HomeMy WebLinkAboutStructural Calculations for BLD2005-00958 - BLD Engineering / Geo-tech Reports - 5/27/2005 Randall Thompson, P.E.
13 THOMPSON
E N G I N E E A I N 6 380-432-6903
P.O.Box 2003 - Shelton,WA • 98534 Fax:360-426-0726
00
STRUCTURAL CALCULATIONS ""
JEREMY DEEMER SHOP BUILDING
PROJECT #05-203
LOCATED AT
131 E JENSEN ROAD
SHELTON, WA 98584
BY
RANDALL N. THOMPSON, P.E.
WAV
71 r
sJ0/1 At- .�'°,l
t .w it -24- .,
SCOPE OF WORK:
Provide VERTICAL&LATERAL ANALYSIS for new shop building per client's request.
PROJECT DESCRIPTION:
Single story wood post &stud wall framed structure.
DESIGN PARAMETERS:
GRAVITY LOADS:
Roof: Trusses and comp = 10 psf dead
25 psf snow
35 psf total
Walls: Conventional = 10 psf dead
LATERAL LOADS:
3-sec wind gust speed = 85 MPH,Exposure B
Seismic Design Category"D 1"
SITE SOILS DATA:
Assumed allowable
soil bearing pressure = 1500psf
• •
ILI
�����!31��'��i�i�L�11�11',��1�c��il�i'iii� i�■ ::�'i��
MEN■M EMEMEMEMImm nmmm■..; ...mmm
MENEM ■��■■���I�dti �J LF l■
����■■�������ii�ii■iiiiiiiiiii�i�
Job:
THOMPSON Date: 10� By:
E N G I N E E R I N G
360-432-9903 • Fax: 360-426-0726 Sheet: Page of
fw
op
021
A —4
D-1 vA, V-61 p
QA)q, )K
-71
r
r �^
I I I I I
Job:_
THOMPSON Daft
E NO I NEER ING /�
P.O.Box 8003 •Shelton,WA •98584 ShaC_ Of�
5HEARWALL PE.61 N GHAKI
WALL STORY 5HEAR TOTAL HOLPOWN OPTIONS
LINE LEVEL FORCE SHE UPLIFT
in
E:1
MINN �� wS r ���t`.-ice��'. . _.. ���t���l■■■
■■ N
som111m.ia�aaa�raaa■�a�aaaa■�ra��aaaaaaaa 1■IomN
■■■NEE i■I■■ommomm soon INonoom■os■m=MOONS■on■■so■ l Imom
■■■till ,IM4■MM■■M■■MEMO Io■o:■M■■■■■N ■OI/■■■oM NONE m!°° loos
mMM11111l�■■■■■■■■■■m■Nm■■m■■■mm■■■!momomm■m■mm� 1■l■■■
■■r1111I■l'■■rr■r■■■■r■fLon' No■MEN■■■■11 ■■.■■■■■M 1■l■r■
M■■Nllllmanomm■m■mrr■l■■NM■M■O■mmom m■■■■■■mm Iaim
MINIMUM mumomm■■mm■■mm mm■■nmm■■m■ ■nmmm■■M� 1■l�
M■■NEN I■1/■■■r■■■■■!■tnlL■■■■■■■■■■■!■■■■■■■r■rL i■I■■
M■■11% I■I■■■■■■■■■■M■f■■�".■■■■■■oosmNo■■■m■■O■■m on
NMI ION■
■■■sill: ■!i■M■sm■■■■®■®�1mMOst■■■■■■■■■m■s■■rM .I■■
MIME
■■■Ills 'I■■■■■m■■■■■■M■■A■■■■■■■mmmsmm■■m■■■■■■ .�■■■
Moslem movil Ion
I■■■m■■■■■■■■■■�I■■■■■■■■■■n■■■■■■r■■n I.Is■
m■mull !!!■■■■■■■■■■■wL�■■■■■■■n■M■■■■■■■■ [mom
s■mll,A 5MMM■■■■■OM■MMMEN M■msmmm■■mmo■■m■M IO
EARNED .(mm■s■mmmmmmm■■■Im! ■!m! mmmmmmmsM■■ 1soon
■■■ills m■mm■mmmm■m■msNlsosma�m=m loon
rENEM ■■■■ m■mmmmoll! :LION■
■Mosul M■■■■■■M■■■ ■■I ■m■■ ■■■mmoomm 1■1■■■■■ illi ■■M
m■mm■so■■m■■■■r�losommon
■m■NNN■ son ■omommomswwwH �■I■■■
C�'�f�W®R UMMUMMM IZZOMMMaEN
■■O�II:-m■O■s■MMOO■■OMMLI" INN
■■■Fill�:�■■■■■!■■■■■lMMs��aaaaaa�aa� M���a■�a�aa■ mMs■■
■■■Ills IMM■m■■s■■sO■■■■■■■■■m■■■■■■■■■■■■mm�i■■�'WIMEN
I■N■
■■MIII'r IOOSM■s■rMO■■■■■■■■r■■■N■■■■■■■■■■■■�■r■ �.Im
s■■IIII.IM■■■It■m�■■�■■■■mm■■rim■■■■mmm■■■■mm■no_.I■l■N■
moolUll:/sslml� l9l� /� loommom■■■mmo■s■■ SEEN
m■■I►il:IM■■011 G�'v%�� ' ' "loom■■■ommmm■■■Mm Imo■
�l1I 0 offilI■■mml t �!�111.1!�1� !/�111N■mm■t■■mm■■■ NINE
MMmilli i■■■mll ■■N=NOME ■f
so Mon mmmm so
M■■fill IM■■■LIMN■mm■■■■m■■■■■N mm■mm■mMM■smN - fmNm
M■■IIIII■MM■■ss■ms■■■■■ ■■ ■s■■mom■m■■■■■■■s■■ I■=
■MOIL ti M■sOM■■OO■M■MM■m■ omm■■ommMmN■m■ms■S o ■liii
moll. ■!L■s■■■sssMlM■Mn■n■■■MMI.■■■■MM■■
so MI■m■■■mmmmm■■ ■s■■■mm■■m■ mom■■■m■ IN MINN
■■■Ills=IMIN■■■■■■■■■■■�immommom mommam mom■m�imm Nam■
■■milli IONS Mon ■■■� M19■■mi9n mou■mn■m�on
N
M■■11 M.■■■/n I■ ■■■s■■■i■ i■m■■■nME,m■, ■■■ m■■m ■ ■
- I
■■
I■ M■■ oN■ ME ■
sHMEMO
Ili JENME �M■ M M
fill - MomOnt-O 0 . �r■rm
SEMI
Job.",
THOMPSON Date: �,� By:
E NO I N E E A ING
360-432-8803 • Fax:360-426-0726 sit' P Of
3 1.VCA--V"A.7
or
I m
S
ROIL40
v =
/VI�J I
1
gip• i
r 4.0
�ND
Pot f / U P RT Gt+r PIA41
8 = G''zgt� i�KE"SSUrt j 2f�'1-"� �Z•D-�•
Jab:
13
THOMPSON Date: By:
E N G I N E E R I N G
360-432-8903 Faz:360-426-0726 Sleet: Page of
2X&MJc4.IN9•24`OC
LAP FL%'LIN9 241 MN
NAIL(W-IO&S EA LAYER
2k6 BLOCKMG NAIL
f3l V&S N9 t FS �a
�j METAL
a
�A
�► 5,f-Vf �
uer,:-)IFAI 4
- 8
�I V LL
IL
1 ���y PT&xDr 9T TO TOP
,' A OF PIJw7L�19
W Z�� s� 16'G� PT�pf(/v301`E IAGS-SEE P1.4T!
I 1 LNDISTUM6 NAn VE SOU•
1 1
1 I
o � I
r I 3�I
i I
L_TJ
NATIVE -
=11
2`�II
1
.n WA��ROOF SECTION
Job: ��
13 THOMPSON Date: I l By:
E N G I N E E R I N G U
360-432-8903 • Fax: 360-426-0726 Sheet: Page U of
2X S SLKCG 01/ER wd 13 Woc
2X4 BRACE
s � -
Jab: /' v
13 THOMPSON Date: t,
E N G I N E E R I N G F
360-432-8903 • Fax:360-426-0726 Sheet: rage�-Of jCfJ
_.-._. ...>..�. .. ... <. (2)-10d'S INTO TRUSS
2>C6 FLAT SPLICE OVER
CTR OF BLOCKING
10d'S 0 8110C
2X4 E RAGE 4 HANGER
NAIL (2)-
INTO BLKG 2X BLOCKING
PRE-1'IFR TRUSS
T-5RACE TRUSS
Job: �---
13 THOMPSON Date: `j
E N G I N E E R I N G
__l `� I V
360-432-0903 Fax: 360-426-0726 Sheet: Page of
DSL TRL1S8
ZX6 OLO( Na
(WJ lod* MTO FURLIN COMMON
ew-was Mmd_IN TO MOUN
Job: —f�-
13 THOMPSON pate: 2� b� e,,:
E N G I N E E R I N G
360-432-6903 Fax:360-426-0726 Sheet: Page of
P40OF FURUN UY NI
CLIP TO
$X BUCG BETUEEN
F'lJRI_QJS
�•1.C7�lSS
I d (I� '�•� BOLT
o TK,NT PIT
F 2} S/51♦ Twm Bm-rs
•2X� w�
C"IFT1006T.-
IqR1►,l
P-QSI
cONN
Jab: `
13 THOMPSON pate: 27 By:
ENG INEER ING /J�-
360-432-8903 • Fax: 360-426-0726 Sheet. Page 2- of
Zxb ROOF PLIRL�
' .901� ELOPED
_ LS HANGER
f'FZE-ENGIRD
DOVE YFUSS xb BRACE At EA
T-BRACE BELOW
BRACE DETAIL
Job: - 3
THOMPSON pate: By:
ENG INEER ING
Sheet: Page of I
i3 360-432-8903 Fax: 360-426-0726
sejpsoN LS&" 04VERTED �7�
WAW.%M TO POST n l%�
`
2Xb BRACE l�l� �
P7 (molls I
(2)-10d'S INTO TRUSS
SIMfx.-ON T622 STRAP
T-BRACE 52 NS t FS OF POST FROM
2Xro FLAT TO POST
TPVV,5
U24 NANSER 0 U
T-BRACE TO POST
CONN
Job:
THOMPSON oar; �J 27 By;
E N G I N E E R I N G
360-432-8903 Fax:380-426-0726 Sheet: P Of J�
01-4
i
I
1
i
H -
�I'
`'
1
X -ULbpi TREATEn faTt,QTol 53/P
t `fit Tp� 1 AA �; ..�. z''x{,"TntAlt9
U 4:1 1.7+1
w u .Al, .S
o �• L
Job: `�✓J 1 % � �Cam"
THOMPSON Date: By:
E N G I N E E R I N G
360-432-6903 Fax:360-426-0726
Sheet: Page I of
2 SILL PLATE
W/ A$.'s 6 " O.G.
4" CONC. SLAB
W/ WN 6 EDGE NAILWG
— of
�iWill 11
Vz it
u (3) 04 BARS CONT.
NATIVE
UNDISTURBED
SOIL
S SLAB EDGE FOOTING
Jab:
THOMPSON Date: By:
E N G I N E E R I N G
I Of
360-432-6903 Fax:360-426-0726 Sheet: page
STRUCTURAL NOTES
General Notes:
These structural notes supplement the drawings. Any discrepancy
found among the drawings, these notes, and the site conditions
shall be reported ' to the Engineer, who shall correct such
discrepancy in writing. Any work done by the Contractor after
discovery of such discrepancy shall be done at the Contractor' s
risk. The Contractor shall verify and coordinate the dimensions
among all , drawings, prior to proceeding with any work or
fabrication. The Contractor is responsible for all bracing and
shoring during construction.
All construction shall conform to the applicable portions of the
latest edition of the International Building Code except where
noted.
Design Criteria:
1. Live Load = 25 PSF (Roof Snow)
2 . Dead Load = 10 PSF (Roof)
= 150 PCF (Concrete)
3. Wind = 2003 IBC Exposure B;85 MPH (3-sec. Gust)
4 . Earthquake = 2003 IBC, Category "D1"
5. Soil = 1500 PSF, Assumed Bearing
150 PCF, Assumed Lateral Resistance
Concrete & Reinforcing Steel:
1 . All concrete work shall be per the 2003 IBC Chapter 19.
Tolerances shall be per UBC Chapter 19, Section 07 .
Mixing, placement, and inspection shall be per Sections
03, 04, 05, and 06.
2 . Concrete shall be in accordance with ASTM 150.
f'c = 2500 PSI @ 28 day
slump = 4" maximum, 6% Air entrained
THOMPSON Date: G v1 6y:
E N G I N E E R I N G
360-432-6903 • Fax:360-426-0726 Sheet: Page—1—of
Carpentry:
1 . Structural framing shall be #2 Hem-Fir unless otherwise
noted.
2. 6X columns shall be ground contact pressure-treated #2
Hem-Fir.
3. 2X purlins shall be #2 Hem-Fir, kiln dried and stored in
a dry area prior to installation.
4 . Roof trusses shall be by a pre-approved manufacturer and
constructed according to the specifications of the Truss
Plate Institute.
Contractor And Truss Manufacturer Are Responsible For All
Bracing Of The Trusses Including End Wall Bracing And All
Other Bracing Between The Building And The Trusses Unless
Specifically Shown Otherwise On The Drawings.
Hardware:
All connection hardware shall be Simpson "Strong Tie" or United
Steel Products "Kant-Sag" .
CAUTION
PLACE TRUSSES PER MANUFACTURER' S RECOMMENDATIONS. BRACE PER
RECOMMENDATIONS.
CONTRACTOR TO FIELD VERIFY ALL CONDITIONS AND ALL ELEVATIONS.
x.
Ir„
Jab:
1
THOMPSON Date: � � By:
E N G I N E E R I N G
F Sheet: Page—L�of
360-432-8903 Fex:360-426-0726
TYPICAL SHEAR WALL NOTES
All wall sheathing shall be 15/32" CDX plywood, 7/16" OSB
(with studs at 16"o. c. ) , or as called out below, with
exterior exposure glue and span rated "SR 24/0" or better.
(5/8" T1-11 siding is an acceptable substitution except
where 5/8" or thicker sheathing is specifically called out
in the schedule below) . Sheathing may be installed either
horizontally or vertically.
All nails shall be 8d box (0 . 113"diameter) . Nail spacing
at all sheathing edges shall be as required below.
SHEATHING PANEL JOINTS LOCATED ACROSS STUD WALLS SHALL HAVE
THEIR FREE EDGES BLOCKED WITH NOMINAL THICKNESS MATERIALS
THAT MATCH THE EDGE NAILING MEMBER REQUIREMENTS BELOW!
SHEAR WALL SCHEDULE
� 15/32" sheathing nailed with 8d galvanized box at 6"
on .center all edges = 260 plf.
'T 15/32" sheathing nailed with 8d galvainized box at 4"
on center all edges = 350 plf.