Loading...
HomeMy WebLinkAbout11-85 - Res. County Road Project (CRP) 1042 MASON COUNTY COMMISSIONERS RESOLUTION NO. 11-85 COUNTY ROAD PROJECT' NO. 1042 WHEREAS, on Mason County Road No. 9010 -, known locally as the Shelton-Matlock Road, and more specifically located in S15-16 17-22-23-26-27, T20, R4 M.P. 3.1 to M.P. 7.2 work def ined as "construction" in the BARS Manual, Page 11­ 3, et sect, is determined to be neces- sary and proper, and WHEREAS, this project is identified as # 10 on the officially adopted County Annual Road Program. THEIT30RE, BE IT RESOLVED BY THE BOARD OF COUNTY COIS1ISSIONERS that it is their intention to perform Preliminary Engineering Co. Engineering Costs : $ 5 ,000.00 Consultant Costs: 25,000.00 Right-of-Way 25,000.00 County Eng' r. Forces and that said work is to be performed by and Consultant in accordance with (day labor/co' ni-xact) the Washing-Lon State Standard Specifications for Road and Bridge Construction as adopted by Mason County. BE IT FURTHER RESOLVED that the above described County Road Project is neces- sary and proper, and the estimated costs of said project are herewith set out as follows: Engineering $ 30,000.00 Right-of-Way $ 25 000.00. Road Construction $ Bridge Construction $ Engineer's Estimate in detail is on file in the office of the County Engineer. The County Road Project he-rein described is HEREBY DECLARED to be a public neces- sity, and the County Road Engineer is HEREBY ORDERED AND AUTHORIZED to report arid pro- ceed thereon as by law, provided and in accordance with WAC 136-18. ADOPTED this Ilth day of February , 1985 BOARD OF COUNTY CO�24ISSTONERS MASON COUNTY, WASHINGTON ATTEST: e 21-------J r Clerk of the Board r cc: Co. Commissioners Engineer JOURNAL: Publ. lt. , 2/21/85 (Bill Rd. Dept.) (CRP Form No. 1)