Loading...
HomeMy WebLinkAboutStormwater Site Plan Review for FPA2004-00012 - PLN General - 8/6/2004 STATE.p� O SON Y= r oT z MASON COUNTY Y2 N Y oy PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER 1864, Shelton,Washington 98584 . -'' DATE: Aug. 61h, 2004 INTER-DEPARTMENTAL COMMUNICATIONS TO: Michael MacSems, DCD - Planner FROM: Alan A. Tahja, P/W - Co. Hydr. Engr. WO# PLG-04 SUBJ: Stormwater Site Plan Review NAME: Green Diamond Resource Company FPA2004-00012 Michael, A Stormwater Site Plan prepared to address potential stormwater runoff impacts anticipated from a proposed Green Diamond Resource Company forest harvest in the Mason Lake area has been received and reviewed by Public Works. Though the plan is very brief, it appears to adequately convey the applicant's intention of implementing appropriate stormwater management features and procedures during their harvest operations. Detection of silt or mud emanating from the timber harvest areas will be considered a failure of the temporary sediment and erosion control measures, and will require immediate and effective remedies. Negligence, or careless execution of the proposed stormwater erosion and sediment control measures will result in enforcement actions by the County, and could subject the applicant to civil penalties and/or fines. Please feel free to contact me at County extension 461 if you have any questions regarding these comments, or if you feel any features need further discussion or attention. Sl* r , / Al n A. Tahja File: H:\WP\Strmwtr\Reviews\GrnDnndResrc.doc ••�-,•�• VMUL:K - PUBLIC WORKS DEPT. w Date: 1U PERMIT#: 1=,�'/� Work order Author by: G` Number. �a vy. �a t)(i T of�lllork: c.►� Date: --MASON COUP"E� E AGENCY/COMPANY ,�- BILLING ADDRESS PHONE Pub. Works Person In Cha e: I t Project Time Line: (from•to dates) Project Start date: TO EsSilated. ft Date: AWmftate hom. A Z� ESTIMATEOTOTAL$*S: ` (p) Ji�34 Ema10. COST ESTIMATE .......................... --� U TOTAL.t; /1 z2-- EQUIPMENT USED: �� BAIfi { MATERIAL USED: (f7 Actual Cost - " DATE t---- PROD ar: flartx � tfours TOTAL,t EQUIPMENT USED 1�14 SZIl�1 Rik TOY � xx MATERIAL.USED: (a) BILLED OATS TOTAL ALL I 0____._� PAID DATE REC.rM CKrM I CA l I 3 i 3 z F✓ ' 3 34 �L `r/411 � Gp)z J Pv //, *Z It�wt 6P.•' a GD �e o ORM TER SITE PL 1 " =500' } VT EM177 STORM WATER SITE PLAN The majority of the area is flat ground with two natural depressions in the southwest part and a shallow swale on the east. All three of these areas have flagged leave areas that will be protected with silt fencing from storm water that originates from the gravel roads. Disturbance of the understory vegetation along the Mason Lake Road and the private property in the north east will be kept to a minimum by the use of a feller/buncher machine to fall the trees away from the road and the house and tree length yarding to reduce the volume of high fire hazard limb and top debris. The road entrances to the County's Mason Lake Road will have straw bales to filter the ditch water and be armored with clean crushed rock to minimize or prevent the tracking of dirt on the paved county road.