PROJECT DESCRIPTION: DEMOLISH EXISTING COAL SILOS ISSUED: 11/13/2023
SITE ADDRESS: 2321 W DAYTON AIRPORT RD SHELTON
EXPIRES: 05/11/2024
PARCEL: 420090060000
APPLICANT: Martin,Jessica OWNER: STATE OF WASH;DEPT CORRECT WCC
612 Woodland Square Loop DEPT CORRECTNS;PROP UNIT
Lacey,WA 98503 SHELTON,WA 98584
3602927230
FEES: Paid Due
State Fee-Residential $6.50 $0.00
Technology Flat Convenience $5.00 $0.00
Fee
Demolition Fee $120.00 $0.00
Totals : $131.50 $0.00
REQUIRED INSPECTIONS
Connection has been verified by Health or Utilities Demolition Final Inspection
CONDITIONS
* The Washington State Clean Air Act prohibits the burning of any construction or demolition debris in an outdoor fire.
" The demolition and disposal of demolition debris must meet requirements as per Mason County regulations. it is unlawful
for any person to cause or allow the demolition (or major renovation)of any structure unless all asbestos containing
materials have been removed from the area to be demolished.work shall not commence on an asbestos project or
demolition unless the owner or operator has obtained written approval from ORCAA @ 2490 B Limited Lane NW, Olympia
WA 98502, 360-586-1044, 800-422-5623,www.orcaa.org
Printed by:Nikita Huckabey on:11/16/2023 10:02 AM
Page 1 of 2
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
DEMO BLD2023-01332
* OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit
revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or
contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained
permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The
owner or authorized agent represents that the information provided is accurate and grants employees of Mason County
access to the above described property and structure(s)for review and inspection. This permit/application becomes null &
void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of
180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT
APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION.
" All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
" Proper erosion and sediment control practices must be used on the construction site and adjacent areas to prevent upland
sediments from entering the aquatic environment. Erosion control measures must be in place prior to any clearing, grading,
or construction. These control measures must be effective to prevent soil from being carried into surface water by
stormwater runoff.Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of state
regulations. Any work in or adjacent to waterways that will adversely affect water quality must receive specific prior
authorization from the Department of Ecology.Silt fencing, straw matting, etc. must be installed and maintained until seeding
or upland vegetation has become established around all areas disturbed or newly created by construction activities.
All construction debris must be removed from the site after project completion to an approved location. Proper disposal of
construction debris must be on land in such a manner that debris cannot enter or cause water quality degradation of aquatic
environments.
For public safety, it is the responsibility of the applicant to confirm through written verification all utility services (electric,
gas,water, sewer, ...) have been terminated prior to demolishing a structure.
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of any other state/local law regulating construction or the performance of construction.
Issued By:
Contractor or Authorized Agent: Date:
Printed by:Nikita Huckabey on:11/16/2023 10:02 AM
Page 2 of 2
INSPECTION CARD
Mason County
615 W. Alder St.
Building 8, Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
PERMIT# BLD2023-01332 PROJECT ADDRESS 2321 W DAYTON AIRPORT RD SHELTON, WA 98584
PARCEL# 420090060000 PROJECT DESCRIPTION Demolish existing coal silos
OWNER STATE OF WASH;DEPT CORRECT WCC ADDRESS DEPT CORRECTNS;PROP UNIT PHONE 1.561.669.3838
CONTRACTOR ADDRESS PHONE
CONTRACTOR LICENSE LENDER
INSPECTION INSP DATE Comments INSPECTION INSP DATE Comments
Connection has been verified by I Demolition Final Inspection
INSPECTION CARD
Mason County
x 615 W. Alder St.
Building 8, Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
PERMIT# BLD2023-01332 PROJECT ADDRESS 2321 W DAYTON AIRPORT RD SHELTON, WA 98584
PARCEL# 420090060000 PROJECT DESCRIPTION Demolish existing coal silos
OWNER STATE OF WASH;DEPT CORRECT WCC ADDRESS DEPT CORRECTNS;PROP UNIT PHONE 1.561.669.3838
CONTRACTOR ADDRESS PHONE
CONTRACTOR LICENSE LENDER
INSPECTION INSP DATE Comments INSPECTION INSP I DATE Comments
Connection has been verified by IDemolition Final Inspection