Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
FIR2024-00021 - FIR Plot / Site Plans - 8/25/2024
SCOPE OF NORK : KNIGHT FIRE PROTECTION, INC. TO INSTALL A NEW WET AUTOMATIC FIRE SPRINKLER SYSTEM THROUGHOUT THE NEW RESIDENTIAL STRUCTURE, PER NFPA 13R (AS SPECIFIED BY THE CENTRAL MASON FIRE CODE OFFICIAL). UNHEATED ATTIC AREA DESIGN CRITERIA : COMPOSITE WOOD JOIST CPVC SPRINKLER PIPE R-IIx2'-0' UNFACED BATT OR OTHER WOOD MEMBER CPVC PIPE INSULATION OVER THE SPRINKLER SYSTEM DESIGNED AND HYDRAULICALLY CALCULATED TO PROVIDE .05 GPM/SQ. FT. OVER THE FOUR (4) SPRINKLER PIPE- Y OTHERS MOST HYDRAULICALLY DEMANDING SPRINKLERS IN A SINGLE COMPARTMENT, PER NFPA 13R. CPVC PIPE SPRINKLERS IN ALL COMPARTMENTS SPACED AT 10xIV, MAXIMUM SI-0" FROM WALLS. STAND-OFF HANGER AND IN NISUL�.ATIONL OW RESTRAINER. INSULATION GENERAL NOTES : AFCON 514 OFFSET HANGER DOUBLE FASTENER TYCO FIG. 28 STRAP TYPE-SIDE MOUNT SPECIFICATIONS- �4" TNRU 2" CPVC PIPE BY OTHERS I. WATER SOURCE IS A 1,606 GALLON (MINIMUM) WATER STORAGE TANK SUPPLYING A UL LISTED FIRE PUMP (BY OTHERS). © 2. KFP START POINT TO BEGIN AT A Iy2" CONNECTION POINT, LOCATED (0" A.F.F. IN THE NW CORNER OF THE NEW ty CPVC SPRINKLER PIPE SEE PLAN FOR SIZE TRUSS CHORD STRUCTURE. 3. UNDERGROUND PIPING FROM THE NEW PUMP HOUSE TO THE NEW STRUCTURE TO BE Iy2" PEX OR EQUIVALENT (BY OTHERS). TRUSS 3. INSULATION TO BE INSTALLED IN A MANNER TO AVOID WATER FILLED PIPES FROM FREEZING (BY OTHERS). f—BOTTS BOTTOMBLOCKIIN � 4. ALL PIPING TO BE MAINTAINED AT A MINIMUM 400E PER NFPA 13. BOTTOM/ BLOCKING CEILING AIR SPADE � BLOCKING BUILDING INTERIOR 5. ALL SPRINKLERS AND PIPING TO BE INSTALLED ACCORDING TO THEIR LISTING. MANGER IDETA I LS INSULATION TENTING DETAIL . Mason Co Fire Marshal 'GALE: N.T.S. SCALE: N.T.S. TOR Approved with Conditions CONDITIONS: - An FDC shall be added (>2000 sq/ft) FDC may be 07/02/2024 2 :43 :38 PM a single 1 -1/211 connection 6.11 .1 rn - Underground shall be flushed prior to connection FIRE SPRINKLER 0 HYDRAULIC NODE - -- 10.2 RISER LEGEND CD AL shall be hydro'd per NFPA 13 10.2.2.1 QI ly2" SUPPLY FROM PUMP/STORAGE TANK �7 REFER TO HE NFPA 13R,NOTES - System19 EDITION - Pump shall meet NFPA 20 9.7.2 (BY OTHERS) KFP START POINT (lye" CONNECTION) I. MATERIAL TO BE NEW AND Q2 UL LISTED. 2. PIPING SHALL BE PER NFPA 13. -- - - Q Iy4" CHECK VALVE 3. EARTHQUAKE BRACING SHALL BE COORIDOR RESTROOM RESTROOM PER NFPA 13. ®ly4" BALL VALVE BOR 4. JOINING OF PIPE AND FITTINGS, THR , GROOV , PLAIN END, Q5 1y4' WATER FLOW INDICATOR SWITCH ANDEADED WELDED SHALLDBE PER NFPA _ - - ©HATER PRESSURE GAUGE 5. PIPE HANGERS AND METHOD OF a�-�R_ HANGING TO BE PER NFPA 13. FPI' MEETING - Q7 I" INSPECTORS TEST BALL VALVE b. PIPING DIMENSIONS ARE CENTER TO CENTER. BEDROOM ROOM ®I" SIGHT GLASS W/ y2" RESTRICTED ORIFICE 7. OWNER TO PROVIDE ADEQUATE v HEAT TO PREVENT WATER IN OR I�4 1�4 I/4 1 y4 - 12 1 y4 I y4 1 I I y4 I 1 y4 I O 0 MAIN DRAIN BALL VALVE \ PIPES FROM FREEZING IN AREAS PROTECTED BY A WET PIPE C 10 5-0 2-0 -0 5-I 10-II 5-I 3-I1 7 2-5 4-S 0 DRAIN LINE TO SAFE DISCHARGE LOCATION SPRINKLER SYSTEM.(MINIMUM 40•F �LG - U-�O REQUIRED) II ELECTRIC BELL (WIRED BY OTHERS) OO B. ALL WIRING OF ELECTRICAL DEVICES TO BE BY OTHERS. 9. PAINTING OF PIPE AND EQUIPMENT (IF REQUIRED) BY - OTHERS. co CID10. FURRING OF PIPE AND EQUIPMENT r U (IF REQUIRED) BY OTHERS. t` — I - LLJAPPROVALS QTY RISER DETAIL MASON COUNTY 2 _. -— 1 - - - -- - - FP I SCALE- 4/2"=11-0" OP4 ER/ARCI-IITECT COORIDOR 2 KNIGHT FIRE I BEDROOI TOTAL 5 co .o - rr1 SPRINKLERS USED THREAD K SPRINKLER ESCUTCHEON I221 I I I2H STML30L SPRINKLER MAKE t MODEL S.I.N. SIZE FACTOR FINI514 FlNISH TLC °TM RELIABLE RES.PEND-CONCEALED RA06I6 1121 4.9 BRASS WHITE 165' 29 m 0 HYDRAULIC REMOTE AREA: 111 COMMON AREA .05 GPM/SQ. FT. OVER THE MOST DEMANDING SPRINKLERS - IN A SINGLE COMPARTMENT, UP TO A MAXIMUM OF 4. TOTAL DEMAND OF 4 SPRINKLERS CALCULATED BEDROOM 53.5 GPM AT 19.02 PSI AT THE BASE OF RISER COMMON AREA TOTAL 29 I SYSTEM DEMAND NAt1TER FLOW INFO. N _ I REQUIRED PRESSURE 44.5 p.s.i. STATIC PRESSURE T.B.D. p.s.i. AVAILABLE PRESSURE T.B.D. p.s.i. RESIDUAL PRESSURE T.B.D. p.s.i. TOTAL DEMAND 53.5- g.p.m. FLOW T.B.D. g.p.m. HOSE N/A g.p.m. DATE TESTED XX/XX/XX N f DESIGN CRITERIA BEDROOM I I (V i } R rf r STANDARD _ NFPA 13R (2019) • 1 -s . , t HAZARD CLASSIFICATION: RESIDENTIAL BEDROOM � � ' P'�' l MAX SQ. FT. / HEAD 256 DENSITY .05 GPM/ 1024 SQ. FT. 2-0 3-7 _ ` y t �' . ! TYPE OF SYSTEM: WET QUALITY CONTROL BY: DATE Ax' �. •s r» 'r I+ MDATE BY REVISIONS Al/ I I 1 > k a�CID 5-0 COORIDOR 5-0 3-I ,, 'e II ® .' PROJECT rn m m *'� ti t* �` LOCATION � - •* � CONTRACT WITH: 1 1 '► ,� j r !" Central Mason Fire & EMS 122 W Franklin St. -5-2- 2-0 2-5 -- - _-- - - -- - - - - _ ' �. ., $ : 4- Shelton, WA 98584 - STORAGE Jobsite Supt: Keith Reitz Phone: 360-462-5020 I ` CONTRACT NAME: Central Mason Fire & EMS BEDROOM BEDROOM BEDROOM r,, t�,. !f►. :1 w Portable Building 5-0 0 r lam, 1741 E Pickering Rd. b Shelton, WA 98584 K � �' �- y. � .� • - lr.rararar.rartr:rararar.rararar.r.ra�rararar.r.r•rar:r.q WA8HINOTOMSTATE ; KNIGHT FIRE PROTECTION, INC. t ,- ■ DEC 3 I.24 CERTIFICATE OF COMPETENCY ■ 1 , � '• FIRE SPRINKLER SYSTEfl18 ; 9702 LATHROP INDUSTRIAL DR. SW r ■'' Mark A.Cantrell ■f __ -_ !t> ■ 6657-0415-B-H Level 2 ■ OLYMPIA, WA 98512-9188 -` -_-- ■ ■ FIRS SPRINKLER PLAN VICINITY MAP N i Knight Fire Protection, Inc. � (360) 786-8606 ® N ; KNIGHFP044LK ■ ■ LiCSNSE N0. KDTIGHFP044LK n_ I n ; 6/25/24 ; SCALE: 1/4 -I -0 ® N.T.5. - DESIGNER DATE JOB �O4 ER j Signature Date j Mark Cantrell 6-25-24 24 O O F ....................r.rar.rar.r.==11 O FILE NAME: 24-048 Central Maven Ere k EMS Portading \ � �D` � � h �, � C � � V� v