Loading...
HomeMy WebLinkAboutBLD9433 Mobile Home - BLD Permit / Conditions - 2/17/1978 Day, Rick #9433 2-17-78 NW 32-21-3 Mobile Home 00020 BUILDING PERMIT APPLICATION MASON COUNTY P.O. Box 186 Shelton, Washington 98584 DATE ISSUED - 717of PERMIT NO. OWNER NAME MAIL ADDR SS CITY&STATE ZIP PHONE R, q� DIRECTIONS - C13p TO JOB SITE LEGAL (❑SEE ATTACHED SHEET) DESCR. SecflO�'L rDvv Z an CONTRACTOR1ME MAIL ADDRESS CITY&STATE V LICENSE NO. PHONE USE OF BUILDING Class of work: ❑ NEW ❑ ADDITION ❑ ALTERATION ❑ REPAIR ❑ MOVE ❑ REMOVE Describe work: Valuation of work: $ 7 PLAN CHECK FEE PERMIT FEE SPECIAL CONDITIONS: APPLICATION ACCEPTED BY PLANS CHECK BY JAP, ROVED FOR ISSUANCE Type of Occupancy Division Const. /q 7 3 Group 7 Size of Bldg. No. of Max. (Total) Sq. Ft./2 X G Q Stories Occ. Load CONTRACTOR AFFIDAVIT PERMANENT SEASONAL E.D.NUMBER I certify that I am a currently registered contractor in RESIDENCE the State of Washington and I am aware of the MOBILE HOME ordinance requirements regulating the work for which the permit is issued and all work done will be in Special Approvals Required Received Not Required conformance therewith. ZONING HEALTH DEPT. Firm PUBLIC WORKS By ROAD DEPT. Lic. No. Date OWNERS AFFIDAVIT I certify that I am exempt from the requirements of the N O T I C E contract or registration law RCW 18.27, and am aware of the Mason County ordinance requirements for SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING, VENTILATING OR AIR CONDITIONING. which this permit is issued and that all work done will be In conformance therewith. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 120 DAYS, OR IF CONSTRUCTION OR WORK IS + + SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER Owner Date. WORK IS COMMENCED. PLAN CHECK VALIDATION CK. M.O. CASH PERMIT VALIDATION CK. M.O. SH