HomeMy WebLinkAboutCOM2023-00101 Industrial - COM Inspections - 11/26/2024 ik, 615 W.Alder St.Bldg 8,SHELTON,WA 98584
I if MASON COUNTY SHELTON:360-427-9670,EXT 352
COMMUNITY SERVICES
BELFAIR:360-275-4467,EXT 352
Buidin%Plann",Environmental HeaHh Community Health
� ELMA:360-482-5269,EXT 352
www.co.mason.wa.us
INSPECTION CARD AND CERTIFICATE OF OCCUPANCY**
To schedule an inspection call or visit http:/hvww.co.mason.wa.us/community-services/bid-inspectio//n.php
Permit Number COM2023-00101 Date Issued 02/23/2024 Issued By
Project CONSTRUCTION OF NEW INDUSTRIAL BLDG WITH OFFICES
Site Address 7431 W SHELTON MATLOCK RD
Applicant LUND MACHINE RENTAL LLC
Contractor
Contractor Phone
Primary Code UPC IBC,IRC,IFC,IEC,IMC,& Type
Permit Type NEW COMMERCIAL PERMIT Occupancy
-APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS.
-DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED.
-THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION,FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY.
-ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION.
-OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION.
**THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED."
PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET
Public Works Access/Driveway Other
Health Septic Well
Deptartment
Planning Site Inspection
Department
Fire Marshall Fire Apparatus Access Fire Sprinkler C f
Auto Fire Alarm Hood and Duct
Other Final
Building Building Official: Community Services Designee
Department
uo WGQ Concrete Setbacks —Z -2 G Slab
noting Perimeter Point load Footing
r A,-Nock T*4TS C)'4 Footing Interior Footing Decks/Porches
Foundation Stem Walls Other fce
Rough-In Groundwork Plumbing / -Z -Z DEL Framing
Groundwork Mechanical Plumbing
Groundwork Gas Pipe Mechanical
Gas Piping Shear Wall Nailing
Underfloor
Other
Insulation Slab Ceiling
Floor Vaulted Ceiling
Walls Vapor Barrier
Other
Wallboard Interior Wall Brace Panels Fire Walls
Nailing
Other
Final Building
Manufactured Setbacks Setup
Home
Concrete Foot/Runners Final
Other
��'ti�1ce -F4.1 0 3-2I Z>W—
INSPECTION RESULTS Pagel
MASON COUNTY Department of Community Development
COMMUNITY DEVELOPMENT 615 W Alder St, Shelton, WA 98584
Permit Assistance Centei,Building,Planning (360) 427-9670 ext. 352
Application # COM2023-00101 Application Type NEW COMMERCIAL PERMIT Owner LUND MACHINE RENTAL
LLC
Parcel # 420181400030 Site Address 7431 W SHELTON MATLOCK RD SHE, WA
98584
Inspector Inspection Type Date Status Comments
10-3-24 DEC
Drew Carlson FOOTING INSPECTION 10/03/2024 FAIL FOOTING LAYOUT FOR OFFICE PORTION IS INCORRECT. CONTRACTOR IS IN
THE PROCESS OF RELOCATING FOOTINGS AND WILL CALL FOR
REINSPECTION.
f f
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
FBLDG
3-00101 NEW COMMERCIAL PERMIT
ESCRIPTION: CONSTRUCTION OF NEW INDUSTRIAL ISSUED: 02/23/2024
OFFICES
ESS: 7431 W SHELTON MATLOCK RD SHE EXPIRES: 02/23/2029
PARCEL: 420181400030
APPLICANT: LUND MACHINE RENTAL LLC OWNER: LUND MACHINE RENTAL LLC
110 W METZLER MILL RD 110 W METZLER MILL RD
SHELTON,WA 98584 SHELTON,WA 98584
360-432-0310
VALUATIONS: FEES: Paid Due
S-1 IIA Storage, moderate 5551.00 $547,439.62 BLD-COM ENERGY REVIEW $80.00 $0.00
hazard IFC Plan Check Fee $1,235.80 $0.00
Plan Check Fee $2,471.60 $0.00
Pre-application meeting - Major $255.00 $0.00
EH Plan Review
Building Permit Fee $3,802.46 $0.00
Technology Surcharge $133.78 $0.00
State Fee-Commercial $25.00 $0.00
Planning Commercial Review $380.00 $0.00
Fee
Plumbing Fees $124.00 $0.00
Mechanical Base Fee $30.00 $0.00
Mechanical Fees $236.00 $0.00
Plumbing Base Fee $25.00 $0.00
Total: $547,439.62 Totals : $8,798.64 $0.00
FIXTURES
QW Mechanical Fixtures (sty Plumbing Fixtures
1.0000 Air Handlers- Miscellaneous 1.0000 Number of Hose Bibs
2.0000 Heat Pump(s) 1.0000 Number of Dishwashers
3.0000 Spot Vent Fan(s) 1.0000 Number of Kitchen Sinks
Printed by:Anna Schaffran on:02/23/2024 08:54 AM
Page 1 of 4
Mason County
Mason County - Division of Community Development
615 W.Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncoun"a.gov
NEW COMMERCIAL PERMIT COM2023-00101
(sty Mechanical Fixtures (Oty Plumbing_Fixtures
3.0000 For each air-handling unit to and including 10,000 1.0000 Number of Water Heaters and or Vent
cubic feet per minute (cfm) (4719L/s), including 3.0000 Bathroom Sink
attached ducts.
3.0000 Number of Toilets
8.0000 Other
4.0000 For each plumbing fixture on one trap or a set of
fixtures on one trap (including water, drainage
piping and associated backflow protection)
REQUIRED INSPECTIONS
Planning Req. for More Info Rough- Plumbing Inspection
Setback Inspection Mechanical Inspection
Footing Inspection Insulation Inspection
Foundation Wall-Pre-Pour Inspection Connection has been verified by Health or Utilities
Shearwall Inspection KNOX BOX VERIFICATION
Framing Inspection BLD-Final Inspection
CONDITIONS
When parcel development requires direct access to state road(s), a Road Access Permit or Approval must be granted and
approved by the Washington State Department of Transportation. For more information contact Washington State
Department of Transportation, at(206)357-2620, ext. 630.
" Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly
corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of
pressure treated material.
When parcel development requires direct access to county road(s), a Road Access Permit or Approval must be granted by
the Mason County Department of Public Works. For any construction which is proposed to be located within 25' of a Mason
County road right of way, it is suggested to contact that office to review future planned work which may affect your project.
For more information contact Public Works, at(360)427-9670, ext. 450 or 100 W Public Works Dr. Shelton. The building
permit will not be finaled until the permit holder can show proof that the access permit from Public Works has been finaled
and approved.
• All property lines shall be clearly identified at the time of foundation inspection.
" CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND THE ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All
construction must be in conformance with the international codes as amended and adopted by Mason County. Any
corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting
additional inspections.
* The foundation/footing must be placed on undisturbed, firm-native soil. Proper frost depth shall be observed below grade
in undisturbed soils.
Printed by:Anna Sctiaffran on:02/23/2024 08:54 AM
Page 2 of 4
Mason County
Mason County - Division of Community Development
615 W.Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
NEW COMMERCIAL PERMIT COM2023-00101
* Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
* Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and
MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either
private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an
existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance
contact the Mason County Public Works Department prior to construction at Ext 450
* Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance
with Mason County Title 14.28 and 14.17.
* All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
* All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted
classification. Any non-approved change of use or occupancy would result in permit revocation.
* All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or
any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
* The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the
approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule,
minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being
performed or approvals granted.
* All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and
plans are not available on site, then approval will not be granted. In addition, a re-inspection fee(refer to current fee
schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections
being performed or approvals granted.
* The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more
than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards
for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to
another fire apparatus access road which connects to a county maintained public road.
* By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your
"Approved Site Plan"to ensure these structures meet the setback conditions listed.
* All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor
increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way.
* All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building
Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration.
Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No
more than one extension may be granted.
* Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the
structure.
* Requires landscape installation verification before final C of O
Printed by:Anna Schaffran on:02/23/2024 08:54 AM
Page 3 of 4
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
NEW COMMERCIAL PERMIT COM2023-00101
" Applicant/Owner assumes all responsibility if On-site Sewage Components are encumbered.
A.) Drainfield/Reserve requires a 1Oft setback from all footing/foundations.
B.)Septic tank(s) requires 5ft setback from all footing/foundations.
C.)No foundation/ Perimeter Drains within 30ft, down gradient of Drainfield/Reserve area.
D.) No Cut Bank(s)(greater than 5ft and over 45 degrees)within 50ft, down gradient of Drainfield/ Reserve area.
* Construction completion report and final inspection performed for Group B Water System before final occupancy.
* 1976 septic system has failed, is no longer in use, and needs to be properly decomissioned. Asbuilt required showing
decommissioning.
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of any other state/local law regulating construction or the performance of construction.
Issued By: 444 ep t. ' -,eL
Contractor or Authorized Agent: Date: Z Z 2' -0
Printed by:Anna Schaffran on:02/23/2024 08:54 AM
Page 4 of 4