently served by public transit?If so,generally describe.If not, what is the approximate distance to the nearest transit stop? There are no public transit services that provide access to the park c. How many additional parking spaces would the completed project or non-project proposal have?How many would the project or proposal eliminate? Approximately 25 parking spaces are proposed,and the proposal will not eliminate any parking spaces. d. Will the proposal require any new or improvements to existing roads,streets,pedestrian,bicycle or state transportation facilities,not including driveways?If so,generally describe(indicate whether public or private). No new roads or improvements to existing streets would be needed for the proposed project. e. Will the project or proposal use(or occur in the immediate vicinity of)water,rail,or air transportation? If so,generally describe. No,the proposal will not occur in the vicinity of water,rail,or air transportation. SEPA Environmental checklist(WAC 197-11-960) January 2018 Page 14 of 15 f How many vehicular trips per day would be generated by the completed project or proposal?If known, indicate when peak volumes would occur and what percentage of the volume would be trucks (such as commercial and non-passenger vehicles).What data or transportation models were used to make these estimates? This proposal will not generate more vehicular trips than the park already experiences. g. Will the proposal interfere with,affect or be affected by the movement of agricultural and forest products on roads or streets in the area?If so,generally describe. No,the proposal is not anticipated to affect or be affected by the movement of agriculture and forest products on roads or streets in the area. h. Proposed measures to reduce or control transportation impacts,if any: No significant transportation impacts are anticipated because of this project. 15. Public Services ftl a. Would the project result in an increased need for public services (e.g.,fire protection,police protection, public transit,health care,schools,other)?If so,generally describe. No,the project will not result in an increased need for public services. b. Proposed measures to reduce or control direct impacts on public services,if any. Not applicable. 16. Utilities jhelpj a. Cirgigaalties curre ailable at the site electricity natural gas water refuse service telephone sanitary sewe septic system ther b. Describe the utilities that are proposed for the project,the utility providing the service,and the general construction activities on the site or in the immediate vicinity which might be needed. This proposal includes the installation of a new comfort station and welcome center that will include water,sewer, and electricity as associated utilities.A new drainfield,new water reservoir,and campsite utilities (water and electricity)are also associated with this proposal. C. Signature h�� The above answers are true and complete to the best of my knowledge.I understand that the lead agency is relying on them to make its decision. Signature: Name of signee: Chelsea arris Position and Agency/Organization:Environmental PlannerWashington State Parks and Recreation Commission Date Submitted:October 16,2020 SEPA Environmental checklist(WAC 197-11-960) January 2018 Page 15 of 15 N f NEW PARKING LOT i - _ i 1 7 FUTURE PHASE I UD N0. PN WD 1111111111C E,YFAR,11 I J /WORK ONE WAY LOOP DRIVE # , FUTURE WELCOME CENTER / _ \ WETLAND F S _ O' EXISTING ®PARKING LOTAREA wooD 4=— — RESTROOM .� --- _ FENCE EMERGENCY ACCESS < BYPASS LANE FENCES / STAFF HOUSING ® / C PEDESTRIAN y ACCESS TO , GATE / / _ \ — / // B :. /SEPTIC TANK % ENTRY SIGNAGE /' ` ~ / TRAIL,TYP. '�� �/�"�—/ WALL FUTURE PHASE € AFF ENTRAN E \ (/ WETLAND G / I , WORK rn°N BY oe E / / 1 j V // �• t , C q11 DES 14 . IGNED 8 6 20 W SATSOP CLOQUALLUM RD $ / // / / y// / \ `" oxAwN xloc a e 20 // PEDE TRIAN ATE B 2C1 / �Q' /TENT PAD,TYP, aLaEo IN rs. XXx a 6 ®ACESS DRIVE j/ / / // ( MAINTENANCE SHED - 1 i PROPERTY LINE ` $/' /n - , I i/ // EXISTING&PROPOSED' DUMP ' yY// T 1 VEGETATION a, TYP. STATION / / i� \ SHOP' / // / �IsreaBos.�P i li , //// C �/ MAINTENANCE ODD WASHINGTON /FUTURE / SHED O J� STATE PHASE WORK / // / k v O` H ' O 0 FJE PARKS i/ / / /i^ _ // %/( / \ tV /�r• / �Q _———— 1D AND O j \ �J % — — __ oQ FUTURE CABIN cB c �j —/ RECREATION FUTURE i\, RIVE \ O ET S,TYP. i ® ` COMMISSION PHASE WORK ONE WAY D \ / v /b __ l ° ' ! o / f / o°p o j — o ° SCHAFER �O a'O cAMPSrrE,TYP. STATE PARK PROPOSE D DRAINFIELD CAMPGROUND \ GATE /4 FUTURE /� co) o / RELOCATION _ \ PHASE PROJECT PHASE 1 WORK WATER&ELECTRICAL / O __ O o LAYOUT PLAN A ,EXISTING WELL HOUSE \ PEDESTAL,TYP. — ' / �-"L Zip v 1 EMERGENCY ACCESS TO W SATSOP CLOQUALLUM RD 9/ . O Q i SHEET 10 OF 39 SEE CALLO TTBB�, �./ EE�LLOUT A O QOO c O �^� 30. \ i \ ( /� PARKS FILE# E FUTURE DAY USE DRIVE \ CAD NO. YAAIINOE-0RD]EQ�OE-YFARiRBUM \ FUTURE CABIN SITE, �'� \ TYp, EXISTING RIVER TRAIL WATER&ELECTRICAL \ WETLAND B RIVER $ 1 PEDESTAL,TYP. \ RIVER EDGE _— \� ACCESS WETLAND A 1 \ all ------ \ CI. FIRE RING k\°'� RIVER ACCESS 1 \ / ✓ \ $ A < /n PAD,TYP.`\ O \\\\ \\ -l7a'JO' �� oes�oEn 8 6 TENT PAD, w,_ na s 6 zo TYP. S —m—) oo s 6 zo ' / / �, 1 4• \4- & \ / �,•\�" \ �T a ED00 is. na Ei 6 20 \\\ q� s CAMPSITE i LO / HOST SITE / / J </'a• \ / ° \1 \\\� '`` WASHINGTON TqA,, STATE udw O DRAINFIELD V\\ v. // •/ \ — \Q — \\ \ PARKS pmrm //~ \ / ASPHALT PATH AND fq0�� a RECREATION COMMISSION NEW COMFORT STATION ar Cry /l — y SCHAFER 1 ::� NEW PLANTING OUNO LO \ ' .�- _—I — �W-0 `^� Q►-- _ `` STATE PARK f-y" A9 —— \ `'�/ CAMPGROUND a ' / _ `�——— __ Q/ / RELOCATION ADA CAMPSITES / t ' — 1 / �aY _—— _ PROJECT PHASE 1 'PROPOSED& EXISTING i (� r VEGETATION,TYP. L—— �,i�/ \ \\ LAYOUT PLAN B YARD ----� DUMPSTERS AN PRIMITIVE PRIMITIVE SITES SHEET 11 OF 39 / ' J _TRAIL,TYP. ——————'�----- =— _i IPATH TO I POTENTIAL DRAINFIELD RESERVE RIVER ACCESS SC4LE IF ROAD EDGE W SATSOP CLOQUALLUM RD PROPERTY LINE PAPX5 FREO