HomeMy WebLinkAboutBLD2021-01012 Cancelled Foundation - BLD Inspections - 12/11/2024 - 1
MASON COUNTY 615 W.Alder St.Bldg 8,SHELTON,WA 98584
COMMUNITY SERVICES SHELTON: 360-427-9670, EXT 352
BELFAIR: 360-275-4467,EXT 352
Buildinq Plenninq Environmental lIe Ith,Comrnunity l Ic Ith ELMA: 360-482-5269,EXT 352
www.co.mason.wa.us
INSPECTION CARD AND CERTIFICATE OF OCCUPANCY**
To schedule an inspection call or visit http://www.co.mason.wa.us/community-services/bid-inspectiop.php
Permit Number BLD2021-01012 Date Issued 12/03/2021 Issue
Project FOUNDATION UNDERPINNING OF RESIDENCE
Site Address 18931 E State Route 106
Applicant MUYSKENS LACEY&BRADLEY
Contractor R&R FOUNDATION SPECIALIST LLC
Contractor Phone 1.425.760.5077
Primary Code UPC IBC, IRC,IFC,IEC,IMC,& Type
Permit Type REPAIR-RESIDENTIAL Occupancy
-APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS.
-DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED.
-THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION, FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY.
-ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION.
-OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION.
**THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED.—
PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET
Public Works Access/Driveway Other
Health Septic Well
Deptartment
Planning Site Inspection
Department
Fire Marshall Fire Apparatus Access Fire Sprinkler
Auto Fire Alarm Hood and Duct
Other Final
Building
Department Building Official: Community Services Designee
Concrete Setbacks Slab
Footing Perimeter Point load Footing
Footing Interior Footing Decks/Porches
Foundation Stem Walls Other
Rough-In Groundwork Plumbing Framing
Groundwork Mechanical Plumbing
Groundwork Gas Pipe Mechanical
Gas Piping Shear Wall Nailing
Underfloor
Other
Insulation Slab Ceiling
Floor Vaulted Ceiling
Walls Vapor Barrier
Other
Wallboard Interior Wall Brace Panels Fire Walls
Nailing
Other
Final Building
Manufactured Setbacks Setup
Home
Concrete Foot/Runners Final
Other
U��•c ( !?--Lc6 -l( 1 ,AJ- 5,�L_ -t-�
'Vo arc.; �l-(-23 /
S�/�Kt l,W t 'f'ln (� L-} ✓�S tt.`(1 N c!o� 0 a FHA I I'14,Gcc-,4d—t
a,.r� S?eCte ( fHs e su ✓Y(�w5 , �H ( lNgFce-Hr- (,j t Lx '5;_,' Ica( O�I.L
S
AAcy o6�At�5 rcpev�s ��
c C>o,A 41- -•Is✓
MASON COUNTY 360-427-9670 Shelton ext.352
360-275-4467 Belfair ext.352
COMMUNITY SERVICES 360-482-5269 Elma ext.352
Building, Planning,Environmental Health,Community Health
615 W.Alder St. Bldg.8 - Shelton,WA 98584 www.co.mason.wa.us
CORRECTION/INSPECTION REPORT
PERMIT/CASE NUMBER'�)1j Zoe. - d D I Z
ADDRESS/LOCATION: ja 3 I �� ` O
FINDINGS:
1
� r
i %+eA-i a a.+-4!- 2 o-,4le ( 114 /+/c
Items listed above must be corrected to gain compliance.
❑ THIS IS NOT A COMPLETE INSPECTION
❑ This structure has been inspected by Mason County Building Department and the items listed
above are in VIOLATION of Mason County laws and/or ordinances.
;?tall for re-inspection when corrections are made before proceeding with any further work.
❑ Make corrections, items will be checked on the next inspection.
❑ OK to
Date: \2- Please contact our office regarding possible
Department: structural damage incurred by recent
natural/man made" disasters.This is NOT a
Inspector: CORRECTION NOTICE.
DO NOT REMOVE THIS TAG
MCC 14.12
r y
a
MASON COUNTY '
COMMUNMY SERVICU
BLD2021-01012 Muyskens Foundation Repair 18931 E.Ste Rte 106,Belfair,WA,98528/12206-31-00060
Permit Number Project Title Project Address/Parcel Number
Applicants of projects requiring Special Inspection or Testing per Chapter 1704 &1705 of the International
Building Code, as amended by Washington State. Please acknowledge and return this form to the Mason
County Permit Center.
THESE INSPECTIONS ARE NOT PERFORMED BY THE BUILDING DEPARTMENT AND MUST BE
PERFORMED BY QUALIFIED SPECIAL INSPECTORS, HIRED BY THE OWNER AND APPROVED
BY THE COUNTY PERMIT CENTER. Individuals certified in a special inspection category by
Washington Association of Building officials(WABO)or individuals employed by a recognized testing
laboratory and under the direct supervision of a Registered Professional Engineer are typically
considered qualified at the discretion of the local jurisdiction having authority for enforcement.
BEFORE A PERMIT CAN BE ISSUED: The Owner or his/her representative, on the advice of the
responsible Project Engineer or Architect, shall fill out completely, sign and submit two (2) copies of the
attached"Structural Tests and Inspection Schedule"to this Department for review and approval including
any requirements related to the Mason County Municipal Code.
The Owner, General Contractor, and Inspection/Testing Agency, where applicable, shall also
acknowledge the following conditions applicable to Special Inspection and/or Testing.
1. Inspection/Testing Agency shall submit names and qualifications of on-site Special Inspectors'
to the Building Inspection Permit Center for approval PRIOR TO PERMIT/S BEING ISSUED.
2. All Special Inspections shall be noted on the approved plans or attached approved
documents.
3. All special inspections shall be approved by the County or as recommended by the Engineer
of Record (EOR).
4. It is the responsibility of the General Contractor to review County approved plans for additional
inspection or testing requirements that may be noted or required per IBC as noted on
approved plans.
5. The General Contractor is responsible for proper notification to the Inspection/Testing
Agency for items listed on this form.
6. Special Inspectors shall provide detailed reports on company letterhead to the Building
Inspector of all required inspection activities. These may also be provided when the inspector
visits the jobsite for the scheduled inspection but must be completed before the subject of
inspection is approved by the building inspector.
7. Copies of all ongoing laboratory and testing reports shall be sent directly to the Building
Inspector by the Inspection/Testing Agency or other responsible party within a reasonable
time to test results.
8. BEFORE A CERTIFICATE OF OCCUPANCY APPROVAL CAN BE ISSUED: The
nspection/Testing Agency shall submit a FINAL REPORT LETTER stating that all items
requiring testing and inspection have been fulfilled and reported and a final inspection report
shall be provided. A copy of the statement is to be maintained at the jobsite for the Building
Inspectors review prior to final inspections.
Page 1 of 4
P`'""w�, Mason County
' Mason County - Division of Community Development
615 W. Alder St. Bldg.8
Shelton, WA 98584
�Q 360-427-9670 ext 352
www.co.mason.wa.us
U . v�
B DD2021-01012 REPAIR - RESIDENTIAL
PROJECT DESCRIPTION: FOUNDATION UNDERPINNING OF ISSUED: 12/03/2021
RESIDENCE
SITE ADDRESS: 18931 E STATE ROUTE 106 BELFAIR EXPIRES: 06/01/2022
PARCEL: 122063100060
APPLICANT: MUYSKENS LACEY&BRADLEY OWNER: MUYSKENS LACEY& BRADLEY
18931 E STATE ROUTE 106 18931 E STATE ROUTE 106
BELFAIR,WA 98528 BELFAIR, WA98528
1.360.320.1926
GENERAL CONTRACTOR'S LICENSE: R&R FOUNDATION SPECIALIST LLC License: RRFOUFS829DA
P 0 BOX 626 Expires: 03/01/2022
MONROE, WA98272
1.425.760.5077
VALUATIONS: FEES: Paid Due
Project Valuation (BID, 6000.00 $6,000.00 Technology Surcharge $4.72 $0.00
ESTIMATION..) Building Permit Fee $156.00 $0.00
State Fee-Residential $6.50 $0.00
Plan Check Fee $80.00 $0.00
Total: $6,000.00 Totals : $247.22 $0.00
REQUIRED INSPECTIONS
3rd Party Inspection Report BLD-Final Inspection
CONDITIONS
All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building
Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration.
Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No
more than one extension may be granted.
Printed by:Kate Campbell on:12/03/2021 10:32 AM Page 1 of 4
Mason County
Mason County - Division of Community Development
615 W. Alder St. Bldg.8
Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
REPAIR - RESIDENTIAL BLD2O21-01012
* The plan review check list and corrections are part of the approved plans and must remain attached. It is the responsibility
of the applicant, owner or contractor to make the required corrections indicated on the plans. Once the plans are marked
"APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is
responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or
removal of approved documents will result in failure of required building inspections.
* All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted
classification. Any non-approved change of use or occupancy would result in permit revocation.
* OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit
revocation.Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or
contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained
permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The
owner or authorized agent represents that the information provided is accurate and grants employees of Mason County
access to the above described property and structure(s)for review and inspection. This permit/application becomes null &
void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of
180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT
APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION.
* All changes to "approved" building plans that effect compliance with the international codes as amended and adopted, or
any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
* Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the
structure.
* Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
* The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the
approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule,
minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being
performed or approvals granted.
* Concrete encased grounding electrodes must be installed and used at each new building or structure that is built upon a
permanent concrete foundation. In Mason County the electrical code is regulated by Washington State Department of Labor
& Industries (L&I).
For more information contact L&I for additional information. In Olympia call (360)902-6350 and in Bremerton call (360)415-
4000.
* All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor
increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way.
* Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site
plan. Please check your"Approved Site Plan"to ensure these structures are shown and meet the setback conditions listed.
* All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and
plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee
schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections
being performed or approvals granted.
* Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly
corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of
pressure treated material.
Printed by:Kate Campbell on:12/03/2021 10:32 AM Page 2 of 4
I �
Mason County
Mason County - Division of Community Development
615 W.Alder St. Bldg.8
Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
REPAIR - RESIDENTIAL BLD2021-01012
* CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND THE ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All
construction must be in conformance with the international codes as amended and adopted by Mason County. Any
corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting
additional inspections.
* Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance
with Mason County Title 14.28 and 14.17.
* All property lines shall be clearly identified at the time of foundation inspection.
* All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
* All other necessary permits from Mason County, Washington State and/or Federal Agencies that are required for this
proposed development and construction must be obtained PRIOR TO SAME DEVELOPMENT AND CONSTRUCTION.
* Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to
the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of
the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In
addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the
Building Department prior to any further inspections being performed or approvals granted.
* Epoxy grout required and specified on the approved building plans shall require a special inspection. The special
inspector shall be the engineer of record or their authorized representative, a WABO Certified special inspector, or certified
testing laboratory. In addition a Mason County Building Inspector may perform the inspection provided holes are prepared in
accordance to manufacturer specifications that are available on-site during inspection.
Special inspectors shall inspect the installation of grouted construction anchors as stated in the manufacturers specifications.
An inspection report shall be prepared and submitted to the Mason County Building Department prior to the framing
inspection of the project.
* The approval of this project is subject to the recommendations and specifications outlined in the attached geotechnical
report or assessment.All applicable recommendations and specifications shall be applied to the development on this site.
Any deviation requires stamped written approval from the registered design professional responsible for the
report/assessment, and may require special inspection by same. Structures and/or land modifications(grading, cuts, fills,
etc.) required in the geotechnical report/assessment, may require a separate permit. The geotechnical report/assessment
shall remain attached to the approved building plans.
* Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather,
garage floor slabs and other vertical concrete work exposed to the weather shall have a minimum compressive strength of
3000 psi (IRC Table R402.2).
* In addition to the inspections required in IBC, Section 110, the owner, the engineer or architect of record acting as the
owner's agent shall employ one or more special inspectors who shall provide inspections during construction on the types of
work listed under Chapter 17 and as specified by the design professional. The special inspectors duties& responsibilities
shall be as specified in Chapter 17.
Special inspection reports shall be submitted to the Mason County Building Department, 615 W Alder St, Shelton WA 98584
and available for inspection. Inspection reports shall be completed and submitted to the dept. in a timely manner and shall
be submitted prior to the framing and final occupancy inspections.
Printed by:Kate Campbell on:12/03/2021 10:32 AM Page 3 of 4
G P`'"ti Mason County
Mason County - Division of Community Development
615 W. Alder St. Bldg.8
Shelton,WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
REPAIR - RESIDENTIAL BLD2021-01012
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provi on
any o state/ cal 1 ulating construction or the performance of construction.
Issued By:
Contractor or Authorized Age n . Date: "—)3 Z
Printed by:Kate Campbell on:12/03/2021 10:32 AM Page 4 of 4
f
s
MASONCOUNly
cohimuN rY smvicrs
ACKNOWLEDGEMENTS
Prior to issuance of a building permit, the Owner, on the advice of the Project Engineer or Architect, shall
complete,sign,and submit this form to the County Permit Center.
Declaration of Owner
I,as the owner of the project,declare that the testing agency firm/s or individual/s listed herein are hired by me to
perform"Special Inspections" and/or"Structural Testing" in accordance with the provisions of the International
Building code(IBC)Chapter 17.
Lacey Muyskens Z-a� 07/02/2021
Owner(print) Own (Sign re) (date)
Declaration of Registered Professional Architect/Engineer
I, as the design professional in responsible charge of the project listed herein, declare that the special
inspection listed herein are required for this project in accordance with the provisions of the International
Building Code(IBC)Chapter 17.
MANS THURFJELL
Architect/Engineer(print) Of WA
Architect/Engineer Stamp/Signature(date)
NAI
Ave 4/L- 07-02-21
Krazan &Associates
Testing Agency Name/Contact 425-485-5519
info:
The Special Inspection/Testing Agency listed above must have a current Portfolio of Qualifications
on file with the County prior to performing work.
Declaration of the General Contractor
I, as the General Contractor of the project, agree to comply with the"Contractor Responsibility"items
noted herein. �7
Amber Miller , M.,4" 1L&4, 07/02/2021
General Contractor(print) General Contractor Signature (date)
Page 2 of 4
f
MASON COUNTY
COMMUNITY SERVICES
Required Special Inspections
International Building Code; Chapter 17:
A completed and signed copy of pages 1 through 4 of this form shall be submitted to the
"Permit Center" prior to building permit approval.
Engineer shall check the applicable items:
❑ Special inspection of fabricated items 1704.2.5
❑ Submittals to the building official 1704.5
❑ Structures over 75' in height located in Seismic Design Category D, 1704.6.1
❑ Structures classified as Risk Category III or IV located in Seismic Design Category D, 1704.6.1
❑ Steel construction&structural Steel 1705.2.1
❑ Cold form steel deck 1705.2.2
❑ Open-web steel joists &girders 1705.2.3
❑ Cold form steel trusses spanning 60 feet or greater 1705.2.4
❑ Concrete construction 1705.3 &Table 1705.3
❑ Shotcrete 1705.3
❑Welding of reinforcing bars 1705.3.1
❑Material Tests 1705.3.2
❑Masonry Construction 1705.4
❑ Empirically designed masonry, glass unit&masonry in Risk Category IV 1705.4.1
❑ Vertical masonry foundation elements 1705.4.2
❑ Wood construction 1705.5
❑ High Load Diaphragms 1705.5.1
❑ Metal-plate connected wood trusses spanning 60 feet or greater 1705.5.2
❑ Soils 1705.6 &Table 1705.6
X Driven deep foundations 1705.7&Table 1705.7
❑ Cast in-place deep foundations 1705.8& Table 1705.8
X Helical pile foundations 1705.9
❑ Fabricated items 1705.10
Page 3 of 4
MASON COUNTY
COMMUNil y smvius
❑ Special inspections for wind resistance 1705.11
❑ Structural wood 1705.11.1
❑ Wind resisting components 1705.11.3
❑ Cold formed steel light frame 1705.11.2
❑ Special inspection for seismic resistance 1705.12
❑ Special inspection for structural steel per 1705.12.1
❑ Seismic force-resisting systems 1705.12.1.1
❑ Structural steel elements 1705.12.1.2
❑ Special inspection for structural wood per 1705.12.2
❑ Special inspection for cold-formed steel per 1705.12.3
❑Designated seismic systems 1705.12.4
❑Architectural components 1705.12.5
❑Plumbing,mechanical&electrical components 1705.12.6
❑ Storage racks 1705.12.7
❑ Seismic isolation systems 1705.12.8
❑ Cold-formed steel special bolted moment frames 1705.12.9
❑ Testing for seismic resistance 1705.13
❑ Structural steel 1705.13.1
❑ Seismic fore-resisting systems 1705.13.1.1
❑ Structural steel elements 1705.13.1.2
❑ Nonstructural components 1705.13.2
❑ Designated seismic systems 1705.13.3
❑ Seismic isolation systems 1705.13.4
❑ Sprayed fire-resistance materials 1705.14
❑ Physical and visual tests 1705.14.1
❑ Structural member surface conditions 1705.14.2 (1705.14.3 through 1705.14.6.3)
❑ Mastic&intumescent fire-resistance costings 1705.15
❑Exterior insulation&finish systems (EIFS) 1705.16
❑ Fire-resistance penetrations and joints 1705.17
❑ Penetration firestops 1705.17.1
❑ Fire-resistant joint systems 1705.17.2
❑ Testing for smoke control 1705.18
❑ Testing Scope 1705.18.1
Page 4 of 4