Loading...
HomeMy WebLinkAboutShoreline Pre-Inspection - SPI Inspections - 3/3/1993r k P M 4 o b s _ DEPARTMENT OF COMMUNITY DEVELOPMENT N T Z7oJ N Y, aDY Planning-Landfill-Ut111t12S rasa March 3, 1993 Brad Carey 3 a % 3 D U1 -� O, �1(j P.O. Box 1021 Issaquah,WA 98027 RE: Shoreline pre-inspection. Section 7, T.22N, R.3WWM. Lots 1 & 2 of Olympic Beach. An inspection of the subject property was conducted on Tuesday, March 2. The following information are the partial findings of that inspection. Enclosed, you will find information pertaining to residential development on sborelands, the Shoreline Permit process, relating to the grading associated with the establishment of the driveway and cuts necessary foi the siting of the residence. Also included is information regarding bulkhead policy, regulation and construction. Keep in mind that the residence must maintain 10'sideyard setbacks. This distance is measured from the dripline of the structure to the lot line. No structure may be built over a property line. The method used for determining the shoreyard setback is outlined in the Residential Chapter of the Mason County Shoreline Master Program, which I have enclosed. The residence may be no higher than 35 feet in height above surrounding grade. You will also need an address. I have enclosed an Address Request Form. Having a site address will aide in the permitting process and you'll need one any way. It is advisable that you contact Jay Hannon of the Mason County Public Works Department to see if there is a county road access permit on file for your property if not, you will need to get one from that department. If you have any questions about the information provided please contact this office at 427-9670, ext. 295. / =Man see, Planner ent of Community Development Gary Yando,Director of Community Development•Erik Fairchild,Planning Director Mason County Bldg.III•426 W.Cedar 4Y.O.•Box 578•Shelton,WA 98584 • (206)427-9670 Recycled l lease illustrate below the proposed building site in relation to water & property lines: w 1 S40 C' Al A � Or�p- �{ouSE 1�^e W g tr 4` 01 Non1N Departmental Review (For Office Use Only) Planning Department Findings: MASON COUNTY RECEIVED SHORELINE PRE-INSPECTION APPLICATION FEB 2 5 1993 'LrASE PRINT 4 $41 r,XEep Required / G DEPT. 1. Ofter: A r a of 0 Applicant: a - Site Address: a_'La miles opt /Vorn Applicant Address: 11 olve SE Owner Address: City: _rssRawpH St J Zip J'rV_r_ 7 City: Tflf/u Y.4, StJAA-Zip Phone: -( 1 206- 9 y of -C-7f`1 Phone: ? v�YMP�� �'��-f �2 r3•A 2. Parcel No. - - Legal Description: P ar c e 2- o F S ho r fi 3a�o� -50 -caoy3a PLAT 176G. 6-ay. r 31 S es 7a 7 T TawNsk;4 22 N, Acme-e, 3 We,ST - MdSan count•)' 3. Purpose of Pre-Inspection: T-c; ,B R e ro y-e o -P 'A"; (d S;t e LGCc,tioN Proper- .Se f - f�fK � )­20M O1'h2r -S i t-eS I.. Use of Building: N O M _ h wr c-e- 5. Is there any type of water on or adjacent to property?: saltwater _ lake river pond wetland seasonal runoff _ other Directions to Site: Fa I IQ W Nor r h S h o v e ke,A 'n MW FRo -r r' lC MtjP_�; 7- s7--0,2Az N AgI- Fxxk , 2 ro Z.' ` e- M ` t r`v `ve W ft y 0.4V L If the information is incomplete, then Mason County must disclaim any errors resulting from deficiencies in the original application. Pre-inspection reports remain valid only until development changes occur in the vicinity which affect the lot evaluated in this inspection. Applicant Signature: Date: Z 3 ,3 Return application to: Department of Community Development,Planning Division 426 W. Cedar/P.O. Box 578 Shelton, WA 98584 (206) 427-9670/1-800-562-5628 Please include a $40.00 check or money order payable to Mason County Treasurer FOR OFFICE USE ONLY: Accepted by: Date: