HomeMy WebLinkAboutHMP Habitat Managment Plan - 2/2/2021 Habitat Management Plan
Parcel# 32235-32-00020
XXX State Route 106 pc
Union, WA 98592
Mason County
VED
961t^ 0?2�20
615 VV glder
StreE?t
Report prepared for: 71T ANMNG
Frihet Trust, CL l�ll�lll�l
Philip N Bayley Trustee
8791 E State Route 106 Re�'S�'`' ��rS�o
Union WA 98592 SG"
Prepared by:
Rob Nagel
680 E Philura Ln
Shelton, WA 98584
arctosaerial@gmail.com
(425) 344-9315
(360) 229-3118
... ARCTOS
AERIAL
Environmental Consultation I Drone Imagery
Project: 2020-H M P-205
December 2020
S
Project: 2020-HMP-205 December 2020 AtRIAL ARCTOCTO
Table of Contents
Overview................................................................................................................1
PropertyDescription..............................................................................................2
Analysis of Potential Impacts.................................................................................3
MitigationMeasures..............................................................................................4
Monitoring .............................................................................................................8
Summary................................................................................................................8
References............................................................................................................10
List of Figures
Figure1: Vicinity Map ............................................................................................2
Figure 2: Map depicting parcel & buffers...............................................................3
Figure3: Site Plan...................................................................................................9
i
ARCTOS
Project: 2020-HMP-205 December 2020 AERIAL
Habitat Management Plan
32235-32-00020
XXX E State Route 106
Union, WA 98592
Overview
This report details a Habitat Management Plan (HMP) for the above referenced
property in Mason County, Washington. The purpose of this report is to address
potential adverse impacts from the construction of a Single-Family Residence
(SFR) within the buffer of Hood Canal, a designated shoreline of the State of
Washington. The Mason County Shoreline Master Program (SMP) requires a 100
foot buffer with an additional 15 foot building setback for saltwater shorelines.
(see figure 1). The SFR is proposed at the common-line setback, which is
approximately, 12-14 feet from the ordinary high-water mark of the Hood Canal.
The proposed building site is currently maintained with gravel above a concrete
bulkhead and is mostly devoid of vegetation. Mitigation measures have been
designed to offset the potential impacts of this activity on the ecological functions
of the shoreline buffer. The objectives of this report are as follows:
• Identify potential impacts of the construction of the proposed structure
within the shoreline buffer on the buffer's ecological functions and fish and
wildlife habitat.
• Determine mitigation measures that would offset those impacts and result
in a net benefit to ecological functions and fish and wildlife habitat within
the remaining buffer.
i
Project: 2020-HMP-205 December 2020 ARCTOS
AERIAL
OL
13 Mason County WA GIS
PY
�.a
vl
SROROYiSN Vlllt
YCEWEM PRAIRIE
� { &n.N6lE.Gvmin.FAO.NOA/�U M.E
Figure 1:Vicinity map of project.
Property Description
The parcel is 0.05 acres in size and located in the NW% of the SW% of section 35,
Township 22 North, Range 3 West. The site is mostly maintained in gravel.
Invasive species that occur on the site include scotch broom and English ivy. A
concrete bulkhead replacement was finalized in November 2020 and an on-site
sewage design permit was issued in March 2020.
The mason County Shoreline Master Program requires a 100ft buffer with an
additional 15ft structure setback, which encompasses the entire subject property.
Also, the minimum allowable "commonline" setback of 35ft does not leave
enough developable area on the lot to accommodate a structure and on-site
sewage system. Therefore, a Shoreline Variance is being requested to allow the
structure to be constructed at the actual "commonline," which is 12ft at its
closest point to the shoreline.
2
A RCTOS
Project: 2020-HMP-205 December 2020 AERIAL
�s
r,R
�e
Figure 2:Map showing Hood Canal,the regulated 100'buffer as the solid yellow line and the 115'structure setback as the
dashed yellow line.The red polygon is the parcel in question,and the black hashed polygon is the proposed structure.
Analysis of Potential Impacts
Vegetated buffers serve an important role in protecting critical public resources,
as well as fish and wildlife habitat from adverse impacts associated with
development. Below are the potential adverse impacts to ecological function
associated with the construction of this proposed structure within the shoreline
buffer.
- Increased storm-water runoff and erosion
Impervious surfaces such as roofs and driveways contribute to increased
flow of runoff during storm events. This increased flow could contribute to
erosion and increased sediment reaching the Hood Canal without a proper
storm water management plan.
3
A RCTOS
Project: 2020-HMP-205 December 2020 AERIAL
- Shoreline de-stabilization
Removing of buffer vegetation and increasing storm water run-off can
speed erosion of shorelines and make them unstable. This project site is
located on a lot with an existing concrete bulkhead. No vegetation removal
is proposed, and no increased risk of erosion is anticipated.
- Loss of wildlife habitat
The development footprint of this structure within the buffer is limited to
±1,061ftz and no native vegetation will be removed in the construction
process since the project site is already mostly devoid of vegetation.
Mitigation measures including native plantings will actually increase the
amount of wildlife habitat and have a net ecological benefit to the
shoreline buffer.
- Increased disturbance from noise pollution
A temporary increase in noise from construction activities is likely to occur.
but activities will be limited to daylight hours, and the project is located in
an area of the shoreline where human noises are a common occurrence.
Also, no known nesting sites or priority habitats and species have been
identified near the project site.
- Increased Solar input
The proposed structure is sited on the south side of the Hood Canal on a lot
mostly devoid of vegetation. No native vegetation will be removed in the
process of construction. The structure itself and native plantings within the
lot will benefit the shoreline by increasing shade and reducing solar input.
Mitigation Measures
To avoid, minimize, and mitigate for the potential adverse impacts identified
above, the following have been identified as appropriate measures for this
project:
4
Project: 2020-HMP-205 December 2020 A RCTOSAERIAL
- Minimizing/avoiding impact
The proposed project minimizes the impact to the shoreline buffer by
minimizing the square footage of the proposed structure within the
buffer to approximately ±1,061ft2. The structure will be constructed in
an area already devoid of vegetation above an existing concrete
bulkhead.
- Best Management Practices for construction
Construction activities related to this project will be restricted to
favorable weather conditions and best management practices for
reducing disturbance and erosion will be followed, including placing
straw over exposed areas, and erecting silt fencing below the project
area. Equipment will be checked daily for leaks and all fuel, lubricant,
and chemicals will be stored outside the shoreline buffer.
- Clustering of development
All activities related to this project will be clustered to the extent
possible without impacting more of the shoreline buffer than necessary.
Equipment and materials will be parked/stored outside the shoreline
buffer when possible.
- Removal of invasive species
All occurrences of invasive species in the vicinity of the project site and
mitigation area will be mechanically removed without the use of
chemical herbicides.
- Landscaping with native plant species
Any landscaping within the lot area will be limited to native plant
species typically found in undisturbed shoreline areas. Species selected
will include common shoreline vegetation not currently on the property
which will result in a net increase in species richness and biodiversity
within the buffer. An estimated total area of±600ft2 will be restored to
native vegetation through scattered landscaping around the structure
and by installing biofiltration swales.
5
ARCTOS
Project: 2020-HMP-205 December 2020 AERIAL
- Treating storm-water runoff
Roof runoff will be directed from the downspouts to 35ft long and 2ft
wide biofiltration swales running along the East and West sides of the
structure before transitioning to the dispersion area. The swales will be
designed according to the Washington State Department of Ecology's
current design recommendations.
Planting Guidelines (per Appendix C of the Mason County Resource
Ordinance)
Earthwork
Machinery earthwork will be restricted to removing existing gravel in order to
implement this restoration plan; planting holes for specified vegetation
installation will be hand dug.
Native Plantings
It is recommended that native plantings be installed within 10 foot wide
restoration zones in linear strips extending across the site parallel to the edge of
the buffer to achieve the following densities:
Trees — 10' on center
Shrubs — 5' on center
Ferns—4' on center
The general plan calls for installing single trees, or clusters of three shrubs, on
approximate 10-foot centers. Each row will alternate between 5 trees + 3 shrub
clusters or 4 trees + 4 shrub clusters starting from the edge closest to the
identified critical area proceeding to the edge of the buffer. Specifically for stream
ravine replanting, cedar will be the first type of tree installed within the first row
at the top of the ravine, and then incrementally changing one cedar tree to a fir
through the first six rows, with all fir trees thereafter or to the edge of the buffer
whichever comes first. Exact placement of installed materials will be up to the
landscape installer, following the basic 10-foot spacing pattern prescribed. Finally,
a native ground cover planting or sword fern will be randomly installed
throughout the planting row on average four-foot centers. These densities have
been selected to provide a moderately dense, structurally diverse plant
6
Project: 2020-HMP-205 December 2020 A RCTOSAEC I i 1
community within the restoration area. Volunteer native vegetation can be
counted towards the target densities of restoration plants.
Typical native plant species that may be used with the restoration zone include:
Trees: Western red cedar (Thuja plicata) — 2 or 3 gallon
Douglas fir (Pseudotsuga menziesii) — 2 or 3 gallon
Western hemlock (Tsuga heterophylla) - 2 or 3 gallon
Grand fir (Abies grandis) — 2 or 3 gallon
Cascara (Rhamnus purshiana) — 2 or 3 gallon
Cottonwood (Populus balsamifera) — 2 or 3 gallon
Shrubs: nootka rose (Rosa nutkona) — 1 gallon
salmonberry (Rubus spectabilis) — 1 gallon
salal (Gaultheria shallon) — 1 gallon
evergreen huckleberry (Vaccinium ovotum) — 1 gallon
twinberry (Lonicera involucrate) — 1 gallon
snowberry (Symphorocarpus olbus) — 1 gallon
elderberry (Sambucus racemosa) — 1 gallon
red osier dogwood (Cornus stolonifera) — 1 gallon
Ferns: sword fern (Polystichum munitum) — 1 gallon
All planting should occur during winter dormancy. The optimum time for planting
is from February to March.
Installation
Installation of the prescribed vegetation will be performed by qualified
landscapers familiar with planting of native vegetation in natural settings.
Installation will be performed only after home construction on the property is
completed to avoid damage to the plantings from construction activities. All
installed vegetation shall be marked with colored flagging to facilitate monitoring
inspections. A separate "as-built" plan will be provided by the landscaper if the
planting pattern or schedule deviates from that listed within this document.
Fertilizing
Artificial fertilizer may be applied to each planting hole in the form of "slow-
release" tablets or some other similar material. However, general broadcast
fertilization MAY Not be used within the landscape planting area.
Project: 2020-HMP-205 December 2020 ARCTOS
AERIAL
Maintenance
Maintenance of the installations will be the responsibility of the landscape
installer. Maintenance is to include and weeding or watering necessary to ensure
plant survival for up to three years after the date of installation.
Monitoring
Following the implementation of the mitigation measures, an annual report will
be submitted to the county for 3 years post construction. The report will detail
the presence of new, or the reoccurrence of any invasive species. Invasive species
found on site will again be removed mechanically, using hand tools only to reduce
disturbance to the shoreline buffer. The annual report will also document the
planting success of any native species and the success of the biofiltration swales
at controlling storm-water runoff.
If any failures of mitigation measures are identified during the annual inspection,
corrective actions will be recommended in the report and will be taken by the
property owner to restore them to working order as soon as possible.
Summary
This report Identifies potential impacts of the construction of a proposed SFR,
±1,061ft2, within the regulated buffer of a Shoreline of the State of Washington.
The proposed building site, 12 feet from the Shoreline edge at its closest point, is
currently devoid of vegetation and provides little benefit to the shoreline and its
buffer. Mitigation measures have been proposed to avoid, minimize, and mitigate
for those impacts on the shoreline buffer's ecological functions and fish and
wildlife habitat. Successful implementation of the proposed mitigation measures
will result in a net benefit to the shoreline and its buffer's ecological functions,
structural diversity, and species richness. Mitigation measures include re-
establishing native vegetation, improving site drainage, and treating storm-water
runoff.
8
Project: 2020-HMP-205 December 2020 ARVI OS
AERIAL
References
Environmental Laboratory. (1987). "Corps of Engineers Wetlands Delineation Manual,"Technical Report
Y-87-1, U.S. Army Engineer Waterways Experiment Station,Vicksburg, Miss.
Guard,J. (1995).Wetland Plants of Oregon &Washington. Lone Pine Publishing. 240 pp. Edmonton,
Alberta, Canada.
Hruby,T. (2014). Washington State Wetland Rating System for Western Washington:2014 Update.
(Publication#14-06-029). Olympia,WA:Washington Department of Ecology.
Munsell Color(Firm). (2009). Munsell soil color charts :with genuine Munsell color chips. Grand Rapids,
MI
Pojar,J.and A. MacKinnon. 1994. Plants of the Pacific Northwest Coast (Revised Edition 2014). Lone Pine
Publishing. 528 pp.Vancouver, British Columbia,Canada.
United States Department of Agriculture, Natural Resources Conservation Service. 2010. Field Indicators
of Hydric Soils in the United States,Version 7.0. L.M.Vasilas, G.W. Hurt,and C.V. Noble (eds.).
USDA, NRCS, in cooperation with the National Technical Committee for Hydric Soils.
U.S.Army Corps of Engineers 2018. National Wetland Plant List,version 3.4, http://wetland-
plants.usace.army.mil/U.S.Army Corps of Engineers, Engineer Research and Development
Center Cold Regions Research and Engineering Laboratory, Hanover, NH
U.S.Army Corps of Engineers. 2010. Regional Supplement to the Corps of Engineers Wetland
Delineation Manual:Western Mountains,Valleys,and Coast Region (Version 2.0), ed.J. S.
Wakeley, R. W. Lichvar, and C. V. Noble. ERDC/EL TR-10-3.Vicksburg, MS: U.S.Army Engineer
Research and Development Center.
10
Julie Lewis
From: Street, Laura E (DFW) <Laura.Street@dfw.wa.gov>
Sent: Thursday,June 3, 2021 2:51 PM
To: Julie Lewis
Cc: jsammons@skokomish.org; Sarff, Dana; shlanay1 @skokomish.org
Subject: RE: Bayley Revised Habitat Management Plan
Attachments: WDFW Comments Bayley Habitat Management Plan V2.pdf
Hey Julie,
Attached is my comments for the revised HMP for the Bayley residence. I do not need the remainder of the comment
period to review the new Habitat Management Plan. Let me know if you have any questions or need anything else for
me.
Cheers,
Laura Street
Area Habitat Biologist
Washington Department of Fish and Wildlife
360-490-2087
Laura.Street@dfw.wa.gov
From:Julie Lewis<JLewis@co.mason.wa.us>
Sent: Friday, May 21, 2021 4:19 PM
To: Street, Laura E (DFW) <Laura.Street@dfw.wa.gov>
Cc:jsammons@skokomish.org; Sarff, Dana <dsarff@skokomish.org>; shlanayl@skokomish.org
Subject: Bayley Revised Habitat Management Plan
Importance: High
External Email
Hello,
The Habitat Management Plan (report dated February 2021)for a proposed residence located on Hood Canal for Philip
Bayley was sent on April 5, 2021. It has been requested to instead use the revised version dated March 2021. Due to the
significant differences in the revised HMP, a new comment period has been opened in order to allow for proper review
of the HMP. The public hearing regarding this project took place on May 12, 2021. No further public hearing is scheduled
at this time. The county would like to request a reduced comment period regarding the HMP.The comment period will
be reduced only if both WDFW and the Skokomish Indian Tribe respond approving the reduction. If no response is
received or either entity requires the full 28 day comment period,the full period will be honored which will end on June
18, 2021.The March 2021 HMP has been attached to this email as well as the Addendum to the Staff Report prepared in
response to the revised HMP.
Please let me know if you need anything,
Julie
Julie Lewis I Planner
Mason County Community Services
Office#360-427-9670 ext.357
Telework#360-474-7605
Jlewis@co.mason.wa.us.
2
A RCTOS
Project: 2020-HMP-205 December 2020 AERIAL
Lot Line ARCTOS
Hood Canal
r
Existing Concrete AERIAL
,. ;;
Bulkhead ,. } . �� � �. t -
_nvironmental Consulting I Drone Imagery
PO Box 2466
s. x Shelton, WA 98584
i t s4 •. . (425) 344-9315
arctosaerial@gmail.com
J .
www.arctosaerial.com
t A i
Setback �--"' - y� ` - ----- o
Commonline S f sod r o 0
$w CD N
.3 C N Vl
00
rrn0
Proposed Structure ,_ Q
(1,061 ftz) ' �` N S_
N
: . v X
- _ � X
00
1r 1 ysf!r{rr rnlow-
—
Map created by: Rob Nagel
' December 3rd 2020
Revison:
Biofiltration
" - Swales N
,• [ ,• -
0 5 10 15 20 ft
9
Scale: 1 " = 10'
ARCTOS
Project:2020-HMP-205 December 2020 AERIALERIAL
Mitigation Area ' ,T + • A
RCTOS
50
( 0ft2)
f oi, AERIAL
Environmental Consulting I Drone Imagery
4- ' �I e {r f.. PO Box 2466
+ ► r y" ' Shelton,WA 98584
* :"v (425)344-9315
��,� ,�y s .,r•-•• ✓ ;. �`;Z!?��,:;y; arctosaerialCa 9maiLcom
www.arctosaerial.com
x I f
/ 01 0
f V
/ (ZZ V1
00
N 'J
Ln
Ln
i F O Nru
U ' p
@ w
X :D
Proposed �, ro X
/ Structure a
r -
/ Map created by: Rob Nagel
s / January 29th, 2021
Revison:
BioNtration Swales
(150ft2) -
Legend
single tree or cluster of 3 shnj[,.
N
>� Shrubs
Ferns,grasses,or ground-cover _ 0 3 6 9 12 R
F_?MitigationArea . :u'r -
Brofiltration Swales Q
Scale: 1, _ 5,
RCTOS
Project:2020-HMP-205 December2020 X A AERIALERIAL
Lot Line ARCTOS
Hood Canal AERIAL
Existing Concrete X.,-
Bulkhead Environmental Consulting I Drone Imagery
PO Box 2466
Shelton,WA 98584
• t: . (425)344-9315
arctosaerialCgmaiLcom
r "<" www.arctosaerial.com
ation Area - a
M;t;g w u
v
Commonline Setback r0 / o 9.0
o c�
:3 00 m
CC o
Proposed Structure G m of Q
v
1 061 ftz N Y �
m N
• � X �
M X
BO
a
.a
Map created by: Rob Nagel
December 3rd, 2020
5, Revison: 1/21/2021
5'
Biofiltration
Swales(150ft2) N
0 5 10 15 20 ft
I I I I 11
Scale: 1" = 10'