HomeMy WebLinkAboutBLD9433 Mobile Home - BLD Permit / Conditions - 2/17/1978 Day, Rick #9433
2-17-78
NW 32-21-3
Mobile Home
00020
BUILDING PERMIT APPLICATION
MASON COUNTY
P.O. Box 186 Shelton, Washington 98584
DATE ISSUED - 717of
PERMIT NO.
OWNER NAME MAIL ADDR SS CITY&STATE ZIP PHONE
R, q�
DIRECTIONS - C13p
TO JOB SITE
LEGAL (❑SEE ATTACHED SHEET)
DESCR. SecflO�'L rDvv Z an
CONTRACTOR1ME MAIL ADDRESS CITY&STATE V LICENSE NO. PHONE
USE OF
BUILDING
Class of work: ❑ NEW ❑ ADDITION ❑ ALTERATION ❑ REPAIR ❑ MOVE ❑ REMOVE
Describe work:
Valuation of work: $ 7 PLAN CHECK FEE PERMIT FEE
SPECIAL CONDITIONS:
APPLICATION ACCEPTED BY PLANS CHECK BY JAP, ROVED FOR ISSUANCE Type of Occupancy Division
Const. /q 7
3 Group
7
Size of Bldg. No. of Max.
(Total) Sq. Ft./2 X G Q Stories Occ. Load
CONTRACTOR AFFIDAVIT
PERMANENT SEASONAL E.D.NUMBER
I certify that I am a currently registered contractor in RESIDENCE
the State of Washington and I am aware of the MOBILE HOME
ordinance requirements regulating the work for which
the permit is issued and all work done will be in Special Approvals Required Received Not Required
conformance therewith. ZONING
HEALTH DEPT.
Firm PUBLIC WORKS
By
ROAD DEPT.
Lic. No. Date
OWNERS AFFIDAVIT
I certify that I am exempt from the requirements of the N O T I C E
contract or registration law RCW 18.27, and am aware
of the Mason County ordinance requirements for SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING,
VENTILATING OR AIR CONDITIONING.
which this permit is issued and that all work done will
be In conformance therewith. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED
IS NOT COMMENCED WITHIN 120 DAYS, OR IF CONSTRUCTION OR WORK IS
+ + SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER
Owner Date. WORK IS COMMENCED.
PLAN CHECK VALIDATION CK. M.O. CASH PERMIT VALIDATION CK. M.O. SH