Loading...
HomeMy WebLinkAboutFIR2023-00031 - FIR Inspections - 10/2/2023 MASON COUNTY FIR20" - 0OC3 • COMMUNITY SERVICES Building,Planning,Environmental Health,Community Health Mason County Fire Protection System Permit Application/Underground System Incomplete applications will not be accepted Owner: Puget Sound Evergreen Jim Padden Phone#: 360-275-6014 Mailing Address: 1080 NE Old Belfair Hwy City: Belfair State: WA Zip: 98528 Site Address: 1080 NE Old Belfair Hwy City: Belfair State: WA Zip: 98528 Parcel #: 123201093290 Legal Description: Fire Panel Change Out less than(10)devices Contractor: Fire Solutions NW LLC Phone #: 855-876-3473 Address: PO Box 1167 City: Allyn State: WA Zip: 98524 Contractor Registration#: 603555167 (UBI #) Expiration Date: 5-31-24 Building Square Fo tage (existing& proposed): lst / 2nd / 3rd Building Use: Occupancy Classification: Construction Type: Type of System: Type of Work: Sprinkler: New System: Wet Dry Modification: Standpipe: Wet Dry Fire Underground Automatic Fire Alarm: Fire Pump Hood & Duct: Dry Chem: Wet Chem: UL certified Monitoring company: Phone #: Contractors Bid Price: $14,000.00/ It�.� Ills»ed7'0yn Pet I:\Community DevelopmentTUILDING\Fire Protection System Permit Application.doc Plan Submittal Requirements Your plan submittal shall include the following_ 1. Plans shall be on standard 24"x 36"paper,drawn to scale with dimensions and north arrow. 2. Site and Floor plan with cross sectional and exterior elevations. 3. Location of occupancy and/or area separation walls,partitions, stairway enclosures,concealed spaces, etc. 4. Cut sheets and/or references for all new devices. 5. Location/description of all new and existing devices. 6. Battery calculations. 7. Wiring diagrams per floor or zone overlaid on an accurate floor plan. 8. Electrical riser diagram showing all zones,circuits,devices,and end—of—line resistors. 9. Hydraulic calculations. 10. Copy of Contractors bid. 11.Underground Systems; a) NICET FPE Certification b) Underground Civil drawings c) Bedding detail d) Truss blocking/Mega Lugs detail e) Depth/Material for burial fl Pipe size and Type Fees The permit fee will be assessed based on the submitted contractor bid for the project. A plan review fee will be calculated at 65%of the permit fee. Contractor's Affidavit I certify that I am a currently registered contractor in the State of Washington. I am aware of the ordinance requirements regulating the work for which the permit is issued and certify that all work will be in compliance with this ordinance. No changes will be made without first obtaining approval from the Mason County Fire Marshal. By: � Date: 10/2/23 I:\Community DevelopmenABUILDINGTire Protection System Permit Application.doc