From: Betty Wing
To: Barbara Robinson; Charell Holcomb
Date: 7/30/2008 5:24 PM
Subject: Fwd: SR 3 Avery Township Gregg Paisley Renaissance Faire & Extreme Sports
Festival Applications: WS
Please print this out and plan to discuss with Mr. Paisley at the pre-application conferences.Thank you.
>>> "Hess,Alana" <HessA@wsdot.wa.gov> 7/30/2008 5:21 PM >>>
Dear Ms. Wing:
The Washington State Department of Transportation(WSDOT)has reviewed
the applications for the proposed Renaissance Faire&Extreme Sports
Festival events.These events are to be held on the property owned by
Gregg E. &Elisa K. Paisley located in the 4900 block of SR 3 mile post
7.75, left vicinity.The Renaissance Faire is scheduled for August 30
and 31, 2008 with an expected attendance of 5,000 to 10,000.The Extreme
Sports Event is scheduled for September 27, 2008 with an expected
attendance of 1,000 to 2,000.
WSDOT has serious safety and operational concerns with regards to the
impacts to SR 3 that will result from these events.The Renaissance
Faire is the most significant concern due to the expected attendance
levels and in that it will be held on Labor Day weekend. We are
requesting that the County require and condition the applicant and/or
property owner to provide WSDOT with Traffic Control Plans for each of
these events.These plans must be prepared by a licensed professional in
accordance with WSDOT's requirements. In the case of the Renaissance
Faire the plans are due to WSDOT for review no later than August 15,
2008.The due date for plan submittal for the Extreme Sports event will
be September 12, 2008. All submittals should be sent to my attention.
WSDOT will notify the State Patrol of these events.The County should
expect contact by the State Patrol directly or through WSDOT and they
may have requirements in addition to WSDOT's.
We respectfully request that the County not issue the permits for either
one of these events until the Traffic Controls Plans have been approved
by WSDOT.
Thank you for this opportunity for review and comment. Please contact me
at your convenience should you have questions or require additional
information.
Sincerely,
Alana Hess
Development Review Engineer
Olympic Region Development Services
Washington State Dept of Transportation
5720 Capitol Blvd
P.O. Box 47440
Olympia,Washington 98504-7440
(360)357-2725
(360) 357-2748 FAX
hessa aewsdot.wa.gov
(9/11/2008) Mark Core- Fwd: Avery Township - Corrected and Revised TCP's Page 1
From: Betty Wing
To: Barbara Adkins; Mark Core; Pam Bennett-Cumming
Date: 9/11/2008 10:18 AM
Subject: Fwd: Avery Township - Corrected and Revised TCP's
Attachments: Primary Traffic Control Plan.xls; Twin-Access Traffic Control Plan.xls
I wanted you to see several a-mails I have received from Mr. Paisley. I told him that his biggest hurdle was working with
State DOT to resolve his access issue. I wanted to make sure you were in the loop on this.
Y P
>>> "Gregg Paisley" <greggaaisleYOgmail.com> 9/11/2008 8:15 AM >>>
Just an FYI so you know we are moving fast on this.
----------Forwarded message----------
From: John Heinley <icheinlevCaljameckengineering.com>
Date: Thu,Sep 11, 2008 at 12:23 AM
Subject: Avery Township-Corrected and Revised TCP's
To: Dale Severson <seversdCcbwsdot.wa.gov>
Cc: Alana Hess <hessaOwsdot.wa.gov>,Gregg Paisley <gregooaislevCalamail.com>
Dale,attached is the corrected TCP in regards to WSDOT comments, and an
alternative TCP for two access points. The second access point is
approximately 500 feet NE of the existing access,slightly beyond the crest
of a vertical curve.
I think the twin-access strategy will work better. Note that I've reduced
the stoppage time to a maximum of 3 minutes-and I don't think that traffic
will need to be stopped for even that amount of time. The flaggers are
mostly there for safety. Flagger D, in the middle,alerts approaching
drivers if someone turning left is waiting for traffic to clear(that's why
they're at the crest of the vertical curve). Flagger C can stop traffic
during peak egress. Flagger B can stop traffic if a large left-turn queue
builds up. I would anticipate the average stoppage time to be no more than
1 minute,even less-similar to a signal.
If the Do Not Enter, by itself, is not sufficient for WSDOT then a Wrong Way
sign can be added. However,the MUTCD doesn't require a Wrong Way sign.
Thanks for taking a look at this. I'll be pretty busy at work tomorrow
during the day, but if you have questions and want to leave a voice-mail if
I can't answer my cell, please feel free. I'll get back to you as quickly
as I can.
John C. Heinley, P.E.
JAMeCK Engineering
(360) 790-9730
(9/19/2008) Mark Core- Re: Gregg Paisley's email to Betty Wing re marked up DOT traffic plan Page 2
Gregg
On Fri, Sep 12, 2008 at 9:33 AM, Pam Bennett-Cumming
<PamBC co.mason.wa.us>wrote:
> Good morning,
> Betty, thanks for forwarding me your email from Gregg Paisley(dated Sept
> 11, 2008) with its attached marked up traffic plan. We are aware of this
>document because we received it directly from DOT together with a letter on
> September 2, 2008. A copy was also provided to Mr Paisley. DOT's concerns
> (both from their letter, and County conversations with the agency)-were
>conveyed to the Board in the September 2, 2008 briefing later that day. DOT
> had also indicated they would not approve any temporary event should the
> local government deny these events-because they wanted to work with the
> County on issues of traffic safety. In addition -as you are aware, Fire
> District 5 had very specific requirements for fire access, which they had
>already conveyed to Mr Paisley directly.
> My point is-this is not new information, the Board has already taken it
> into account. At the Board's public meeting on September 9, the Board made
> it clear that they took into account many different factors as they
> considered their decision. Traffic and emergency access safety were two
>aspects. Among other factors, they also indicated they considered
> appropriateness of the activities considering the Rural Tourist Zoning, the
> need, after considering the applications during review-to undergo review
> Chapter 197-11 WAC, and the strong concern that there were still no
> permanent facilities at the site. In fact they stated that Mr Paisley's
> next priority should be to get these in place so other activities might be
>able to be reviewed under applicable Mason County regulations in the future,
>when supported by the appropriate infrastructure.
> It seems to be very important that we work together to convey the Board's
>decision -and their words to Mr. Paisley on what should be his next steps:
>developing the site as he proposed. I am confident that he wants to take
>those next steps. He has just now turned in a completely revised SEPA for
> his proposed Rural Tourist Campground development, which is currently under
> review. He has also just turned in a Forest Practices Application. The
> Forest Practices Planner will be working closely with me so we can do
>concurrent review. He also indicated to staff in a recent e-mail that he
>wants to re-activate the four building permits he took out early last year
> (which were canceled due to non-activity).
> I also hope that Mr Paisley passes this email on to Mr. Trummert so he has
>the accurate information on the status of Mr. Paisley's project. If I can
>find an email for him, I will forward it myself. Pam B-C
> Pam Bennett-Cumming, M.E.S
> Senior Planner-Water Resource Planning
> Mason County Department of Community Development
>411 North 5th
> PO Box 279
> Shelton, WA 98584
> phone: (360)427-9670 x287
R15/2008) Mark Core - Fwd: WSDOT "Approved as Noted"traffic control plan Page 1
From: Betty Wing
To: Barbara Adkins; Mark Core; Monty Cobb; Pam Bennett-Cumming
Date: 9/12/2008 8:53 AM
Subject: Fwd: WSDOT "Approved as Noted" traffic control plan
Attachments: WSDOT Approved as Noted 9-2-08.pdf
Here we go again...I think we may need to schedule a meeting with Mr. Paisley to discuss the specifics of our decisions. He
has sent me three e-mails in the last 24 hours and I expect more to come. Let me know what you think the next course of
action should be.
>>> "Gregg Paisley" <greggpaisley@gmail.com> 9/11/2008 9:32 PM >>>
Dear Ms. Wing,
Though it is possible the Commissioners were not made aware of this by
staff,this attachment verifies what I was trying to tell everyone: On Sept
2, WSDOT sent MC Planning, my engineer, and me an *"Approved as Noted" *Traffic
Control Plan. Note it is stamped "Approved as Noted"and signed by a WSDOT
traffic engineer.
i.e. We already had an approved WSDOT traffic control plan a week before the
Commissioners Sept 9 meeting and MC Planning knew it, or should have known
it. All that WSDOT was requiring was(by Sept 16th)for their notes be
incorporated into a clean copy. We did that two days ago and also submitted
additional plans to WSDOT for a possible second access. But it is a
documented fact that we had an Approved WSDOT plan in hand at the moment the
Commissioners denied our application, citing WSDOT as the primary reason.
If our plans, with the noted revisions, were acceptable to WSDOT, why would
they not be acceptable to Mason County?
Thank you,
Gregg Paisley
P.S. Here is the header for the email from WSDOT that included this
attachment.
------------------------------
*From:* Hess,Alana
*Sent:*Tuesday, September 02, 2008 10:59 AM
*To:* 'Pam Bennett-Cumming'
*Cc:* Severson, Dale; 'bjw@co.mason.wa.us'; Robert Fink
*Subject:* SR 3 Avery Township Traffic Impact Analysis&Traffic Control
Plan: WSDOT's Comments
*Importance:* High
Dear Ms. Bennett-Cumming:
Attached please find WSDOT's comments on the Traffic Impact Analysis(TIA)
and interim event Traffic Control Plan for the Avery Township
development. Thank
you.
Sincerely,
Alana Hess
Development Review Engineer
Olympic Region Development Services
Washington State Dept of Transportation
5720 Capitol Blvd
ZD w �oc �I� Su��AcE, gAW c2r- EVEN
Al
VST
(9/19/2008) Mark Core- Fwd: RE: SR 3 Avery Township Traffic Impact Analysis&Traffic Control Plan WSDOT's CommentRage 2
Hi All:
The Mason County Commissioners have denied the applications for the 9/08
Extreme Sports Festival and the 10/08 Renaissance and Fantasy Faire
events to be held the Avery Township/Gregg Paisley site (attached).
If you receive any inquiries concerning the County's actions from Gregg
Paisley or his consultant John Heinley I would recommend that you ask
them to contact the County Commissioners Office. The County has the lead
on this now- not us. I will be on vacation until Monday, 9/22 but the
developer and his consultant have everything they need right now from us
and due to the denials by the County any business they have with WSDOT
can wait until my return.
Thanks,
Alana Hess
Development Review Engineer
Olympic Region Development Services
Washington State Dept of Transportation
5720 Capitol Blvd
P.O. Box 47440
Olympia, Washington 98504-7440
(360) 357-2725
(360) 357-2748 FAX
hessaawsdot.wa.gov
Page 1 of 1
Aver Township:
outdoor went site ay ut for 2008
v
:.::::. :::.
i'AF
:::
{.....{.::.
........:.::::::}:::::::i;•k't.:•:.:.,:::.:.>.:; .... .. ......,�,L.R:. :::.}:+:ii:::.:.::::.::n;#R#gR{....;9{........ .•:;;>:.}}� �::.::......4}. .:}::::�v,� }:.:.'...' $::::`%:.. s(
...?�...............tk..;:bb•�.•.o...,y. . .�:. t+t•?:Sr:S:::.�: ...9X.::: ..?.4..: �::?f:;:;:`:iY:$':%::i::::::....:....:::. :»?f
{....::::..:::::::::::.::::..r .:?n:.n:. / n.•:}:.>:.;yc:RC$;%:�:�::.�:!?tL�, +:::::.:.: ;..:... ....'�#°,::$i$:;::�:cn5 ...b:::..:.;....;..::::.
::}i: vi:'i:.::4::.i}i::. .:.........n••:.y... .. Y.. .:"... }::V::.::•:::::}::r�. �:• :'i::$::it}:::}:•::::•.:$::..:•}}Rk4i}::•::$:.9Y. yy ::•%+'.
•:::: ':;::::: ..} ::.:r::.::•:R.. w:�. �• :/:?#5::$::-. :;$..4p� ::,ppM. .: .. @+.;. ...b..F;�,:+'.ii}iXi �}:Ybh;:•• •• /.}J...$. ..f,.
: .......... 1...•::.i.-.:.:::•:i::.iii'�,...... ;ir:.V..:?4 ....:x...]4:. .. ..:?,:h};'h:h.. ::} .. ..:::::}•......::.:}:: "i.f(.i:
....L�"\..h... .. ?h>::: ...:.. �q, ...`.^.5::•R+•}:•}::L3?}r+}n;;i}:.;.i:4>: "•:>•"•'}.,;:�X;'i;:::: ;i::L,{.::•.
....:....... .....4i?:::.}>i:..;.)f{;:.,}......?:4'?ti{q Rt. N.i•;h:. ... v. ..v .. .♦:T.I:[I {. .;.• •.?>.}....}:::.}: �. ::$o;
:::.{:::.Jbtvvt•:.H::. v.A.................b.••:.�:::d:::::::.....: ...Y.%{R.. .r.Y.•;.;.
jo
-::. '::.:.... .;, .:i.: •::. .......�.n .:4:44. ...:....... ...r..::... .•....:.,w:::.�.';hi::v} ....... }�......... •ii}}}:4}iii}}:i?:4}:4:•}:-}::.v:::::::: :i:+ :-`
..:. �: .... :::.'R {;:R5Q..; ....�. •. :•v.�:::$:.4........n.. .. ...�::. ..:•:::.�•::::;;..�%;::.R. :•:.+�.•:. ) .fi:�::•i:'•:• :,i.'#t:i..{3?�••.
::: .�}.�.,�. ...:.:. ....b:.:..b.. ».».n... ... ............. .4. ... ..... .............. .:. ::i'>}:•;ii:::,Pi•:.•if:;.::::::•. .}•{y�: '.'>:�..:'.,�.w,..,..., .,.n�,.,,{,..:
... .�i'::.i:.i ::.iii:}}:. xr..�.: : ..:�:•i}:4:• •}:' v.v:• .:::.: .......t.:::vi n� l•}ii}}ti:{.....:{4:.0::...�:..+ -.4 l}:.. .. ..:...::.w.......:.....n
':.. ..., ,..... .{.... ..�&��,....n... .� .. n...... ........::4i},F,.:.�:i:$'i:i:%4%:?•iii::hi}{::+..... ....,: .h/.v:.: .�n�:.-..�.pp :�ifi
. :::. :::::5 w:,�.. ..... �•.�::::.: .. : .}:".•:.. .�::ii}}i:"...$'•::.�:::•:::n4:v:::::n:v:, w:::RC. -.{.::n •:
.... ....... ........ ... .:.:r.)$ .. ....... ..r .. :tyy. ..:::::.�:::v:•: ....... ... {,;.i;.i}}}R-: -i;{.::Lii: .iiii: 4i;h}
:. ... �. � �{;� ^�L•. .:.;..';:.:, .gin:..
.....: .... .�p '::.:::: ...::::::::::::::::::::•4;.::..:::..`SQL}a LX. .:::::....::::''. {:....t. ::;
N.
:ii
•::
::.:::: .:::.}.49$F••} Sii:.: .i: •:%:::::;;::::�•..::;:. .s• .. •::?::}•.:::.......... �''2
q
.} :.:.::. ........... ::v, {•... ...:::: .... :is \\ ::: ':?OC::ii: ..
........ p
X4:4;•:4}}
30
i.
>: :+:: .'.<.. '8L xE.�t'':.•i•Lk:�::i:::}•;ii••;>• ::• •:. yt,. t'#:?�: :a::y,,•:E'• .
QL"
4
a
:.:.. ••.. .:: \ :;'ACT �5'4L•:�$:v''%��:''t%•,. �i.iA•?: l .
i
y
RL .
p
�ii::i i;ri"i::>r:%:4L£.;:, ....}iii is"•. .??:::..:.. W�, .i: ..::> .:
8 I
4;w p
;
....: •:� .,}:•. ...:... :::.::.... � :: {.;tii:'i '�'
.... ... ........$.t ....._. .. .....\...n. ....}. .:; .iii. �
i i,•% $:
....:
�.
O.
..:...:iii:••;;;.:;.:i:. ::,{.:i.. .. :. .!C {;::;ni..•'.'-';�';'-;-':;•�-'.•'.
A!
.;
L
:::::.........
4'... �' .'' ::, ,,. :;.i x{. ':,+ :,;.::;•;;•.: .... .: .. .;i'fti:�• < +T .:�;dr i4�ti;;i�i:::i.:
{
k
:. :.:. .:. ::::o. ,+* �:.�..`,r ...ia$.' •• r,,`s ;.ao.,r .:fir:::'
{ }
+ii' ':i4}''• �.•:•ti''•i},{: .i 4;4 •:;}i$#$%$ ;:;:,}}}:A.$i:.:: {}?R;9;:%':'t$::i$ X{ 30 S Y
yLL b}i iY
,x. 1
.. - :.....:...........:... gyp. ::'.. y,
....
� 4
t• i
........ ...... .:. .....':,:.:..... ;:...-,.:.;:•.:; .:• ''.. ....{S.. ..k%i'k`r%::;:';:isisit:r:'r.:i:;:;:?:i•. ;�:i:i#:i:ii;%;.-.q�
, ` X
�'.:i•. � - b;<, RA •. .,. .\,4 4 �P.'fi ...q. +P Ap�L 76IX -:
i%i;:i::•'; . ...r. "•:•�\�+•}Xi. i}`::::;.i'�c:{::.:. .>:::'.ia:: :�t;::::i::R:R18�%::i:BPF:: ::: i::::72;'.L:'%::.+na&.::i:• .. .. r.....
file://C:\Documents%20and%20Settings\CMH.ER704091\Local%20Settings\Temp\GWVi... 8/21/2008
Page 1 of 1
E
hare11 Holcomb + 4
.,. ���..,
Pu4 r.;3.S 1 �.::1'-4 r 3 ,,
file://C:\Documents%20and%20Settings\CMH.ER70409I Tocal%20 S ettings\Temp\GWVi... 8/21/2008
Ado
Washington State Olympic Region Headquarters
MAP Department of Transportation 5720 Capitol Boulevard,Tumwater
Douglas S. MacDonald P.O.Box 47440
Secretary of Transportation Olympia,WA 98504-7440
360-357.2600
Fax 360-357-2601
October 16,2006 M: 1-800-833-6388
www.wsdot.wo.gov
Mr. Allan Borden
Long Range Planner
Mason County
Department of Community Development
P.O.Box 279
Shelton,Washington 98584
RE: SR 3,Mile Post 8.0,Right Vicinity
Paisley Rezone&Campground Development
County File No.: 06-06
EC File No.: 2006-216-M
Dear Mr.Borden:
The Washington State Department of Transportation(WSDOT)has reviewed the Notice
of Application and supporting documents for the Paisley rezone and campground
development located at 4911 East State Route 3. It is our understanding that this
proposal is also currently being reviewed under a non-project action State Environmental
Policy Act(SEPA)Determination of NonSignificance.
The applicant does not have a permitted access to SR 3 for the site property. WSDOT
will require that the applicant apply for an Access Connection Permit. It also appears
that the applicant is proposing improvements to SR 3. Any improvements to SR 3 will
require review by WSDOT through the Developer Agreement process. Please have the
applicant contact me concerning these requirements.
Thank you for the opportunity to review and comment on this proposal. We respectfully
request that your office enter these comments into the SEPA and Planning Commission
Hearing records. Should you have questions or require additional information,please
contact me at your convenience.
(" AAeview Engineer
WSDOT,Olympic Region
AH:kl
cc: George Kovich, WSDOT
Larry Deemer,WSDOT
Brent Schiller,WSDOT
TrWashington State Olympic Region Headquarters
AIF Department of 'Transportation 5720 Capitol Boulevard,Tumwater
Douglas B.MacDonald P.O.Box 47440
Secretar/of Transportation Olympia,WA 98504-7440
360-357.2600
Fax 360-357-2601
TTY: 1-800-833-6388
www.wsdol.wa.gov
March 30, 2007
Mr. Gregg Paisley
4919 Lakeridge Drive East.
Lake Tapps, WA 98391
RE: SR 3,Mile Post-7.78,Left Vicinity
Paisley Campground &Resort
EC File No.: 2006-216-M
Dear Mr.Paisley:
Thank you for contacting our office concerning your proposed campground and
resort development located approximately five miles north of the City of Shelton and
west of SR 3. The Washington State Department of Transportation(WSDOT)is
requesting that you provide the following information on your proposed
development:
• The deed documents that demonstrate either that you own the property where
the existing driveway is located or that you have easement from the adjacent
property owner(s) for use of this driveway. The referenced driveway
connects with SR 3 in the vicinity of mile post 7.78,left vicinity.
A traffic trip generation and distribution report for the build-out of your
proposal. Please be advised that WSDOT may request a Traffic Impact
Analysis at a later date.
• A sight distance analysis for your proposed access to SR 3.
• A scalable site plan showing your proposed development and your easement
or ownership for the proposed access to SR 3.
I am also enclosing a copy of an Application for Access Connection in accordance
with your request. Should you wish to complete and submit the application at this
time please note the additional required submittals on page two of the application
including a drainage report.
Mr. Gregg Paisley
March 30,2007
Page 2
Should you have questions or need additional information please contact me at your
convenience.
aiew Engineer
WSDOT, Olympic Region
AH:ps
Enclosure
cc: Allan Borden, Mason County
Rebecca Hawkins, WSDOT
Lowell McBee,WSDOT
Larry Deemer, WSDOT
Brent Schiller, WSDOT
Gregg Paisley
4919 Lakeridge Drive East,Lake Tapps,WA 98391 253-709-1887
May 7,2007
Ms.Alana Hess
WSDOT Olympic Region Headquarters
5720 Capitol Boulevard,Tumwater
P.O.Box 47440
Olympia,WA 98504-7440
260-357-2600
RE:
SR3,Mile 7.78
Paisley Campground&Resort
EC File 2006-216-M
Dear Ms.Hess,
Thank you for your help with my project that connects with SR3. Enclosed find the remaining
documents requested in your letter dated March 30,2007. To summarize your request:
1. You asked for the deed documents that show my ownership of the parcels and easement in
question. I emailed these to you previously and copies are enclosed.
2. Enclosed is a traffic trip generation and distribution report,both for the single event in 2007 as
well as projections for subsequent years to the extent such projections are possible.
3. Enclosed is a sight distance analysis. This shows a sight distance of 517 feet in the
constrained direction(looking north towards the crest)and over 1500' in the unconstrained
direction.
4. Enclosed are the details of that portion of the project currently undergoing permit review by
Mason County. There are additional structures/land uses/attractions planned but future
elements but these all require variances or special permits or quasi-judicial review or are subject
to special technical review(e.g. geo tech). So it cannot be known at this time what will or won't
be approved.
5. Additionally I have enclosed detailed measurements of the access connection as well as
photos. I am very concerned about safe and efficient access to SR3 and I hope WSDOT will have
ideas how I can best improve access.
On the latter point,I should mention that though SR3 is my sole ingress and egress point at this
time,I expect to eventually purchase adjacent parcels that might provide access to County roads
(Greenview Lane)and additional access points to SR3 (perhaps one or two driveways to the
north). I should know more later in the year, so it might be helpful to sit down with WSDOT and
learn what best practices can be applied,both for the existing access and for possible future
additional access points.
In the meanwhile,I included three ideas that might ameliorate access problems and minimize
traffic disruption. See the driveway drawing for details.
I have submitted a permit application and enclosed a check. Here is my thinking as to possible
next steps. These three facts are key: 1)There is only one,brief event in 2007 and it will
generate negligible traffic(see details on trip generation report),2)the larger attractions(e.g.
Shakespeare Theater,Jewel Auditorium,Farmers Market,Amphitheater,et al)that will generate
the bulk of traffic in subsequent years haven't yet been submitted to the County for consideration
and none will be ready before mid-2008,3)It is possible that I might acquire additional
properties with road access as early as summer,2007.
Consequently,perhaps WSDOT might wish to limit its involvement with my project in 2007 to
simply helping me improve safety for this year's event(July Wh),perhaps by authorizing the easy
improvements noted on the driveway drawing or whatever else you would like to see done. Then
this fall,after I have a better handle on what 2008-forward.will look like for trip generation and
for alternate access points,we can reconvene and agree on further modifications or
improvements.
Thanks again for your help and I look forward to working with WSDOT.
Sincerely,
Gregg Paisley
Sight Distance Analysis Date: 4-30-07
Paisley Driveway Time of day: Noon
Mile 7.78 State Route 3 Speed posted: 50 mph
Shelton, WA 98584 Traffic controls present: No controls
Intersection maneuver: N.A.
Weather: Clear
Horizontal curve: No
Vertical curve: Yes
00 Major roadway width: 40'
r`
No. of lanes: 2
a� (X)r- Stopping distance recommended: 425 feet
(X)m- Stopping distance measured: 517 feet
c�
3
a�
b
a�
a
sl got
(X)r-Recommended Stopping Sight Distance=425 feete�
1500'+Sight Distance (X)m-Measured Stopping Sight Distance=517 feet
Shelton Allyn
Conclusion: (X)m> (X)r. The measured sight distance of 517 feet is more than the recommended
sight distance of 425 feet (2001 AASHTO). Sight distance for this section of roadway is adequate.
Paisley Driveway way l
Mile 3 s apprOx
Shelton WA 98 1S/
Top °f 25' c Grade
driveway 12'
where it
levels off
Possible improvements:
WSDOT fence 1. Eliminate left hand turn to all but residents.
(approx at �� �. ' 2. Widen mouth from 59' to 85'
easement?) o 3. Create turn-in lane by widening shoulder
19' _ _ _ _ - — _ _ - _ 1 from 8' to 20' by replacing ditch with
culvert under paved area. New turn-in lane
could be 100' to 200' and still maintain 425'
Not to scale I sight distance to last car in line.
12" Culvert
2 '
AIIIIIIIIIIIIIIS
,
i
59'
_ N
IF
• • • o
Cones & signage to prevent left turn, except for residents?
N
too
Drainage Report
Paisley Project, Mile 7.78, Shelton, WA 98584
The driveway shown below has been in existence and unaltered since State Route 3 was built in its
present location. The driveway and adjacent banks are stable with no drainage problems. Due to the 15%
slope, drainage is quickly and thoroughly accomplished with shallow ditches on each side of the
driveway that flow down to the ditch on SR3. Even during the wettest weather(such as last year)
water flows unnoticeably and without creating bog or mud areas. In winter, no standing water has been
observed in the SR3 ditches, due to the slope of SR3 and infiltratable soil.
If the driveway was modified as proposed on the enclosed driveway drawing, this would simply push
the driveway ditch 25'north where it would retain its slope, shape, and drainage flow and characteristics.
The newly-carved embankment would be replanted with native vegetation. If a turn-out lane is create
as proposed over the SR3 ditch to the north of the driveway, then a curtain drain(connected to the
culvert) could be installed where the widened shoulder meets the bank. This same curtain drain would
be enlarged with rip rap where the driveway ditch reaches the bottom.
r
r
i
:.,:m
i
n
t
Trip Generation and Distribution Report
Paisley Project, Milepost 7.78, Shelton, WA 98584
April 30, 2007
2007 through May, 2008
Between now and May, 2008, there is only one event scheduled, a kids music camp. It
consists of four consecutive sessions, each lasting six days. It commences Saturday July
8`h and ends Sunday, August 4`h, 2007.
The camp has been operating for 34 years at a different site. Every year 550—600 kids
sign up. This year is already 70%booked and enrollment will close at 600. Parents drop
kids off on a Sunday between noon and 6pm and pick them up the following Saturday
between 9am and 3pm. Thus, for 2007 through May, 2008 there are only eight, six-hour
windows where traffic will materially increase in the access connection driveway.
In addition to the students/campers there are 60 instructors. They stay the entire month,
filtering in the week ahead of camp and filtering out the week after.
Trip Generation, 7th Edition, Institute of Traffic Engineers (ITE), does not provide a land
use comparable to this sort of camp. However, in this case the maximum number of
attendees is precisely known, as is their arrival and departure windows, and carpooling/
busing habits.
Attached is Table 1, showing anticipated traffic for the camp.
Based on Table 1, the increase in traffic of SR3 will not be material, in part because the
overall traffic generated by the music camp is small,but also because it occurs on a
Saturday and Sunday.
From the data below, it can be reasonably surmised that weekend traffic at mile 7.78 is
7% lower than weekday traffic, a reduction of 910 cars per weekend day or 1820 for the
weekend. The total number of cars visiting the music camp will be approximately 120
per weekend day or 240 for the weekend. Thus, even with the increase in music camp
traffic, overall traffic on SR3 will still be 6%below weekday averages.
R068 is at milepost 28.68 on Highway 3
AVG SUN AVG SAT AVG FRI AG WEEKDAY AVG WEEKEND DAY ANNUAL AVG Day
R089 BOTHWAYS 13887 16315 19506 17764 16549 17107
R089 NORTHBOUND 7430 8018 9538 8996 8322 8663
R089 SOUTHBOUND 6457 8297 9968 8768 8227 8445
AVERAGE DAILY TRAFFIC VOLUME
ROUTE FUNCT TRUCK PERCENTAGES 2002 2003 2004 2005
003 006.57 AFTER JCT JOHNS PRAIRIE RD 1 13000* 13000 13000 13000
003 008.96 BEFORE JCT AGATE RD WYE CONN 1 12000* 12000 13000* 13000
June 2008—forward
The project will be built in phases over the next five or so years. Each year,new
structures, features, and attractions will be added. However, at this time it is impossible
to accurately establish the timeline or development details (including the resultant traffic)
since there are numerous County approval processes that must first be undertaken.
In addition,the nature of the project is so unusual,both in its individual elements and
taken as an eventual whole,that Trip Generation, 7th Edition, (ITE) provides no
comparable land use categories. However,the following categories provide partial
comparability.
Resort Hotel (330). One part of the project that is today under review by the County and
likely to be approved is the camp structures. There are 24 sleeping rooms being built for
2007 with another 24 for 2008. These 48 rooms will eventually also host corporate
retreats, usually Monday—Friday,when camps(such as the 2007 music camp)are not in
session.. So Land Use 330 bears some comparability, albeit marginal because of lack of
amenities(e.g. cocktail lounge), old-world theme(no technology), and the fact that
people will tend to remain on-site for the duration of their stay(typically 2—5 days)with
little come-and-go in vehicles.
Using Occupied Rooms as the variable and the minimum rates (defensible given lack of
amenities, etc.) and average rates for Weekday/A.M. /P. M. Peak Hour of Generator:
A.M. Peak Hour of Generator;
48 Rooms x minimum rate .34= 16.32 trips
48 Rooms x average rate .47 =22.56 trips
P.M. Peak Hour of Generator:
48 Rooms x minimum rate .36= 17.28 trips
48 Rooms x average rate .59=28.32 trips
Campground/RV Park(416). The only other part of the project that has been
submitted to the County for review is a request to have 80— 150 primitive camping sites
dispersed through the forest. This will come up for approval later in the year and may be
ready by June 2008. There are no RVs involved and people must hike into their sites,
thereby reducing likely come-and-go in vehicles, so it is reasonable to include the
minimum rate along with the average rate. Taking 100 primitive camping sites as X.
(Note: Land Use 416 trips should not be added to trips from Land Use 330 because most
camping occurs on weekends while most corporate retreats occur on weekdays. Also,
these trips should not be added to music camp trips(Table 1)because for the security of
the kids general camping will not be allowed when camps are in session.
, g P g p )
A.M. Peak Hour of Generator;
100 Occupied Camp Site x minimum rate .29=29 trips
100 Occupied Camp Site x average rate .32 =32 trips
P.M. Peak Hour of Generator:
100 Occupied Camp Site x minimum rate .38 =38 trips
100 Occupied Camp Site x average rate .48 =48 trips
Multipurpose Recreational Facility(435). No comparability: the project has none of
the listed activities or elements.
Live Theater(441). By 2009,it is expected that a live theater will be approved and
constructed so this land use is included here. However,the trip generation rate is
obviously too low for this project since the reference study was conducted in suburban
NYC where mass transit is prevalent.
Assuming an audience of 1000 as X:
Weekday P.M. Peak Hour of Adjacent Street Traffic:
1000 attendees x .02 =20 trips.
Arena(460). By 2010 the project expects to have approved and constructed an indoor
auditorium. However,the 40,000 square foot footprint that will be requested is 400%
larger than what zoning allows so a variance will be sought. When and if approved, and
actual square footage is known, a trip generation report will be produced for this land use.
Amusement Park(480). By 2009,various pieces of the project, if approved,will
resemble the ITE description of an amusement park and a trip generation report will be
produced for this land use.
Recreational Community Center Park(495). No comparability: this category is for
YMCAs and the like.
Table 1
Trip Generation, 2007-May 2008
Paisley project, mile 7.78, SR3, Shelton, WA 98584
AWDVTE, 2007 through May 2008* 25 Varies from week-to-week from 10 -40, 25 is typical
Camp event**: total vehicles trips per day trips per hour
Sunday, July 8, 2007 120 240 40 noon -6pm, weighted for carpooling and busing
Saturday, July 14, 2007 120 240 40 9am - 3pm, weighted for carpooling and busing
Sunday, July 15, 2007 120 240 40 noon -6pm, weighted for carpooling and busing
Saturday, July 21, 2007 120 240 40 9am - 3pm, weighted for carpooling and busing
Sunday, July 22, 2007 120 240 40 noon -6pm, weighted for carpooling and busing
Saturday, July 28, 2007 120 240 40 gam - 3pm, weighted for carpooling and busing
Sunday, July 29 2007 120 240 40 noon - 6pm, weighted for carpooling and busing
Saturday, August 4, 2007 120 240 40 9am - 3pm, weighted for carpooling and busing
* Instructor traffic is included here
**These numbers assume full enrollment
Page 1 of 3
Kell McAboy- Thanks for your response, here's comments...
From: Gregg Paisley
To:
Date: 6/6/2007 12:47 AM
Subject: Thanks for your response, here's comments...
CC: ,
Dear Ms.Hess,
Thanks again for your response.
1. I learned from Mason.County this morning that WSDOT has raised SEPA issues. Phase 1 of my
project(1 kitchen/shower,2 bunkhouses, 39 parking spaces, 10,800 sf) is exempt from SEPA. In
talking with the County today, they confirmed that my Phase 1 plans--the only plans under submission
at this time--do not appear to trigger a SEPA review.
As the WSDOT Development Services Manual, Section 3.1.09 states, the threshold for a SEPA
review is by default the minimum flexible threshold unless a County,by resolution, opts for an increase
up to the allowable maximum. Mason County has opted for the maximum threshold: Mason County
Code: 8.16.020: Flexible thresholds for categorical exemptions. (a)Mason County establishes the
following exempt levels for minor new construction under WAC 197-11-800(1)(b) based on local
conditions: (3)For office, school, commercial, recreational, service or storage buildings in WAC 197-
11-800(1)(b) (iii): Up to twelve thousand feet and up to forty parking spaces.
My current submissions are so close to the limit that it is inevitable that a SEPA review will be
triggered when I submit additional building applications to the County,probably in 2008 or later.
However, as stated in the letter that accompanied my access permit application: the attractions that will
eventually generate the bulk of the traffic haven't been submitted to the County and approval of same is
by no means certain if and when I do eventually submit them.
2. One factor that may have led WSDOT to assume I triggered the SEPA threshold is that I have 4
bunkhouses being reviewed. But the County knows,though WSDOT probably doesn't,that only 2 are
slated for construction now and the other two are included on a"Stock Plan" application for future
permitting. This is a County program that avoids redundant reviews of identical structures. In this case,
the County is switching from IBC 2003 to IBC 2006 in July, so they required me to submit all
bunkhouses together if I wished to take advantage of the Stock Plan program. But site plans on file with
the County clearly note that only 2 bunkhouses will be constructed at this time.
3. Today I told the County I currently have a valid access permit under RCW 47.50.080(2),which reads
"...Access connections to state highways identified on plats and subdivisions approved prior to July 1,
1991, shall be deemed to be permitted pursuant to chapter 202, Laws of 1991..." Further, WAC 468-
51-120 (1) "...All connection permits issued by the department prior to the effective date of this chapter
remain valid until revoked..." Finally,WAC 468-51-030(1) states: "...Ifa property owner orpermit
holder who has a valid connection permit wishes to change the character, use, or intensity of the
property or development served by the connection, the department must be contacted to determine
whether a new connection permit would be required...." To prove my assertion to the County that I
already have a valid access permit I am sending them the same documentation(pre-1991 recorded
easements and current deeds)previously submitted to WSDOT.
4. I initiated communication with WSDOT on this project in February, 2007, immediately after my
file://C:\Documents%20and%20Settings\kelhn\Local%20S ettings\Temp\XPgrpwise\466604... 6/6/2007
Page 2 of 3
rezone was approved. I subsequently submitted an application dated May 7, 2007 to upgrade the access
permit, should WSDOT deem an upgrade necessary. No actual change in use or traffic has yet occurred,
no modifications to the access have been made, and I have submitted an application, so under RCWs&
WACs there is no grounds for revoking the existing access permit. Therefore: I have now, and will
continue to have, a valid access permit until such time as WSDOT proposes requirements, if any,
to upgrade the permit and I carry out those requirements. At that time I will have an upgraded
permit,with no gap in-between permits. If WSDOT does not agree with this contention,please say
so and point me to the applicable RCWs/WACs.
5. Consequently,I request WSDOT now confirm to Mason County that I do indeed have a
current access permit and that an upgraded permit is in process. I believe this will satisfy the
County so they can release the hold on my permits caused by WSDOT actions.
6. I should reiterate that at this time I am seeking only a Category I permit(minor connection). i.e. I
now have a Category I permit and wish to stay in Category I which tops out at 99 AWDVTE. That is
the box I checked on the application and why I paid the appropriate$500 fee for Category I. 99 or less
AWDVTE will meet my needs for at least the next 18 months and it is premature for me to forecast
traffic beyond that. As noted in the Trip Generation Report: "...June 2008—forward: The project will
be built in phases over the next five or so years. Each year, new structures,features, and attractions
will be added. However, at this time it is impossible to accurately establish the timeline or development
details (including the resultant traffic)since there are numerous County approval processes that must
first be undertaken..."
Thus it would be unwarranted for WSDOT to make any assumptions as to my future traffic or to
propose to elevate my permit to Category II since no one knows what will or won't happen with Phase 2-
and-beyond applications.
7. SR3 at my driveway is a Class 2 highw�y so all permits are,by law,Nonconforming. WAC 468-51-
100, (Nonconforming Connection Permits), states: " (1) Traffic volume. The maximum vehicular usage
of the connection shall be specified in the permit..." So to make it easier on WSDOT,the County, and
me by maximizing the threshold that triggers a revisit,I wish to amend my access permit application
to request a Category I permit for 99 AWDVTE which of course will be legally binding on me
under WAC. This is substantially above the 10 -40 (25 typical)current and anticipated AWDVTE
levels but provides room to grow and to accommodate spike usage.
Thereafter, any number of occurrences will cause us to revisit the access permit: Eventual additional
County approvals in advance of build-out, acquisition of adjacent properties,unexpectedly high loads
with existing facilities, etc.
8. You asked who prepared the Trip Generation Report, Sight Distance Analysis, et al. Under WAC
468-51-060, an engineer stamp is required for Category II &III traffic data but not for Category I, so I
prepared the documents myself and any questions should be directed to me. Also, the reason I did not
provide drainage calculations is that, if my neighbor's recollection is correct,WSDOT built my
driveway as part of the SR3 relocation project. So please check WSDOT records for those calculations.
I can do them for WSDOT if your records are incomplete or if I am in error as to the the history of the
driveway. Also, I can calculate the additional flows if you wish me to improve/enlarge the driveway as
proposed.
Ms. Hess,your DSM 2.2.09 notes: "WSDOT has increased its commitment to work closely with...the
general public." I can see from your efforts that you take that commitment seriously and, and as noted
in a previous letter, you are a credit to your agency. You will find I too work hard to communicate,
cooperate, and devise win/win solutions. With this project,beyond the relatively simple Category I
application presently under review, I would welcome meeting(s)to lay out a game plan for the next few
file://C:\Documents%20and%20Settings\kellm\Local%20Settings\Temp\XPgrpwise\466604... 6/6/2007
Page 3 of 3
years to ensure that WSDOT and I both meet our objectives with my access connection. I am available
at your convenience for a meeting.
Thanks again,
Gregg
253-709-1887
file://C:\Documents%20and%20Settings\kellm\Local%20Settings\Temp\XPgrpwise\466604... 6/6/2007
Washington State Olympic Region Headquarters
MADepartment of Transportation 5720 Capitol Boulevard,Tumwater
Douglas S. MacDonald P.O.Box 47440
Secretary of Transportation Olympia,WA 98504-7440
360-357-2600
Fax 360-357-2601
TTY: 1-800-833-6388
www.wsdot.wa.gov
June 8, 2007
Mr. Gregg Paisley
4919 Lakeridge Drive East
Lake Tapps, Washington 98391
RE: SR 3, Mile Post 7.78 Left Vicinity
Avery Township Development
EC File No.: 2006-216-M
Dear Mr. Paisley:
The Washington State Department of Transportation(WSDOT)received your
Application for Access Connection on May 18,2007. This application is for access
to SR 3 at the approximate mile post of 7.78 left vicinity for your proposed Avery
Township Development.
Please be advised that WSDOT will require additional information to continue
processing your application. WSDOT is reviewing the documents you have
submitted as proof of easement to SR 3 for ingress and egress. In addition,WSDOT
will require that a Traffic Impact Analysis (TIA)be prepared for your proposal. The
TIA should encompass the build-out of your development proposal and include event
peak trip analysis. Please note that a Category I permit is not the proper
classification for this access application therefore the TIA must be stamped and
signed by a professional engineer.
Thank you for your time and attention to this matter.
Sincerely,.
Alan
Development Review Engineer
WSDOT, Olympic Region
AH:pr
r
licataon for Access Connection
For Department Use Only
Preapplication Conceptual View? i Nonconforming Connection? JI Variance?
Category I - Minimum Connection Category 11 - Minor Connection
Field (agricu(tural),forest lands,utility operation and $50.00 Less than 1,000 AWDVTE $1,000.00
maintenance �
I� " 1,000 to 1,50C AWDVTE $1,50C.00
For each residential dwelling unit(up to 10 units) $50.00 J
utilizing a single connection point Fee per additional connection point $250.00
Other,with 100 AWDVTE or less $500.00
I I Fee per additional connection point $50.00
Y..
Category III - Major Connection Category IV -Temporary Connection
1,500 to 2,500 AWDVTE $2,500.00 Base fee per connection $100.00
Over 2,500 AWDVTE $4,000.00
Fee per additional connection point — $1,000.00
LlIncludes Median Opening
Proposed Use
State Highway Number N iie Post County
1/4 of the 1/4 Section Township Range E/W _
Fees in the amount of are paid herewith to defray the basic administrative expense incident to the processing of this
application according to VVAC 468-51,RCW Chapter 47.50,and/or RCW Chapter 47.32, and amendments thereto. The applicant further promises
to pay additional amounts as shall be billed,if any, in reimbursement of the actual costs of the Department.
Fee Total:
The undersigned submits said application and accepts the conditions as set forth.
Applicant, Owner(Print Full Name)
Checks or Money Orders are to be made payable to
Address "Washington State Department of Transportation"
City State I Zip Code For Consultant Use Only
Consulting Firm
Teiepnone Number
Address
Applicant Authorized Signature
City State Zip Code
Print or Type Name Telephone Number
Title Consultant's Representative
Federal Tax ID No.or Soc. Sec. No. (Optional) Print or Type Name
Title
Dated this day of
RAMPS-Appltcauon for Access connection-Page I
Additional Information Required on Separate Sheets:
A. Access Connection Permit (access, driveways, etc.):
1. Site plan showing access location and development of site (All except farm or private
residence).
2. Vehicle trip generation (For commercial and multiple residence).
3. Land use restrictions or stipulations, if any, and agency involved.
4. Drainage Plan (With calculations required).
5. Landscape plan (If local agency requirement).
6. Current complete names, mailing addresses, and telephone numbers of the property
owner(s), the developer(s), the appicant, the transportation and legal consultant(s)
representing the applicant (if any), and the local government representative(s)responsible for
processing the development's approval,
Connection and roadway design documents-for Category II and II permits shall bear the seal and signature of
a professional engineer, registered in accordance with RCW Chapter 18.43.
For Department Use Only
Engineer's/Supervisor's Report
Reviewed in the field this day of
Comments
I
I
I
Signature
Engineer/Supervisor
goaapc_4-4-6—1nr ArrpSR'(nnnodion-PBOe 2
If Is
Washington State Olympic Region Headquarters
Department of Transportation 5720 Capitol Boulevard,Tumwater
Paula J. Hammond, P.E. P.O.Box 47440
Secretary of Transportation Olympia.WA 98504-7440
360-357-2600
Fax 360-357-2601
TTY: 1-800-833-6388
wwwmsdotma.gov
September 2, 2008
Ms. Pam Bennett-Cumming,Senior Planner
Mason County Community Development
411 North 5`h
P.O. Box 279
Shelton, Washington 98584 TO BE KEPT IN THE
RE: SR 3, Mile Post 7.75, Left Vicinity PARGLEL FILE
Avery Township Development
DS File No.: 2006-216-M
Dear Ms. Bennett-Cumming:
The Washington State Department of Transportation(WSDOT)has reviewed the
Traffic Impact Analysis(TIA)and interim event Traffic Control Plan for the Avery
Township development. As indicated in our July 30,2008 correspondence WSDOT
has significant concerns with regards to safety and operational impacts to SR 3 that
will result from this development.
This letter outlines WSDOT's requirements for the construction of necessary
improvements to SR 3 to accommodate traffic to and from the developed site and for
the interim traffic control plans for events scheduled in September and October 2008.
Traffic Impact Analysis
The TIA describes the development as a recreation destination and event resort.
Total trip numbers,the timing of peak hour trips and distribution vary depending on
use and event types and schedule. The following improvements to SR 3 should be
constructed to accommodate this development:
• Construction of a northbound left turn lane and southbound right turn lane on
SR 3 are warranted. Associated illumination and access design will be
required as part of these improvements.
• Construction of these improvements must be done in accordance with
WSDOT standards and specifications and will be subject to review and
approval through the"Developer Agreement"process managed by our office.
All improvements must be constructed by October 1, 2009.
Ms. Pam Bennett-Cumming
September 2, 2008
Page 2
Traffic Control Plan
Traffic control is an interim and temporary means of managing traffic for events at
this location and is subject to WSDOT review and approval on a case by case basis.
The Traffic Control Plan(TCP)has been reviewed for use only with the September
27, 2008 Extreme Sports and October 4'h and 51h 2008 Renaissance Fair events. To
implement the proposed TCP for these two events WSDOT will require the
following:
• Two lanes of traffic to and from the site to SR 3 must be established. Pull
outs may not be used. The owner is responsible for obtaining any necessary
easements,permissions and/or approvals from adjacent property owners.
• The TCP must be revised as shown on the enclosed plan and re-submitted to
WSDOT for review and approval. To enable sufficient review and approval
time to accommodate the September 27, 2008 event schedule these revisions
must be submitted to WSDOT no later than September 16`h,preferably
sooner.
• If two lanes of traffic cannot be established the TCP as revised must be
implemented and a maximum of 100 vehicles may be at the site at any given
time. Allowing more than 100 vehicles on the site with only a one lane
access will result in significant delays and backups on SR 3. The owner will
be responsible for ensuring this limit is not exceeded.
• An insurance bond in the amount of$2 million for each event must he
provided.
We respectfully request the County's consideration and implementation of these
requirements. Should you have questions or need additional information please
contact Alana I less at 360-357-2725 or by email at hessa c,wsdot.wa.gov at your
convenience.
Sincerely,
Dale C. Severson, P.E.
Development Services Engineer
WSDOT, Olympic Region
DCS:pr
Ali
Enclosure
4
a w
Ms. Pam Bennett-Cumming
September 2,2008
Page 3
cc: Betty Wing,Mason County
Bob Fink,Mason County
Steve Bennett,WSDOT
Lowell McBee,WSDOT
Rob Peterson,WSDOT
Dewayne Matlock,WSDOT
Gerald Nelson,WSDOT
Jim Norman, WSDOT
Duke Stryker,WSDOT
Larry Deemer,WSDOT
Brent Schiller,WSDOT
Alana Hess,WSDOT
CMS
SPtC-tnt_ EXPtL`I'
W20_7,4
EVENT Avery Town 7ELAY5��tvent-Related Traffic Control Plan AW��o
l!C )) 4)
FLAG b i�
Wl c-7A W 3-4 '�, srrt
FLAGGER I BE PREPARED R4-1AHEAD
'T A FIV J� (symbol) �° I TO STOP DO NOT J J
i�'2C.-7B Pnss '
FLAGGER
AHEAD \fit 500 FEET
(symbol)
� �� R ,
s
FLAGGER'B' 500 FEET
Flaggers at crest of hill
`.i00 FEET
Phase B C D /�
I STOP STOP SLOW f YP.
II STOP SLOW STOP 500 FEET 3
Ill SLOW STOP STOP
• T k;s gcc�rss f�«c) IMIAS �a:h 1,L_?V €,a►.l lams
ru , W 14-3 FLAGGER'D'
NO PASSING � 5
0.m,o F W 14-3
ZONE p c M'd`1 NO PASSING
(pennant) ��� if,% u\J �., ZONE
FLAGGER'C'
���c �j` ' (Pennant)
500 FEET NOTES
/ FLAGGING OPERATIONS AT NIGHT WILL BE LIT AND
WILL BE USED TO BRING ATTENTION TO SIGNS
S00 FEET 4y ,fi� I /I�a...�t� ='<<j pl s
t c A ,yuw rn a./19► a►Sl1►c n I el k 0-1
FLAGGER y HE TE D T N R t
500 FEET AHEAD
O Y - F C E G T' '
(symbol)
A
500 FEE 1 ❑ W3-4 V1/74_ R U T A O V D
BE PREPARED 7A I AFF SE. CAT _ GC, z
R4-1 TO STOP
DO NOT FLAGGERS ON SR-3 ACT AS TRAFFIC SENSORS TU Z
PASS FACILITATE FLOW INTO AND OUT OF ACCESS > Q
3 4a-rvlk+ 11//
i!' — �Iq `�S rtlu+5.l; r�r►ain�air� v15 � 4jdC
txs Q ;
Con49J "J q41 {,rnc5. €
s�• r t I (jfl. `�)
F�L-rC��[Z �Af An •�-i��� r•u���a. �+Y� SR 3 � C
a
W26 7A 5}a j,r-M
Entire 50.24 acres (4 parcels: 35 + 5 + 5 + 5.24 acres), showing 2007
construction phase for Camp compound (1 Kitchen / shower, 2 bunkhouses).
Also shows primitive campsite locations for RV Park Permit application.
��� � "'�. S i .,� fir•� ��t: .' • ,
s
• • • • OP
Area within
red line •,' ' • „
thinned for
construction
access. � ► ,,�,
Majority '
will be * �` •1
restored to "• ." '� ' '�
# `
natural state �,.� �W`
or rain
1".V
garden. All
large trees ° K f
left standing >* •
except on � �ti�•,fi#. �' � � »� � ' � � .
r M
Q
oad f
N Bunk 2008 f �"��� -" 4'T„' '�- .:. � •� !` »
Kitchen/ 1 ♦ti•►+� r T 1 1i
showers * �
Bunk 2008 a�
� s
lip
Vault r !!3"
toilets -
septiclip
tanks
V46
Checklist
Paisley Site Plan Scale OK? Yes(1 =40'on camp compound page)
North Arrow?
Yes
Property line locations&dimensions? Yes
Notes: Label abutting streets? Yes(None abut site, see vicinity map for SR3 connection)
Shoreline/Surface water? OK(None within 300' of project)
All buildings 35' from all property and parcel lines Wetlands/seasonal drainage? OK g (None within 300' of project)
All buildings 35'feet apart Easements? Yes(See vicinity map)
Show existing development? Yes
(See Cam Compound page for details, to os, easements)
Proposed building footprint?Yes(On Camp Compound page)
Sewage disposal system? Yes(Locations below, details in Septic Application)
Scale 1' = approx 80' Existing and proposed buffers?Yes(On camp compound page)
Retaining walls? OK(None)
(See other Camp Compound Site Plan for 1" = 40'scale) Slopes? OK(See topos,no slopes near project)
Wells? Yes
'° Waterfront project? OK(This is not a waterfront project)
,,';' N Driveways site access?Yes
Stormwater run-of path? Yes
Land modification/grading permits? OK(Not required)
Group A well 330'
5 acre Parcel number:
32135 31 00081
35 acre Parcel number: 32135 3100000 •
Allowable building area: 100' /
(RTC zoning is 1:20)
76,230 sf available for building /
10,880 sf of structures shown
2 Handicap parking spaces / �`,� / /i�� /' �0
-1
O
L43840sf 3840sf
s
0 3840Sf 3840sf 20' all-weather fire road
0
N
674' O,
674'
Septic 0
tanks ti ;
& vault ��� 5.24 acre Parcel number: j�� •
toilets � 32135 34 00000
Allowable building area: o
(RTC zoning is 1:20) 5 acre Parcel number:
20' all-Weather fire road 11,413 sf available for building 32135 34 00080
10,880 sf of structures shown n
�._._._._._.�
321352400020 321352400010
Michael Banner Michael Kowalski 321352400000
321352400030 2311 Skyline Wayy 8110 Leschi Drive SW Mary Hicks
Michael Fincher Anacortes,WA 98221-2959 Lakewood,WA 98498-5954 801 W Limber Loft Drive
10285 Estate Lane SE Wagons West,AZ 85705
Olalla,WA 98359-9610
321352390004 321351300000
Randy Ranson Menke Lumber Co,Inv
Blvd 301 E Wallace Kneeland 1717 Marine View Drive
Shelton,98584-2987
Tacoma,WA 98422-4192
300'
Arnold Jacot
5291 E State Route 3
Shelton,WA 98584-8565
42 00000
31 00000
32 00000 Paisley
Moran Timber,LLC s 8/60
4483 E State Route 3
Shelton,WA 98584.8562 Ron Ferris 450
380 E Hiawatha Blvd
31 00091 Shelton,WA 98584-7851 4300
Paisley 010 AIM
_ Eric Jacot 43 0002
(— 5291 E State Route 3
Note: hOUses are 34 00000 34 00080 N Shelton,WA 98584-8565
Paisley Paisley o o ---shown
ShOW In m m 43 90041
approximately
correct locations 2b/G9
Michael O'Day
4771 E State Route 3 David Lundk'-A
Shelton,WA 98584.8529 Joanne Konrade I PO Box 687 SW
33 00000 PO Box 1222 I WA 98584-068
Shelton WA 98584-0947 43 D0030
.54 0no50
s4 00060 21 00z
21 00218/9
43 00001
REV 3/4/98 ( ti 3x009 N 0 ^ 32002 21 00010 ( g
NE-SE d` 430
OAKI AND RAY r. l. . 2:- SE-SE .44 E
� s
PA
Paisley Site Plan
August 18",2008
�.eI.: = F N
AO buildings ere et I•=d 30'from naghbonng Properties not owned by Paisley
All buildings eR at least 25'from other Paisley parcels ! t I f1,2 I
All building we a last 20'span
—wads: mad are all ma arc 20'wide with 12'deuana for emergency vehicles,0-12%grad Scale I"=100'e 1.ti ',,_ 'i�i ri;v;u
35 acre Parcel number: 32135 3100000
Allowable building area: Primitive camping
(RTC zoning is 1:20) (80-100 ales sa0ered through worts in small is.—I clesaings(i.e.rro trees ova 4"win be cut)
76,230 of available for building
74,880 sf of structures shown
'a r
)
m �
•� :'•
a Jewel
8 Pavilion \
50,000 sf
(allowable
under able
ratio but
requires \ 1 ` +letta� S'o'•
variance for
singe-
structure \
Sim)
\ -'Z
\ E u�
r----------------- \\ a \ otgM
Area of spindly \ ` _ 5 acre Parcel number.
eumrgis.a .
alders:Thin in \ 280 at r
32135 3100081
2009 to create rvew»1u _ - Allowable building area:
overflow parking. Teano-Noo{,'a'aai'> (RTC zoning is 1:20)
Requires SEPA/ Pumps lane``s.000 BPdf i \ ,•g. 10,890 at available for buildi
1
forest practices • try %'\ \ Gox80 10,850sf of structures show
' permit
,
IOD'sMry Zeoq •\a '!\ \ viI earea assorted small
✓ \\ 1 baild ng,totaling 2,150 at).
_____________ _p�_�
1'—r� �� 1a�� I fCv %', � \i Concessions in fenU.'**
%ea�QV.' \\ �., \t Ea4ioa wareal0----
1 G ! 1200 at 4
,P,p �t 5S$ w tb' 3g40 er / / 'J ® ' XoN�P
1 20'all weather fire road
® � r►. s P to•. r 4► P �r 4far 4m � aP.��,�, P
WO v t APB
do
gQ 40x�16 JOx 9,ix 16
$ R 3840 s( 3840 at t 1 0 ((() J
rn
1 \ g
t 5 acre Parcel number:
32135 34 00080
Alowable building area:
Parking area l:general \ ,1L 1, \ (RTC zoning is 1.20)
i (See parking diagrams&worksheet) \ \ / 10,890 sf available for built
\� 8,092 sf of structures stow
20'a0^eather fire%
•\aka wr i �r��.% Stream crossing
r �
5.24 acre Parcel number.
32135 34 00000 1320' \ , o
Allowable building area:
(RTC zoning is 1:20) .�
11,413 sf available for building
R
10.880 sf of structures shown t �'
a
�- t d
Fire Protection District 5
Central Mason County Emergency Services
Fire Protection Rescue Emergency Medical
EMERGENCY ireanife Safety
TO BE KEPT I N THE
Fire and Life Safety
Fire protection 8<Rescue ����f(— C
rN'e-Rer:are-A�/�i FIRE MEDIC PARCEL
FILE
Paramedic
MlssiO Ment: Advanced Life Support and Ambulance Service
"The protection of life,
health,property and the September 9,2008
environment."
To: Pam-Benett Cumming
Commissioners Mason County Department of Community Development
Tommy O.Taylor
Chuck Huff From: Dave Salzer
Pat McGanney Mason County FD 5
Chief
Richard A. Knight Following are comments regarding the proposed Renaissance Fair project to
cht&Rmason5.ora be located South of MP9 on SR 3 in Mason County:
Assistant Chief's
Tim McKern 1. The site is located at the end of an existing single-lane access road
ac- commencing at SR 3 and terminating 1000+feet up slope.
501 @mason5.ora 2, The access road grade appears to exceed 14% in several areas.
Dave Salzer
ac- 3. There is no defined roadbed in place to serve the site and no
502@mason5.ora designated area for a fire apparatus turnaround is evident.
Administrative The guidance document to support road improvements to this site is Title 14
Secretary Mason County Building Code, Chapter 14.17 Standards for Fire Apparatus
Brenda Foley Access Roads.
Brenda@mason5.or
That document details the process for submitting plans, for road
construction,including driving surface, bridges, and turnarounds at the
Business: termination of the Fire Apparatus Access Road.
Post Office Box 127
Allyn,Washington 98524 Given the challenges of the site for emergency vehicle access,we are
(360) 426-5533 or
(360)275-2889 requesting that the Fire Apparatus Access Road be a minimum of 20 feet
Fax: wide throughout,with the inclusion of a Cul De Sac Turn Around as
(360)275-9718 detailed in the Standards for Fire Apparatus Access Roads.
Visit us at:
www.mason5.org
PEOPLE SERVING PEOPLE SINCE 1953
1 � �
, "
tit
PEOPLE SERVING PEOPLE SINCE 1953
MASON COUNTY FIRE MARSHAL
I � Mason County Bldg.III 426 W Cedar St
PO BOX 186 Shelton,WA 98584
�i (360)427-9670 Ext.273
CODE ENFORCEMENT FIRE INSPECTIONS FIRE INVESTIGATION PUBLIC EDUCATION
Cul De Sac Turn Around
Area required for turn around located at a single residence. In this special
case,the area could,for instance, consist of pasture adjacent to the building
and will to continue to function as a viable turn around in adverse weather
conditions(ie remains solid in any weather).
Requirements for roads 20'in width and commerical sites Requirements for roads 12'in width
R45
R25 R45
Driving surface R33
in this area
is not required Driving surface
in this area
is not required
R28 28
R4 40
2
Minimum
12
"TRgMgr- SPOArs FE5-nVj41-
Vend ing Area
Stage
44f:
® Exhibition Area .Y" rt�
®
Concessions •` ; +
�
® Sanitation .,
Mason Counh "'�`
low
Concourse *'
VIP& Emergency
Parking air
M
f y
7 T`dr
X
4`7)40
�M!
inter/tacit � Y '
t
Parking;Are 9t
a
.� �� r
(7/3V/ 008) Barbara Robinson - Fwd. SR 3 Avery Township Gregg Paisley Renaissance Faire & Extreme Sports Festival Apootl.
From: Betty Wing
To: Barbara Robinson; Charell Holcomb
Date: 7/30/2008 5:24 PM
Subject: Fwd: SR 3 Avery Township Gregg Paisley Renaissance Faire & Extreme Sports
Festival Applications: WS
Please print this out and plan to discuss with Mr. Paisley at the pre-application conferences.Thank you.
>>> "Hess,Alana" <HessACcbwsdot.wa.gov> 7/30/2008 5:21 PM >>>
Dear Ms.Wing:
The Washington State Department of Transportation(WSDOT) has reviewed
the applications for the proposed Renaissance Faire&Extreme Sports
Festival events.These events are to be held on the property owned by
Gregg E. &Elisa K. Paisley located in the 4900 block of SR 3 mile post
7.75, left vicinity.The Renaissance Faire is scheduled for August 30
and 31, 2008 with an expected attendance of 5,000 to 10,000.The Extreme
Sports Event is scheduled for September 27, 2008 with an expected
attendance of 1,000 to 2,000.
WSDOT has serious safety and operational concerns with regards to the
impacts to SR 3 that will result from these events.The Renaissance
Faire is the most significant concern due to the expected attendance
levels and in that it will be held on Labor Day weekend.We are
requesting that the County require and condition the applicant and/or
property owner to provide WSDOT with Traffic Control Plans for each of
these events.These plans must be prepared by a licensed professional in
accordance with WSDOT's requirements. In the case of the Renaissance
Faire the plans are due to WSDOT for review no later than August 15,
2008.The due date for plan submittal for the Extreme Sports event will
be September 12, 2008.All submittals should be sent to my attention.
WSDOT will notify the State Patrol of these events.The County should
expect contact by the State Patrol directly or through WSDOT and they
may have requirements in addition to WSDOT's.
We respectfully request that the County not issue the permits for either
one of these events until the Traffic Controls Plans have been approved
by WSDOT.
Thank you for this opportunity for review and comment. Please contact me
at your convenience should you have questions or require additional
information.
Sincerely,
Alana Hess
Development Review Engineer
Olympic Region Development Services
Washington State Dept of Transportation
5720 Capitol Blvd
P.O. Box 47440
Olympia,Washington 98504-7440
(360)357-2725
(360)357-2748 FAX
hessa(&wsdot.wa.gov