HomeMy WebLinkAboutBLD2023-00789 Cancelled Mechanical - BLD Inspections - 12/11/2024 c �
Mason County
Mason County - Division of Community Development
615 W.Alder St.
Building 8
�® Shelton, WA 98584 360-427-967070 ext 352
www.masoncountywa.gov
B DD2023-00789 MECHANICAL - RESIDENTIAL
PROJECT DESCRIPTION: INSTALLATION OF DUCTLESS HEAT PUMP ISSUED: 07/28/2023
SITE ADDRESS: 7993 E STATE ROUTE 106 UNION
EXPIRES: 01/24/2024
PARCEL: 322343400130
APPLICANT: MUNSON DAVID R OWNER: MUNSON DAVID R
P O BOX 266 P O BOX 266
WILKESON,WA 98396 WILKESON,WA 98396
CONTRACTOR: COMPTONS HOME SERVICES
2745 Martin Way E
Suite 2
OLYMPIA,WA 98506
GENERAL CONTRACTOR'S LICENSE: COMPTONS HOME SERVICES License: COMPTHS82562
2745 Martin Way E Expires: 01/22/2024
Suite 2
OLYMPIA,WA 98506
FEES: Paid Due
State Fee-Residential $6.50 $0.00
Final Inspection $80.00 $0.00
Technology Flat Convenience $5.00 $0.00
Fee
Mechanical Base Fee $30.00 $0.00
Mechanical Fees $19.00 $0.00
Totals : $140.50 $0.00
FIXTURES
Qt C Mechanical Fixtures
1.0000 Ductless Heat Pump
Printed by:Annie Wilson on:07/28/2023 04:46 PM
Page 1 of 3
,
Mason County
Mason County - Division of Community Development
615 W.Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
MECHANICAL - RESIDENTIAL BLD2023-00789
REQUIRED INSPECTIONS
Mechanical/Plumbing Final Inspection
CONDITIONS
* OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit
revocation.Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or
contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained
permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The
owner or authorized agent represents that the information provided is accurate and grants employees of Mason County
access to the above described property and structure(s)for review and inspection. This permit/application becomes null &
void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of
180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT
APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION.
* The demolition and disposal of debris must meet the regulations of Mason County and Olympic Region Clean Air Agency
(ORCAA).
It is unlawful for any person to cause or allow the demolition (or major renovation)of any structure unless all asbestos
containing materials have been identified and removed from the area to be demolished. Work shall not commence on an
asbestos project or demolition project unless the owner or operator has obtained written approval from ORCCA.2490 B
Limited Lane NW, Olympia WA 98502,360.586.1044/800.422.5623 www.orcaa.org
* Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982.The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
* CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND THE ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All
construction must be in conformance with the international codes as amended and adopted by Mason County. Any
corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting
additional inspections.
* All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building
Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration.
Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No
more than one extension may be granted.
* All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration.The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
* By definition, propane tanks and heatpumps are structures,which must meet setback conditions. Please check your
"Approved Site Plan"to ensure these structures meet the setback conditions listed.
* All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted
classification. Any non-approved change of use or occupancy would result in permit revocation.
* Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance
with Mason County Title 14.28 and 14.17.
Printed by:Annie Wilson on:07/28/2023 04:46 PM
Page 2 of 3
,
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
MECHANICAL - RESIDENTIAL BLD2023-00789
* The exterior unit must be elevated above the Base Flood Elevation of 14 feet. See a Washington State Surveyor to
identify this height.
To perform an inspection the Mason County Building Inspector will need to access the interior of the structure. An
electrical permit completed and approved by Washington State Labor& Industries must be available on-site during the
inspection.
The Mason County Building Inspector will inspect the following: Verify that the system is installed in accordance with
manufacturer specifications;The inspector will check to make sure that the exterior unit is permanently installed and
supported, the exterior unit complies with required setbacks to property lines, fuel tanks are located at least 10-ft from the
system, a source of ignition,all exterior penetrations are properly sealed,condensate lines are installed and are properly
supported, including proper material, slope, and that the condensate line terminates to a proper location outside of the
foundation, copper refrigerant lines are insulated with '/2"thick continuous closed-cell foam insulation or better, indoor units
are located at least 3-ft from smoke and carbon monoxide alarms,and that modifications made to the structure,to install the
unit, does not affect existing structural members.
All other necessary permits from Mason County, Washington State and/or Federal Agencies that are required for this
proposed development and construction must be obtained PRIOR TO SAME DEVELOPMENT AND CONSTRUCTION.
" Compliance is required for protection of utility systems. Flood proofing can be achieved using several measures including
elevation, relocation, component protection, or other measures that provide partial protection. Different approaches can be
used to improve flood damage resistance. This is key in areas of repetitive, low-level flooding. The principles of these
measures apply with two key methods: elevation and component protection and can be accomplished at elevations higher
than the elevation required greater than the Base flood elevation or two feet above the highest adjacent grade. See flood
survey performed prior to the clearing, grading or excavation for elevations.
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of any other state/local law regulating construction or the performance of construction.
Issued By: Ana'?, � �
Contractor or Authorized Agent: X.YY l a(C,Q Date:
Printed by:Annie Wilson on:07/28/2023 04:46 PM
Page 3 of 3
INSPECTION CARD
Mason County
615 W. Alder St.
Building 8, Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
PERMIT# BLD2023-00789 PROJECT ADDRESS 7993 E STATE ROUTE 106 UNION, WA 98592
PARCEL# 322343400130 PROJECT DESCRIPTION installation of ductless heat pump
OWNER MUNSON DAVID R ADDRESS P O BOX 266 PHONE
CONTRACTOR COMPTONS HOME SERVICES ADDRESS 2745 Martin Way E Suite 2 PHONE
CONTRACTOR LICENSE COMPTHS825132 LENDER
INSPECTION INSP DATE Comments INSPECTION INSP I DATE Comments
Mechanical/Plumbing Final
s
i
MASON COUNTY 360-427-9670 Shelton ext.352
352
414�011- COMMUNITY SERVICES 36 60-40-275 82-5269 Elma exit.352
Building, Planning,Environmental Health,Community Health
615 W.Alder St. Bldg.8 - Shelton,WA 98584 www.masoncountywa.gov
CORRECTION/INSPECTION REPORT
PERMIT/CASE NUMBER: 'a(,p.2U21 —Gb 79q
ADDRESS/LOCATION: 7°l9 3 E - t 0& LNu a,,
FINDINGS: No L IM S gK 6 Ffr �L�.kL� �, P>b>b o P
L it s S 41 t L.r to Awe :ail-Col
Add A1trrK3- 6,tao -cx4-
�4/cat r,JC.r S ® AIASanj n!W W a . 6 d J/
Items listed above must be corrected to zain compliance.
❑ THIS IS NOT A COMPLETE INSPECTION
❑ This structure has been inspected by Mason County Building Department and the items listed
above are in VIOLATION of Mason County laws and/or ordinances.
❑ Call for re-inspection when corrections are made before proceeding with any further work.
❑ Make corrections, items will be checked on the next inspection.
® OK to Se y► Rk Jj
Date: 8�/0 /Z 3 ❑ Please contact our office regarding possible
Department: Bl 1) structural damage incurred by recent
Inspector: ;ram "natural/man made"disasters.This is NOT a
CORRECTION NOTICE.
DO NOT REMOVE THIS TAG
MCC14.12
MASON COUNTY Mason County Permit Center Use:
{ - COMMUNITY SERVICES FI,D � � _
3uiiding,Planning,Environmental Health,Community Heath
R 615 W.Alder Street--Bldg.8,Shelton,Wig 98584 Date Revd
Phone:(360)427-9670 Bxt.352♦Pax:(360)427-7798
Fee: $300.00
No fee if w/other permits
FDPO Development Permit Application
�plicant: �; Contractor.
4
Mailing Address: Mailing Address:
ZC-),s ?. q - Rk�i i car
City, State. Zip City, State Zip
Phone
Email: Q& -k Email:
Parcel Number: Property Address:
I understand I am making application for a permit to develop in a designated flood hazard area. The
undersigned agrees that all such work shall be done in accordance with the requirements of the County Flood
Damage Prevention Ordinance, building codes and all other applicable Local, State and Federal regulations.
Thus application does not create liability on the part of the Counter or any officer or employee thereof for any
flood damage that results from reliance on this application or any administrative decision made lawfully
thereunder. f
Applicants Signature: pate: ._
Official Use:
A. Description of Work (complete for ail yv rkj:
1. Proposed Development Description:
❑ New building/Addition ❑ Manufactured home ❑ Fill/grade ❑ Other:
❑ Commercial (see section D)
❑ Remodel/repair to existing building (see section C)
2. The parcel has been identified in the following Flood Hazard Area:
❑ A E. AE ❑ AO ❑ VE
3. Are any other Federal, State or local permits required? Must attach copies of permits.
❑ Yes ❑ No if yes, list type:
4. Is the proposed development in an identified floodway?
,-]Yes ❑ No
5. if yes to#4, a No Rise Certification must be attached.
❑ Yes ❑ No
� w~
B. :
1, AFEMA Elevation Certificate is required, must be completed by a Washington State licensed Surveyor.
Elevation Certificate must be attached.
Z Base Flood Elevation at the building site: feet NAVO 88
3. Required lowest floor elevation (including basement flooh: fe8tNAVD83
4� In flood hazard areas without 8 base flood elevation (BFE), what is the highest adjacent
Grade? (HAG)
Structure must bea nnini[nunn of two (2) feet above the HAG.
The required finish floor height |s
C. Complete for Alterations, Additions, or Improvements to Existing Structures:
******(See attached Substantial Improvement & Substantial Repair)
1. What is the estimated market value of the existing structure?
Attached:
Assessor's Parcel Detail Report OR
Appraisal from a Washington State Licensed Appraiser
2, What ia the cost/valuation of the proposed construction? Percentage_______
Attached.
Contractors Bid /FEK8ACrheha> OR
County Valuation per Mason County Ordinance
3. if the cost or valuation of the proposed construction equals or exceeds 50 percent of the market value
of the structure, then the substantial improvement/re pair provisions shall apply.
Is the proposed work a substantial repair/improvement O Yes O No
D. :
1. Type o[MOodproofing method:
2. The required f|oOdpFPVfing elevation is: f8etN/\VO88
'
3. F|oodproofing certification bya registered engineer iaattached:
OYem ONu
E. Complete for Subdivisions and Planned Unit Developments:
1. Will the subdivision o[ other development contain SO lots 0r5acres?
El Yes ONo
2. |f yes, does the plat o[ proposal clearly identify base flood elevations?
El Yes El No
3' Are the 100}~ea[ Fiuodp|ain and F|0odvvay delineated on the site plan?
OYes 0No
a
�
Administra#ive,.,-- - ,
r
1. Approved: X Denied:
Planning Staff Signature: Date:
Building Staff Signature: ' Date:��o�7� 3
F
3. As-built lowest floor elevation: feet NAVD88
1
Comments/Conditions:
i
V'Y
V � �oo�
�.. ,...
Mason County Flood Damage Prevention Ordinance #41-17 & International Building Codes