HomeMy WebLinkAboutBLD2020-00226 Cancelld Bulkhead - BLD Inspections - 12/5/2024 615 W.Alder St.Bldg 8,SHELTON,WA 98584
MASON COUNTY SHELTON:360-427-9670, EXT 352
COMMUNITY SERVICES
BELFAIR:360-275-4467,EXT 352
Buildir%Planning,Environmental Health,Community Health ELMA:360-482-5269, EXT 352
www.co.mason.wa.us
INSPECTION CARD AND CERTIFICATE OF OCCUPANCY"
To schedule an inspection call or visit http:/twww.co.mason.wa.us/community-services/bid-inspection.php
Permit Number BLD2020-00226 Date Issued 06/24/2020 Issued By 4_
Project Footing repair of existing 67.5'long bulkhead and extension of this existing bulkhead with 12'wing)hall.
Site Address 1260 N Potlatch Dr
Applicant JARVIS,JEFF
Contractor INTEGRATED NW CONSTRUCTION
Contractor Phone CARALYN-206.310.42
Primary Code UPC IBC, IRC, IFC,IEC, IMC,& Type
14 Cf),
BULKHEAD OR DOCK- Q ✓
Permit Type RESIDENTIAL Occupancy �
-APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS. t/
-DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS( �i
-THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION, FRONT OF THE PRE
-ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTE
-OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH
"THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL/
PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS Of
Public Works Access/Driveway Other
Health Septic Well
Deptartment
Planning Site Inspection
Department
Fire Marshall Fire Apparatus Access Fire Sprinkler
Auto Fire Alarm Hood and Duct
Other Final
Building
Department Building Official: Community Services Designee
Concrete Setbacks Slab
Footing Perimeter Point load Footing
Footing Interior Footing Decks/Porches
Foundation Stem Walls Other
Rough-In Groundwork Plumbing Framing
Groundwork Mechanical Plumbing
Groundwork Gas Pipe Mechanical
Gas Piping Shear Wall Nailing
Underfloor
Other
Insulation Slab Ceiling
Floor Vaulted Ceiling
Walls Vapor Barrier
Other
Wallboard Interior Wall Brace Panels Fire Walls
Nailing
Other
Final Building
Manufactured Setbacks Setup
Home
Concrete Foot/ Runners Final
Other
Mason County
Masan County Division of Community Development
615 W. Alder St. Bldg. 8
•Hcm� Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
E
26 BULKHEAD OR DOCK- RESIDENTIAL
PTION: FOOTING REPAIR OF EXISTING 67.5' LONG ISSUED: 06/24/2020
XTENSION OF THIS EXISTING BULKHEAD WITH 12'
EXPIRES: 12/21/2020
260 N POTLATCH DR HOODSPORT
PARCEL: 423185100112
APPLICANT: JARVIS, JEFF OWNER: JEFF JARVIS
1113 W MULLIGAN DR 1113 W MULLIGAN DR
ORO VALLEY, AZ 85755 ORO VALLEY, AZ 85755
206-920-4955
CONTRACTOR: INTEGRATED NW CONSTRUCTION
P O BOX 1008
HOODSPORT, WA 98548
CARALYN -206.310.42
GENERAL CONTRACTOR'S LICENSE: INTEGRATED NW CONSTRUCTION License: INTEGNC843J1
P O BOX 1008 Expires: 04/21/2021
HOODSPORT, WA 98548
CARALYN -206.310.42
VALUATIONS: FEES: Paid Due
Project Valuation (BID, 42500.00 $42,500.00 Plan Check Fee $402.51 $0.00
ESTIMATION..) State Fee-Residential $6.50 $0.00
Planning Review Fee $240.00 $0.00
Building Permit Fee $619.24 $0.00
Technology Surcharge $20.44 $0.00
Total: $42,500.00 Totals : $1,288.69 $0.00
REQUIRED INSPECTIONS
Footing Inspection Shearwall Inspection
Foundation Wall-Pre-Pour Inspection BLD-Final Inspection
CONDITIONS
Printed by.Julia Kerkes on 06/24/2020 09.56 AM
Page 1 of 4
Mason County
Mason County - Division of Community Development
`l1 615 W. Alder St. Bldg. 8
Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
BULKHEAD OR DOCK- RESIDENTIAL BLD2020-00226
All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building
Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration.
Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No
more than one extension may be granted.
* All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and
plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee
schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections
being performed or approvals granted.
* Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site
plan. Please check your"Approved Site Plan" to ensure these structures are shown and meet the setback conditions listed.
* All property lines shall be clearly identified at the time of foundation inspection.
* The plan review check list and corrections are part of the approved plans and must remain attached. It is the responsibility
of the applicant, owner or contractor to make the required corrections indicated on the plans. Once the plans are marked
"APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is
responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or
removal of approved documents will result in failure of required building inspections.
* The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the
approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule,
minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being
performed or approvals granted.
* All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted
classification. Any non-approved change of use or occupancy would result in permit revocation.
* Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the
structure.
* When parcel development requires direct access to county road(s), a Road Access Permit or Approval must be granted by
the Mason County Department of Public Works. For more information contact Public Works, at (360)427-9670, ext. 450 or
100 W Public Works Dr. Shelton. The building permit will not be finaled until the permit holder can show proof that the
access permit from Public Works has been finaled and approved.
* All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor
increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way.
* All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or
any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
* Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and
MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either
private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an
existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance
and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting
from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any
construction which is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that
office to review future planned work which may affect your project.
* Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
Printed by:Julia Kerkes on:06/24/2020 09:56 AM
Page 2 of 4
Mason County
Mason County - Division of Community Development
615 W. Alder St. Bldg. 8
� 1WI Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
BULKHEAD OR DOCK- RESIDENTIAL BLD2020-00226
Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance
with Mason County Title 14.28 and 14.17.
Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather,
garage floor slabs and other vertical concrete work exposed to the weather shall have a minimum compressive strength of
3000 psi (IRC Table R402.2).
Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly
corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of
pressure treated material.
CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND THE ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All
construction must be in conformance with the international codes as amended and adopted by Mason County. Any
corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting
additional inspections.
All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
. OWNER / BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit
revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or
contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained
permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The
owner or authorized agent represents that the information provided is accurate and grants employees of Mason County
access to the above described property and structure(s) for review and inspection. This permit/application becomes null &
void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of
180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION, INACTIVITY OF THIS PERMIT
APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION.
Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to
the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of
the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In
addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour) will be charged and shall be collected by the
Building Department prior to any further inspections being performed or approvals granted.
All other necessary permits from Mason County, Washington State and/or Federal Agencies that are required for this
proposed development and construction must be obtained PRIOR TO SAME DEVELOPMENT AND CONSTRUCTION.
Mitigation as outlined in the Biological Evaluation prepared by Kim Schaumburg and dated February 20, 2020 shall be
implemented on site. A three year monitoring period shall be required with reports submitted to the permit assistance center
or by email. First report is due after planting. with each report due a year after the submittal of the first report. Report shall
include simple site plan with location of plantings, condition of plantings, habitat function, and pictures with scale reference.
All construction and demolition debris must be removed from the beach after project completion. Proper disposal of
construction debris must be on land in such a manner that debris cannot enter or cause water quality degradation of State
waters.
• Water quality is not to be degraded to the detriment of the aquatic environment as a result of this project.
" All state and federal approvals, requirements and/or permitting must be obtained/met by applicant prior to work
commencing on site.
Printed by Julia Kerkes on:06/24/2020 09 56 AM Page 3 of 4
Mason County
I
Mason County - Division of Community Development
615 W. Alder St. Bldg. 8
Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
BULKHEAD OR DOCK- RESIDENTIAL BLD2020-00226
The approval of this project is subject to the recommendations and specifications outlined in the attached geotechnical
report or assessment. All applicable recommendations and specifications shall be applied to the development on this site.
Any deviation requires stamped written approval from the registered design professional responsible for the
report/assessment, and may require special inspection by same. Structures and / or land modifications (grading, cuts, fills,
etc.) required in the geotechnical report/assessment, may require a separate permit. The geotechnical report/assessment
shall remain attached to the approved building plans.
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of any other state/local law regulating construction or the performance of construction.
Issued By: /
Contractor or Authorized Agent: J` Date: 7/1,4 4aPrinted by:Julia Kerkes on:06/24/2020 09:56 AM
Page 4 of 4