Loading...
HomeMy WebLinkAboutSEP2022-00030 New Cell Tower - SEP Determinations - 6/6/2022 MASON COUNTY Planning Division of Community Development Planning DEPARTMENT 615 W. Alder St. Bldg. 8, Shelton, WA 98584 360-427-9670 ext. 352 DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-340) SEP2022-00030 Description of Proposal: New Cell Tower Proponent: Verizon Wireless Location of Proposal: XXX E. McEwan Prairie Rd., Shelton, WA 98584 Parcel Number: 321334100000 Lead Agency: Mason County The Lead Agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43.21 C.030(2)(c). This decision was made after review of a completed Environmental Checklist and other information on file with the Lead Agency. This information is available to the public upon request. Please contact Malissa Paulsen at 360-427-9670 x 282 with any questions. This DNS is issued under WAC 197-11-340(2). The Lead Agency will not act on this proposal for 14 days from the date shown below, when the determination is final. Comments must be submitted to the Dept. of Community Development, 615 W Alder St, Shelton, WA 98584 by 06/20/2022. Appeal of this determination must be filed with a 14-day period following this final determination date, per Mason County Code Chapter 15.11 Appeals. MA'155M -Famisevi Jrnvie Cp, 2022. Authorized Local Government Official Date Printed by:Julie Lewis on:07/20/2021 1 1:39 AM Page 1 of I . �.EP Zo22- 0003� tom ZoZZ- OW L4 SEPA ENVIRONMENTAL CHECKLIST Purpose of checklist: Governmental agencies use this checklist to help determine whether the environmental impacts of your proposal are significant. This information is also helpful to determine if available avoidance, minimization or compensatory mitigation measures will address the probable significant impacts or if an environmental impact statement will be prepared to further analyze the proposal. Instructions for applicants: This environmental checklist asks you to describe some basic information about your proposal. Please answer each question accurately and carefully, to the best of your knowledge. You may need to consult with an agency specialist or private consultant for some questions. You may use "not applicable" or"does not apply" only when you can explain why it does not apply and not when the answer is unknown. You may also attach or incorporate by reference additional studies reports. Complete and accurate answers to these questions often avoid delays with the SEPA process as well as later in the decision-making process. The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there may be significant adverse impact. Instructions for Lead Agencies: Please adjust the format of this template as needed. Additional information may be necessary to evaluate the existing environment, all interrelated aspects of the proposal and an analysis of adverse impacts. The checklist is considered the first but not necessarily the only source of information needed to make an adequate threshold determination. Once a threshold determination is made, the lead agency is responsible for the completeness and accuracy of the checklist and other supporting documents. Use of checklist for nonproject proposals: hf e For nonproject proposals (such as ordinances, regulations, plans and programs), complete the applicable parts of sections A and B plus the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part D). Please completely answer all questions that apply and note that the words "project," "applicant," and "property or site" should be read as "proposal," "proponent," and "affected geographic area," respectively. The lead agency may exclude (for non-projects)questions in Part B-Environmental Elements—that do not contribute meaningfully to the analysis of the proposal. A. Background 1. Name of proposed project, if applicable: Verizon Wireless- WA4-RAINBOW LAKE 2. Name of applicant: Verizon Wireless SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 1 of 14 3. Address and phone number of applicant and contact person: Verizon Wireless 15900 SE Eastgate Way Bellevue, WA 98008 Bill North 425-876-2909 4. Date checklist prepared: 03/28/2022 5. Agency requesting checklist: Mason County 6. Proposed timing or schedule (including phasing, if applicable): Construction 2022/no phasing 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. No Future activity is included in this proposal or anticipated at this time 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. Phase 1 report NEPA 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. No 10. List any government approvals or permits that will be needed for your proposal, if known. SEPA Determination Building Permit 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.) The proposed facility will consist of a newly constructed 150'self-support tower designed SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 2 of 14 ` for 3 users with attached antennas and round mounted equipment cabinets with 9 emergency generator placed within a 60'x60'fenced area. 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. The address of the site is: XXX E. McEWAN PRAIRIE RD., SHELTON, WA 98584 B. ENVIRONMENTAL ELEMENTS 1. Earth a. General description of the site: (circle one)eIling, hilly, steep slopes, mountainous, other b. What is the steepest slope on the site (approximate percent slope)? There are no slopes within the immediate area of the proposed site. c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any agricultural land of long-term commercial significance and whether the proposal results in removing any of these soils. Sand and gravel. No agricultural soils. d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. No e. Describe the purpose, type, total area, and approximate quantities and total affected area of any filling, excavation, and grading proposed. Indicate source of fill. Minimal leveling is required for construction and access. f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. No erosion is anticipated SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 3 of 14 g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? The site will include 4000 square feet of new impervious surface consisting of the proposed crushed washed gravel within the fenced area and the proposed access. h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: None anticipated 2. Air a. What types of emissions to the air would result from the proposal during construction., operation, and maintenance when the project is completed? If any, generally describe and give approximate quantities if known. Temporary minor emissions will result from equipment during the construction phase. Construction practices will comply with applicable air quality regulations. Upon completion, normal vehicular traffic emissions will occur as a result of monthly maintenance visits to the facility. b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. No c. Proposed measures to reduce or control emissions or other impacts to air, if any: No emissions generated; hence no reduction measures are required. 3. Water a. Surface Water: 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. A freshwater forested/shrub wetland is shown on the Washington Fish and Wildlife report dated 08115121. It is approximately 750' south of the site location. Rainbow Like is approximately% mile to the east. 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. No 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 4 of 14 Not applicable 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. No 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. No 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. No b. Ground Water: 1) Will groundwater be withdrawn from a well for drinking water or other purposes? If so, give a general description of the well, proposed uses and approximate quantities withdrawn from the well. Will water be discharged to groundwater?Give general description, purpose, and approximate quantities if known. No water will be drawn or discharged. 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: Domestic sewage; industrial, containing the following chemicals. . . ; agricultural; etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. No waste material will be generated or discharged at this site. c. Water runoff(including stormwater): 1) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. A negligible amount of storm water runoff will result from the added crushed ground gravel included in this proposal. Total new impervious surface is 4000 SE Please see SINPPP/TESC plan included with the application. 2) Could waste materials enter ground or surface waters? If so, generally describe. No waste materials will be generated on the proposed site. SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 5 of 14 Y 3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If so, describe. No drainage patterns will be affected. d. Proposed measures to reduce or control surface, ground, and runoff water, and drainage pattern impacts, if any: No significant surface or ground water impact anticipated. Consequently, no reduction measures are required 4. Plants a. Check the types of vegetation found on the site: _X_deciduous tree: alder, maple, aspen, other X evergreen tree: fir, cedar, pine, other X shrubs _grass pasture crop or grain Orchards, vineyards or other permanent crops. wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other water plants: water lily, eelgrass, milfoil, other other types of vegetation b. What kind and amount of vegetation will be removed or altered? No vegetation will be removed. c. List threatened and endangered species known to be on or near the site. Per the Washington Fish and Wildlife report dated 08115121 the Big Brown Bat species is listed. d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: A landscape plan is not proposed. The facility will be placed in an area surrounded by existing trees and vegetation. e. List all noxious weeds and invasive species known to be on or near the site. No invasive or noxious weeds identified. 5. Animals SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 6 of 14 a. List any birds and other animals which have been observed on or near the site or are known to be on or near the site. No wildlife was observed during the site visit. Birds in the area would include songbirds. No other species were identified or observed on site. Examples include: birds: hawk, heron, eagle,Elb )lother: , other: mammals: deer, bear, elk, fish: bass, salmon, trout, herring, shellfish, other b. List any threatened and endangered species known to be on or near the site. Per the Washington Fish and Wildlife report dated 08115121 the Big Brown Bat species is listed. c. Is the site part of a migration route? If so, explain. Not known d. Proposed measures to preserve or enhance wildlife, if any: None are needed e. List any invasive animal species known to be on or near the site. None known 6. Energy and Natural Resources a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. Electricity will be used to operate the radio equipment and antennae b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. No c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: Low power consumption requirement for proposed equipment. SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 7 of 14 7. Environmental Health { a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. No 1) Describe any known or possible contamination at the site from present or past uses. There are no known contaminates from past or present use. 2) Describe existing hazardous chemicals/conditions that might affect project development and design. This includes underground hazardous liquid and gas transmission pipelines located within the project area and in the vicinity. There are no known or existing hazardous chemicals or conditions on the property. 3) Describe any toxic or hazardous chemicals that might be stored, used, or produced during the project's development or construction, or at any time during the operating life of the project. No toxic or hazardous chemicals are proposed to be used at the site. 4) Describe special emergency services that might be required. None required 5) Proposed measures to reduce or control environmental health hazards, if any: All radio frequency emissions are regulated by the Federal Communications Commission. b. Noise 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? None. Ambient noise will not affect this project. 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indi- cate what hours noise would come from the site. There will be some traffic and construction noise associated with the installation of the facility during the 4- 6 weeks of construction. Minimal noise will be generated by the communications facility when it is fully operational. There may be minimal noise associated with monthly service visits. 3) Proposed measures to reduce or control noise impacts, if any: SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 8 of 14 No noise is anticipated therefore, no measures are proposed. 8. Land and Shoreline Use a. What is the current use of the site and adjacent properties?Will the proposal affect current land uses on nearby or adjacent properties? If so, describe. The current use of the property is undeveloped. The adjacent properties to the east are residential. The proposal is unmanned and will not affect the adjacent land uses. b. Has the project site been used as working farmlands or working forest lands? If so, describe. How much agricultural or forest land of long-term commercial significance will be converted to other uses as a result of the proposal, if any? If resource lands have not been designated, how many acres in farmland or forest land tax status will be converted to nonfarm or nonforest use? No agricultural or forest land of long-term commercial significance will be converted to other uses as a result of the proposal. 1) Will the proposal affect or be affected by surrounding working farm or forest land normal business operations, such as oversize equipment access, the application of pesticides, tilling, and harvesting? If so, how: The proposal will not affect farm or forest land. c. Describe any structures on the site. None d. Will any structures be demolished? If so, what? No e. What is the current zoning classification of the site? Rural Residential 20 Acres f. What is the current comprehensive plan designation of the site? Rural g. If applicable, what is the current shoreline master program designation of the site? Not applicable h. Has any part of the site been classified as a critical area by the city or county? If so, specify. SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 9 of 14 Not known i. Approximately how many people would reside or work in the completed project? None j. Approximately how many people would the completed project displace? None k. Proposed measures to avoid or reduce displacement impacts, if any: No displacement or other impacts are anticipated; therefore no mitigation proposal is necessary. L. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: The project design will comply with Mason County codes and ordinances. The project will be placed in an area surrounded by existing trees on site. m. Proposed measures to reduce or control impacts to agricultural and forest lands of long-term commercial significance, if any: Not applicable 9. Housing a. Approximately how many units would be provided, if any? Indicate whether high, mid- dle, or low-income housing. None included in this proposal b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. None c. Proposed measures to reduce or control housing impacts, if any: No housing impact anticipated, therefore no proposal is necessary. 10. Aesthetics a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? The tower and antennas will be 150'in height. SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 10 of 14 b. What views in the immediate vicinity would be altered or obstructed? No view alteration or obstruction is anticipated. c. Proposed measures to reduce or control aesthetic impacts, if any: The proposed facility will be placed on a large undeveloped property within existing vegetation which include numerous trees. Existing on-site vegetation shall be preserved to the maximum extent possible. The proposed site location and existing vegetation help to reduce aesthetic impacts. 11. Light and Glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur? None b. Could light or glare from the finished project be a safety hazard or interfere with views? No c. What existing off-site sources of light or glare may affect your proposal? None d. Proposed measures to reduce or control light and glare impacts, if any: None are anticipated 12. Recreation a. What designated and informal recreational opportunities are in the immediate vicinity? None b. Would the proposed project displace any existing recreational uses? If so, describe. No c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: None 13. Historic and cultural preservation SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 11 of 14 a. Are there any buildings, structures, or sites, located on or near the site that are over 45 years old listed in or eligible for listing in national, state, or local preservation registers ? If so, specifically describe. None known b. Are there any landmarks, features, or other evidence of Indian or historic use or occupation? This may include human burials or old cemeteries. Are there any material evidence, artifacts, or areas of cultural importance on or near the site? Please list any professional studies conducted at the site to identify such resources. A NEPA checklist will be completed prior to construction c. Describe the methods used to assess the potential impacts to cultural and historic resources on or near the project site. Examples include consultation with tribes and the department of archeology and historic preservation, archaeological surveys, historic maps, GIS data, etc. A NEPA checklist will be completed prior to construction d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance to resources. Please include plans for the above and any permits that may be required. There are no anticipated loss, changes to, or disturbance of resources. Therefore, no measures to avoid are proposed. 14. Transportation a. Identify public streets and highways serving the site or affected geographic area and describe proposed access to the existing street system. Show on site plans, if any. The site will be accessed off McEwan Prairie Road. b. Is the site or affected geographic area currently served by public transit? If so, generally describe. If not, what is the approximate distance to the nearest transit stop? Not applicable c. How many additional parking spaces would the completed project or non-project proposal have? How many would the project or proposal eliminate? No parkin spaces will be eliminated. Occasional maintenance personnel will utilize raveled g p p 9 parking area at the entrance of the site. d. Will the proposal require an new or improvements to existing roads, streets, pedestrian, P P q Y p 9 bicycle or state transportation facilities, not including driveways? If so, generally describe (indicate whether public or private). No SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 12 of 14 e. Will the project or proposal use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. No f. How many vehicular trips per day would be generated by the completed project or proposal? If known, indicate when peak volumes would occur and what percentage of the volume would be trucks (such as commercial and nonpassenger vehicles). What data or transportation models were used to make these estimates? One vehicle semi-monthly. Typical maintenance schedule. g. Will the proposal interfere with, affect or be affected by the movement of agricultural and forest products on roads or streets in the area? If so, generally describe. No h. Proposed measures to reduce or control transportation impacts, if any: None are necessary 15. Public Services a. Would the project result in an increased need for public services (for example: fire protection, police protection, public transit, health care, schools, other)? If so, generally describe. No. The site is unmanned. There is no increased need for public services beyond those which are already provided. b. Proposed measures to reduce or control direct impacts on public services, if any. None 16. Utilities a. Circle utilities currently available at the site: electricity, natural gas, water, refuse service, telephone sanitary sewer, septic system, other b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. Century Link—Fiber and utility trenching Mason County PUD—power and utility trenching SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 13 of 14 C. Signature The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. r Signature: Name of signee Bill North for Verizon Wireless Position and Agency/Organization Verizon Wireless Representative Date Submitted: April 1, 2022 SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 14 of 14 NorthRECEIVED MAY 2 5 2022 P.O. Box 2449 Snohomish,WA98291-2449 615 W. Alder Street '<� Phone (425)876-2909 Fax (425)671-0862 e-mail:billnorth@northgroup.net n , MEMORANDUM Date: April 1, 2022 To: Mason County Vby Community Services 44P 615 W Alder St Shelton, WA 98584. V(i� From: Bill North The North Group, Inc. Subject: Verizon Wireless Rainbow Lake Request for approval of a Building Permit and SEPA determination for a Wireless Communication Facility On behalf of Verizon Wireless,we are submitting an application for a Building Permit and SEPA determination for a Wireless Communication Facility located at XXX E McEwan Prairie Rd., Shelton,WA 98584 (Parcel # 32133-41-00000). Verizon Wireless proposes to construct a new wireless communications facility. The proposed facility will consist of a newly constructed 150' self-support tower designed for 3 users with attached antennas and ground mounted equipment cabinets with emergency generator placed within a 60'x60' fenced area. The following documents are enclosed: One (1) Building Permit applicationC4M 2D-22— OOD LA5 One (1) SEPA Checklist 502022 - COO'''O Two (2) Construction Plans One (1) Site Plan One (1) Tower erection plan One (1) Structural Calculations One (1) Geotechnical Report 6 eO 20 22 — oc�o I S One (1) Special Inspections Form If you have any questions regarding the enclosed materials,please feel free to contact me at 425.876.2909. Thank Y you for our time. Y Bill North