HomeMy WebLinkAboutBLD2007-01102 Final Detached Garage - BLD Permit / Conditions - 1/24/2008 Inspection Line(360)427-7262
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352
Mason County Bldg. III 426 W. Cedar P.O. Box 186
Shelton,WA 98584
RESIDENTIAL BUILDING PERMIT BLD2007-01102
OWNER: DARRELL CHAMBERLIN RECEIVED: 6/20/2007
CONTRACTOR: LICENSE: EXP: ISSUED: 7/20/2007
SITE ADDRESS: 2390 E MCEWAN PRAIRIE RD SHELTON EXPIRES: 1/20/2008
PARCEL NUMBER: 321330090023
LEGAL DESCRIPTION: TR 2 OF N1/2 LOT: 3 OF SP#2295#564084
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
Detached Garage E. McEwan Prairie Rd. to address.
General Information Construction &Occupancy Information Square Footage Information
No.of Bedrooms: Type of Constr.: V-B
Type of Use: 3F Insp.Area: No.of Bathrooms: Occ. Group: U-1 Lot Size: Deck:
Type of Work: ACC Fire Dist.: 5 No.of Stories: 1 Occ. Load: Building: Garage-Detached 864
Valuation: Building Height: 15 Occ. Status: Basement:
Manufactured Home Information Setback Information Shoreline&Planning Information
Make: Length: Ft. Front: N 124.0 Ft. Shoreline: Ft. Water Body: NA
SEPA?: No
E 23.0
Model: Width: Ft. Rear: 1 Ft. Slope: Ft. Shoreline Desi
Side 1: E .0 Ft. 9•: Not Applicable
Year: Serial No.: Side 2: W 76.0 Ft. Comp. Plan Desig.: Rural
Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty. Type By Date Amount Receipt
Plan Check Fee GMM 6/20/2007 $236.11 S22007000
Planning Review Fee GMM 6/20/2007 $170.00 S22007000
Building State Fee RTB 7/3/2007 $4.50 S12007000
Building Permit Fee RTB 7/3/2007 $363.25 S12007000
EH Plan Review TW 7/6/2007 $35.00 S12007000
Total $808.86
BLD2007-01102 Please referto the following pages for conditions of this permit. 1 of 5
CASE NOTES FOR
BLD2007-01102
CONDITIONS FOR
BLD20 0 7-01 1 02
1 ry A o ed er dimensions and setbacks on submitted site Ian. Setbacks are measured from the furthest projection of the structure.
pp p p 1
X
2) This pa cel is located in a smoke management zone. Please contact a fire warden at(360)427-9670 ext.459 for further information.
X
3) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division.
There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at
1-800-9,47h0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law.
X
4) The interrational code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150'from an approved
access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where
such rotes connect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road.
X
5) Application wledges that the structure is only permitted for a use consistent with the current zoning of the parcel. Zoning is RR20
X
6) Prior to final approval, all upland areas disturbed or newly3mated by construction activities shall be seeded,vegetated or given an equivalent type of
erosion protection (silt fencing or straw matting). X
7) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact
adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the
stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further
information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access
connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which
is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may
affect your Xproject.
8) All other necessary permits from Mason County, Washington State and/or Federal Agencies that aTjequired for this proposed development and
construction must be obtained PRIOR TO SAME DEVELOPMENT AND CONSTRUCTION. X
BLD2007-01102 Please refer to the following pages for conditions of this permit. 2 of 5
9) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division.
Thera are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at
1-800-6 -'- 982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law.
X
10) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will
not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building
Depart ant prior to any further inspections being performed or approvals granted.
X
t
11) Owner 4?1
ent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28.
X
12) The plan review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the
corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building
Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or
remova approved documents will result in failure of required building inspections.
X
13) This structure is approved as un-heated space. If at any time this building is to be used for anything other than what it is approved for, a change of use
permits all be applied for, reviewed and approved prior to the change.
X
14) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X
15) The"approved" site plan is required to be on-site for inspection purposes. If an inspection is requested and the"approved" site plan is not on site, then
approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the
Build in epartment prior to any further inspections being performed or approvals granted.
X
16) Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather, garage floor slabs and other
vertical concrete work exposed to the weather shall have a minimum compressive strength of 3000 psi (IRC Table R402.2).
X
17) This structure is limited to U-occupancy use only(private garages, carports, sheds, and agricultural buildings.) Any other use will be in violation of the
interns 'opal codes and Mason County Regulations unless a"Change of Use" permit is applied for, reviewed and approved.
X
18) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the
State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in
permit rev gc� .on.
X
�f-
BLD2007-01102 Please referto the following pages for conditions of this permit. 3 of 5
19), All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County
Xrdinance regulation, must be reviewed and approved by Mason County prior to construction.
20) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED
BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance
with the irternational codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building
Inspecto hall be made prior to requesting additional inspections.
X
21) All property lines shall be clearly identified at the time of foundation inspection. X ,20—
22) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
Mason�nty ordinances and building regulations.
X
23) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for
action fore aiperiod not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit
holder h e,prevented action from being taken. No more than one extension may be granted.
X
24) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners,
connect�nd flashing. Install metal connectors approved for contact with the new types of pressure treated material.
X
25) By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your"Approved Site Plan"to ensure
these structures meet the setback conditions listed.
X_
26) Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your
"Approve Plan"to ensure these structures are shown and meet the setback conditions listed.
X
27) Owner/builder assumes all responsibility if drainfield/reserve area is encumbered. X A
BLD2007-01102 Please refer to the following pages for conditions of this permit. 4 of 5
. This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at anytime after work is
commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied.Proof of continuation of
work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to
the above described property a structure for review and ins ection.
• '
OWNER OR AGENT: .'�� DATE:
BLD2007-01102 Please referto the following pages for conditions of this permit. 5 of 5
0 CONCRETE Footings MECHANICAL MANUFACTURED HOME
C) Date By
CD Ribbons >
Gas Piping 9
ou
C) Interior Date By Interior-Date By Date By M
8 Exterior Date? Z; By Exterior-Date By X
Set-up
Point r'%.olated Footings INSULATION Date By z
BG I SLAB INSULATION
F).--t e' ay
Data By FIRE DEPARTMENT
Foundation Walls >
Floors Date By X
Date B 00" By X
Y DECKS M
FRAMING was Date By
Date By Data By PROPANE TANKS
PLUMBING Vault Date By
Date By OTHER
Groundwork Attic
Date By Date BY Type:
Date By
13,w.v DRYWALL Type:
Date By Int Brace Wall Date By
Date By
FINAL INSPECTION
(D
Water Line Fire Separation
Date BY Date By Date
I U� BY CD
v —4
CD Pass or Request Inspect. 6
Type of Insp. Fail Date, Date Done By Comments
CD C)
7 f 7 -7 Z,3
(D
Zn
(n
_0
CD
0
PLANNING A PLANNING :
ALL SETBACKS ARE MEASURED
FROM THE FURTHEST
PROJECTION OF THE BUILDING
33
0 7 4• -� _
cy
Q ,
,ee a APPRWED
.� ASON COUNTY DCD PLAN ING
P SITE PLAN REQUIRED TO BE ON SITE
CHANGES SUB.;ECT TO APPROVAL
Q BY Date
� zo7
u
MASON COUNTY PERMIT NO. I
BUILDING PERMIT APPLICATION
426 W. Cedar• P.O. Box 186, Shelton, WA 98584 �
Shelton (360) 427-9670 • Belfair (360) 275-4467 - Elma (360) 482-5269
On the web www.co.mason.wa.us
APPLICANT INFORMATION CONTRACTOR INFORMATION
Owner 11 Ali Company Name
Mailing Addr ss O s f �L,,, d,.� Mailing Address
City S A r .-, State v Zip Code `f f!r S E�`9,/ City State Zip Code
Phone 11Z 7 -09 V_Z Other Ph. /// Phone Other Ph.
Lien/,T�tJoUQ1der - 70JL Contractor Reg. # Exp.
E-mailaddregs E Mail Address
Drivers ic.# I" Drivers Lic.# DOB
SEPTIC /WATER SYSTEM INFORMATION - Connect to New Septic Existing Septic
Connect to Water System Name of Water System
Well Sewer System Name of Sewer System
PARCEL INFORMATION Digit Par I No. - Fire District'
Legal Descriptiond.
i
Site Address (Please include street name, street number and city) - ej rIF
Directions to site
Will timber be cut and sold in parcel preparation?Yes/ No
Is property within 200' of Saltwater Lake River/Creek Pond
Wetland Seasonal Runoff Stream Slopes or Bluffs
Is this permit submittal the result of a Stop Work Notice,Correction Notice or other enforcement action?Yes/No
TYPE OF JOB - Newer"_Add Alt Repair Other PRIMARY RESIDENCE SEASONAL ❑
Use of Building describe Work
No. of Bedrooms No. of Bathrooms Square Footage- 1st Floor 2nd Floor
3rd Floor Basement fe
overed Deck Other Sq. ft.
Garage Attached ache Carport Attached Detached
MANUFACTURED HOME.INFORMATION - Make Model Year
Length Width Serial No �o'o'ms No. of Bathrooms
Type of Heat Replacement Unit? Yes/ No
Installer Name" a t+an No.
OWNER/BUILDER Acknowledges submission of inaccurate infor ation may result in a stop work order or permit revocation.
Acknowledgement of such is by signature below. I declare that I am the owner,owners legal representative,or the contractor. I further declare
that I am entitled to receive this permit and to do the work as proposed in the application. I declare that I have obtained the permission from all
the necessary parties. If permission is required from any easement holder or any other party in interest regarding this application or the work
proposed in the application, I have obtained permission from them to apply for this permit and conduct the work proposed. The owner or
agent on owners behalf, represents that the information provided is accurate and grants employees of Mason County access to the above
described property and structure for review and inspection. This permit/application becomes null & void if work or authorized construction is
not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY
MEANS OFA PROGRESS INSPECTION.INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION.
X -1 Date: —
e Owne trac r (indicate which one)
FOR OFFICIAL USE BEYOND THIS POINT Accepted by Date r-o- .2 0- 0-1
DEPARTMENTAL REVIEW APPROVED DENIED NOTES
Building Department r)'
Planning Department a tt
Environmental Health Department o��rl ' 6wo( 1
Fire Marshal Q'1 Z-l. .Q '
FEES VA D;
Building Permit Fee Site Inspection
Plan Review Fee o�� EH Review Fee
Plumbing & Base Fee — Planning Review Fee
Mechanical & Base fee Other
Wood /Gas/ Pellet Stove Fee State Fee
Violation Fee (7 -3 -0 Pre-Paid at Submittal
Valuation $ TOTAL FEES