Purpose of checklist.-
Governmental agencies use this checklist to help determine whether the environmental impacts of your
proposal are significant.This information is also helpful to determine if available avoidance, minimization
or compensatory mitigation measures will address the probable significant impacts or if an environmental
impact statement will be prepared to further analyze the proposal.
Instructions for applicants:
This environmental checklist asks you to describe some basic information about your proposal. Please
answer each question accurately and carefully,to the best of your knowledge. You may need to consult
with an agency specialist or private consultant for some questions. You may use "not applicable" or
"does not apply"only when you can explain why it does not apply and not when the answer is unknown.
You may also attach or incorporate by reference additional studies reports. Complete and accurate
answers to these questions often avoid delays with the SEPA process as well as later in the decision-
making process.
The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of
time or on different parcels of land. Attach any additional information that will help describe your proposal
or its environmental effects. The agency to which you submit this checklist may ask you to explain your
answers or provide additional information reasonably related to determining if there may be significant
adverse impact.
Instructions for Lead Agencies:
Please adjust the format of this template as needed. Additional information may be necessary to
evaluate the existing environment, all interrelated aspects of the proposal and an analysis of adverse
impacts. The checklist is considered the first but not necessarily the only source of information needed to
make an adequate threshold determination. Once a threshold determination is made,the lead agency is
responsible for the completeness and accuracy of the checklist and other supporting documents.
A. BACKGROUND
1. Name of proposed project, if applicable: Mason Lake (US-WA-7014)
2. Name of applicant: VB BTS II
3. Address and phone number of applicant and contact person:
Johnnie Whitfield
750 Park of Commerce Drive, Suite 200
Boca Raton, Florida 33487
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 1 of 14
4. Date checklist prepared: 12/1/2022
5. Agency requesting checklist: Mason County
6. Proposed timing or schedule (including phasing, if applicable):
Late 2023, anticipated to be a 60-day project.
7. Do you have any plans for future additions,expansion, or further activity related to or connected with
this proposal? If yes, explain.
No additional or expansions are proposed at this time.
8. List any environmental information you know about that has been prepared,or will be prepared,
directly related to this proposal.
Cultural Resources Assessment
FCC National Environmental Policy Act(NEPA)
Phase I Environmental Site Assessment
9. Do you know whether applications are pending for governmental approvals of other proposals
directly affecting the property covered by your proposal? If yes, explain.
None known.
10. List any government approvals or permits that will be needed for your proposal, if known.
Mason County Zoning & Planning
11. Give brief, complete description of your proposal, including the proposed uses and the size of
the project and site. There are several questions later in this checklist that ask you to describe
certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead
agencies may modify this form to include additional specific information on project description.)
VB BTS II proposes the construction of a 150-ft AGL (160-ft AGL with appurtenances)
monopole communications tower, an associated 100-ft x 100-ft tower compound lease area
and proposed 15-ft wide by approximately 485-ft long accesslutility easement to be located
at 110 E. Tintagel Place, in the City of Shelton, within Mason County, Washington.The
project is located within a portion of NE '/4 SE '/4 of Section 28, Township 21N, Range 3W,
Willamette P.M. Shelton, Washington. This project is located on Tax Lot# 321280000000
identified by the Mason County Tax Assessor's Office.
12. Location of the proposal. Give sufficient information for a person to understand the precise location
of your proposed project, including a street address, if any, and section, township, and range, if
known. If a proposal would occur over a range of area, provide the range or boundaries of the
site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably
available. While you should submit any plans required by the agency, you are not required to
duplicate maps or detailed plans submitted with any permit applications related to this checklist.
Parcel#(s): 321280000000
Address: 110 E. Tintagel Place Shelton, WA
Legal Description: Section 28, Township 21 North, Range 3 West,W.M.
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 2 of 14
Twp/Range/Section and/or GPS location:
Within a portion of NE '/4 SE '/4 of Section 28, Township 21N, Range 3W, Willamette P.M.
Shelton, Washington.
B. ENVIRONMENTAL ELEMENTS
1. Earth
a. General description of the site
(Circle one): Flat, rolling, hilly, steep slopes, mountainous, other:
Proposed tower compound area is generally flat sloping to the northwest
b. What is the steepest slope on the site (approximate percent slope)?
-2% slope within the leasehold area.
c. What general types of soils are found on the site(for example, clay, sand, gravel, peat, muck)?
If you know the classification of agricultural soils, specify them and note any agricultural land of
long-term commercial significance and whether the proposal results in removing any of these
soils.
According to the USDA Web Soil Survey of Mason County, WA, the soil of the subject
property is identified as Alderwood gravelly sandy loam, 8 to 15% slopes. Alderwood
gravelly sandy loam is described as moderately well drained, found on hills or ridges,
and is formed from glacial drift and/or glacial outwash over dense glaciomarine deposits.
A typical soil profile consists of gravelly sandy loam from 0 to 7-inches and very gravelly
sandy loam from 7 to 59-inches below ground surface (BGS).
d. Are there surface indications or history of unstable soils in the immediate vicinity? If so,
describe.
None known or observed.
e. Describe the purpose,type,total area, and approximate quantities and total affected area of any
filling, excavation, and grading proposed. Indicate source of fill.
Proposed project requires minimal amount of cut, and spoils will be deposited on-site. A
proposed 150-ft AGL (160-ft AGL with appurtenances) monopole communication tower,
within a 100-ft x 100-ft fenced tower compound and an associated 20-ft x 12-ft gravel
turnaround area. The compound will be accessed by a proposed approximately 15-ft x
-435-ft access & utility easement. These areas are herein referred to as the direct area of
potential effect(APE) and total approximately-16,765-ft' (0.38-acres).
Weed-free gravel will be brought in from a local landscape company or gravel supplier
(TBD).
f. Could erosion occur as a result of clearing,construction,or use? If so, generally describe.
Yes, but erosion will be controlled with proper best management practices (BMPs),
including but not limited to silt fencing and straw wattles.
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 3 of 14
g. About what percent of the site will be covered with impervious surfaces after project
construction (for example, asphalt or buildings)?
Less than 1% of parent property.
<10% of tower compound lease area.
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any:
Construction BMPs including but not limited to sift fencing and straw wattles.
2. Air
a. What types of emissions to the air would result from the proposal during construction,operation,
and maintenance when the project is completed? If any, generally describe and give
approximate quantities if known.
During construction, equipment/vehicle emissions and dust are expected.
Construction should occur over the course of approximately 8-weeks. Upon
completion, the facility will be accessed approximately 1 to 2 times every 3 months.
b. Are there any off-site sources of emissions or odor that may affect your proposal? If so,
generally describe.
No.
c. Proposed measures to reduce or control emissions or other impacts to air, if any:
None.
3. Water
a. Surface Water:
1) Is there any surface water body on or in the immediate vicinity of the site (including year-
round and seasonal streams, saltwater, lakes, ponds,wetlands)? If yes, describe type and
provide names. If appropriate, state what stream or river it flows into.
None known within the immediate vicinity of the proposed action areas. The nearest
identified surface water feature is Cranberry Lake located approximately 1,600-ft to
the north, and Lake Limerick located approximately 2,500-ft to the northeast.
2) Will the project require any work over, in, or adjacent to(within 200 feet)the described
waters? If yes, please describe and attach available plans.
No. Runoff will be controlled with BMPs during construction.
3) Estimate the amount of fill and dredge material that would be placed in or removed from
surface water or wetlands and indicate the area of the site that would be affected.
Indicate the source of fill material.
N/A
4) Will the proposal require surface water withdrawals or diversions? Give general description,
purpose, and approximate quantities if known.
No.
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 4 of 14
5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan.
No.
6) Does the proposal involve any discharges of waste materials to surface waters? If so,
describe the type of waste and anticipated volume of discharge.
No.
b. Ground Water:
1) Will groundwater be withdrawn from a well for drinking water or other purposes? If so,give a
general description of the well, proposed uses and approximate quantities withdrawn from
the well.Will water be discharged to groundwater? Give general description, purpose, and
approximate quantities if known.
No.
2) Describe waste material that will be discharged into the ground from septic tanks or other
sources, if any(for example: Domestic sewage; industrial, containing the following
chemicals. . . ; agricultural; etc.). Describe the general size of the system, the number of
such systems,the number of houses to be served(if applicable), or the number of animals or
humans the system(s) are expected to serve.
N/A
c. Water runoff(including stormwater):
1) Describe the source of runoff(including storm water)and method of collection and disposal,
if any(include quantities, if known). Where will this water flow? Will this water flow into other
waters? If so, describe.
Stormwater runoff will flow off-site and presumably flow local topography to the
northwest. Runoff will eventually infiltrate the soil and/or will flow into Cranberry
Lake.
2) Could waste materials enter ground or surface waters? If so, generally describe.
No.
3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site?If so,
describe.
No.
d. Proposed measures to reduce or control surface, ground,and runoff water,and drainage pattern
impacts, if any:
BMPs including but not limited to silt fencing and straw wattles to be utilized during
construction.
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 5 of 14
4. Plants
a. Check the types of vegetation found on the site:
X deciduous tree: alder, maple, aspen, other
X evergreen tree: fir, cedar, pine, other
X Shrubs
X Grass
pasture
crop or grain
orchards, vineyards or other permanent crops
wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other
water plants: water lily, eelgrass, milfoil, other
other types of vegetation
b. What kind and amount of vegetation will be removed or altered?
The proposed tower compound lease area and associated easement areas were
observed to be occupied by a clearcut area with minimal regrowth occurring.
c. List threatened and endangered species known to be on or near the site.
Review of the USFWS — Mason County — Official Species List indicated the possible
presence of one (1) federally endangered terrestrial species: Taylor's checkerspot
(Euphydryas Editha taylori); three (3) federally threatened terrestrial species: marbled
murrelet (Brachyramphus marmoratus), streaked horned lark (Eremophila alpestris
strigata), and yellow-billed cuckoo (Coccyzus americanus); and one (1) federal candidate
terrestrial species: monarch butterfly (Danaus plexippus). Additionally, the list also
indicated the possible presence of one (1) federally threatened aquatic species: bull trout
(Salvelinus confluentus); however, due to the distance from aquatic resources, it is the
opinion of TEP that the proposed action will have no effect on the aforementioned
aquatic species. The site inspection performed on August 17, 2022 consisted of a
pedestrian inspection of the proposed action area and immediate vicinity for indications
of the presence of federally listed species and/or their critical habitats and
preferred/suitable habitats, as described by the USFWS. According to the USFWS —Trust
Resources List, there are no officially designated critical habitats on, or in the vicinity of
the action area.
TEP also utilized the Washington Natural Heritage Program's Element Occurrences
online map and determined that no (0) state-listed species occur within 1-mile of the
proposed action area. Further, TEP utilized the WA DFW's Priority Habitats and Species
web mapper and found no (0) occurrences for state-listed species within 0.5-miles of the
proposed project area.
d. Proposed landscaping, use of native plants, or other measures to preserve or enhance
vegetation on the site, if any:
None proposed.
e. List all noxious weeds and invasive species known to be on or near the site.
None were noted within the vicinity of the proposed action areas during the site inspection
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 6 of 14
J
completed by TEP.
5. Animals
a. List any birds and other animals which have been observed on or near the site or are known to
be on or near the site. Examples include: None were observed.
birds: hawk, heron, eagle, songbirds, other:
mammals: deer, bear, elk, beaver, other:
fish: bass, salmon, trout, herring, shellfish, other:
b. List any threatened and endangered species known to be on or near the site.
None were observed on or within the immediate vicinity of the proposed action area.The USFWS
Mason County Official Species List for the proposed project indicated the possible presence of
one (1)federally endangered terrestrial species: Taylor's checkerspot (Euphydryas
Editha taylori); three (3)federally threatened terrestrial species: marbled murrelet
(Brachyramphus marmoratus), streaked horned lark (Eremophila alpestris strigata), and
yellow-billed cuckoo (Coccyzus americanus); and one (1) federal candidate terrestrial
species: monarch butterfly (Danaus plexippus). Additionally, the list also indicated the
possible presence of one (1) federally threatened aquatic species: bull trout(Salvelinus
confluentus); however, due to the distance from aquatic resources, it is the opinion of
TEP that the proposed action will have no effect on the aforementioned aquatic species.
c. Is the site part of a migration route? If so, explain.
No migration routes are known to occur in or within the immediate vicinity of the
proposed project.
d. Proposed measures to preserve or enhance wildlife, if any:
The proposed tower will be under 200-ft tall,will be unlit,will not utilize guy-wires,and will not be
located within a wetland,on a mountaintop,or in any other area known to have frequent foggy
conditions.
e. List any invasive animal species known to be on or near the site.
None were noted within the vicinity of the proposed action areas during the site inspection
completed by TEP.
6. Energy and natural resources
a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the
completed project's energy needs? Describe whether it will be used for heating, manufacturing,
etc.
Electric.
b. Would your project affect the potential use of solar energy by adjacent properties?
If so, generally describe.
No.
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 7 of 14
c. What kinds of energy conservation features are included in the plans of this proposal?
List other proposed measures to reduce or control energy impacts, if any:
None.
7. Environmental health
a. Are there any environmental health hazards, including exposure to toxic chemicals, risk
of fire and explosion, spill, or hazardous waste,that could occur as a result of this proposal.
If so, describe. None known.
1) Describe any known or possible contamination at the site from present or past uses.
None.
2) Describe existing hazardous chemicals/conditions that might affect project development and
design. This includes underground hazardous liquid and gas transmission pipelines located
within the project area and in the vicinity.
None.
3) Describe any toxic or hazardous chemicals that might be stored, used, or produced during
the project's development or construction, or at any time during the operating life of the
project.
Lead acid batteries may be utilized within antenna equipment shelters within fence
compound.
4) Describe special emergency services that might be required.
None.
5) Proposed measures to reduce or control environmental health hazards, if any:
None.
b. Noise
1) What types of noise exist in the area which may affect your project(for example:
traffic, equipment, operation, other)?
None.
2) What types and levels of noise would be created by or associated with the project on a
short-term or a long-term basis(for example: traffic,construction, operation, other)? Indi-
cate what hours noise would come from the site.
Short term noise during construction phase (during regular business hours).
Intermittent noise will originate from operating of ground equipment(all hours).
3) Proposed measures to reduce or control noise impacts, if any:
SEPA Environmental checklist(WAC 197.11-960)(MC version-non project portion omitted): 2016 Page 8 of 14
None.
8. Land and shoreline use
a. What is the current use of the site and adjacent properties?Will the proposal affect current land
uses on nearby or adjacent properties? If so, describe.
The parent property was primarily occupied by forested and cleared undeveloped
land. The adjoining properties to the north, south, and west were primarily occupied
by undeveloped forested land and the adjoining properties to the east primarily
occupied by low-density residential land use.
b. Has the project site been used as working farmlands or working forest lands? If so, describe.
No.
How much agricultural or forest land of long-term commercial significance will be converted to
other uses as a result of the proposal, if any?
None.
If resource lands have not been designated, how many acres in farmland or forest land tax
status will be converted to nonfarm or nonforest use?
None.
1) Will the proposal affect or be affected by surrounding working farm or forest land normal
business operations, such as oversize equipment access,the application of pesticides,
tilling, and harvesting? If so, how:
No.
c. Describe any structures on the site.
None existing within the proposed tower lease area or easement. There is one residential
structure east of the proposed action area.
d. Will any structures be demolished? If so,what?
No.
e. What is the current zoning classification of the site?
Rural Residential 20 Acres
f. What is the current comprehensive plan designation of the site?
Rural Residential 20 Acres - Residential zoning districts in rural areas of the County allow
for housing to acreage ratios varying from one home for every two and a half acres to
one home for every twenty acres. These districts also permit small hobby farms and
cottage industries enabling people to work from home, as well as group homes,
churches and community centers to meet the needs of rural lifestyles. With the approval
of special permits, schools and day care centers can also be developed, further
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 9 of 14
accommodating people living outside the urban areas and alleviating the need for
commuting for those families without the resources to do so. There are also multi-family
housing districts in the rural areas that provide for duplexes, multifamily housing
complexes and mobile home parks. This type of housing can be a more affordable option
for low-income families.
g. If applicable,what is the current shoreline master program designation of the site?
None.
h. Has any part of the site been classified as a critical area by the city or county? If so, specify.
No.
i. Approximately how many people would reside or work in the completed project?
None. Unmanned facility with 1-2 visits every three months.
j. Approximately how many people would the completed project displace?
None.
k. Proposed measures to avoid or reduce displacement impacts, if any:
P p p Y
N/A
L. Proposed measures to ensure the proposal is compatible with existing and projected land
uses and plans, if any:
Project will be submitted to Mason County Planning &Zoning for applicable review
and permits.
I. Proposed measures to ensure the proposal is compatible with nearby agricultural and forest
lands of long-term commercial significance, if any:
Project will be submitted to Mason County Planning &Zoning for applicable review
and permits. At the time of inspection, the proposed area was observed to occupied
by cleared undeveloped land. Proposed telecommunications tower facility is
anticipated to have no impact to agricultural and/or forested lands of long-term
commercial significance.
9. Housing
a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-
income housing.
None.
b. Approximately how many units, if any,would be eliminated?Indicate whether high,
middle, or low-income housing.
None.
c. Proposed measures to reduce or control housing impacts, if any:
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 10 of 14
1
N/A
10. Aesthetics
a. What is the tallest height of any proposed structure(s), not including antennas;what is
the principal exterior building material(s) proposed?
A proposed 150-ft AGL (160-ft AGL with appurtenances) monopole
communication tower. Tower will be comprised of galvanized steel.
b. What views in the immediate vicinity would be altered or obstructed?
The assessment concluded that the proposed 150-ft AGL (160-ft AGL with appurtenances)
monopole communications tower will be visible from those areas located inside the
assessed 0.5-mile area; however, the proposed tower will not be visible from those areas
located outside and/or just within the assessed 0.5-mile radius that are obstructed by the
existing topography surrounding the parent property to the north, south, east, and west.
c. Proposed measures to reduce or control aesthetic impacts, if any:
The proposed monopole tower will be less than 200-ft AGL in height and will be an unlit
structure. Therefore, the proposed structure is anticipated to be visibly subordinate to the
landscape from the majority of the public accessible areas within the aforementioned
visual APE and will not adversely impact surrounding public viewsheds.
11. Light and glare
a. What type of light or glare will the proposal produce? What time of day would it mainly
occur?
The tower will be unlit. The galvanized steel tower will naturally "weather" and
is not anticipated to be a source of glare.
b. Could light or glare from the finished project be a safety hazard or interfere with views?
No.
c. What existing off-site sources of light or glare may affect your proposal?
N/A
d. Proposed measures to reduce or control light and glare impacts, if any
The proposed tower is an unlit structure.
12. Recreation
a. What designated and informal recreational opportunities are in the immediate vicinity?
None within the immediate vicinity of the proposed action area. The closest informal
recreational opportunity is the Lake Limerick Country Club approximately 0.65-miles
northeast from the proposed action area.
b. Would the proposed project displace any existing recreational uses? If so, describe.
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 11 of 14
No.
c. Proposed measures to reduce or control impacts on recreation, including recreation
opportunities to be provided by the project or applicant, if any:
N/A
13. Historic and cultural preservation
a. Are there any buildings, structures, or sites, located on or near the site that are over 45 years old
listed in or eligible for listing in national, state, or local preservation registers located on or near
the site? If so, specifically describe.
According to the Washington's State Historic Preservation Office's online database no
(0) previously recorded historic properties were identified within the direct APE.
b. Are there any landmarks, features, or other evidence of Indian or historic use or occupation?
This may include human burials or old cemeteries.Are there any material evidence, artifacts, or
areas of cultural importance on or near the site? Please list any professional studies conducted
at the site to identify such resources.
According to the Washington's State Historic Preservation Office's online database no
(0) archaeological sites determined listed or eligible for the NRHP were identified within
the direct or visual APEs.
c. Describe the methods used to assess the potential impacts to cultural and historic resources on
or near the project site. Examples include consultation with tribes and the department of
archeology and historic preservation, archaeological surveys, historic maps, GIS data, etc.
TEP performed a search on the Washington's State Historic Preservation Office's online
database on August 12, 2022 to determine whether any historic properties were located
within a 0.5-mile radius. No (0) previously recorded historic properties were identified
within the direct APE. No (0) archaeological sites determined listed or eligible for the
NRHP were identified within the direct or visual APEs. No (0) artifacts, features, or other
signs of historic or prehistoric cultural activities were observed during the pedestrian
inspection or shovel testing. TEP has sent correspondence to all applicable tribes with
known ancestral and/or aboriginal rights to Mason County, WA; as per FCC Tower
Construction Notification System (TCNS).
d. Proposed measures to avoid, minimize,or compensate for loss, changes to, and disturbance to
resources. Please include plans for the above and any permits that may be required.
None known. No (0) previously recorded historic properties were identified within the
direct APE. No (0) archaeological sites determined listed or eligible for the NRHP were
identified within the direct or visual APEs. TEP has sent correspondence to all
applicable tribes with known ancestral and/or aboriginal rights to Mason County,WA; as
per FCC TCNS.
14. Transportation
a. Identify public streets and highways serving the site or affected geographic area and describe
proposed access to the existing street system. Show on site plans, if any.
SEPA Environmental checklist(WAC 197.11-960)(MC version-non project portion omitted): 2016 Page 12 of 14
Access to the tower compound area is accessed via a proposed access and utility
easement approximately 15-ft x --435-ft west from East Tintagel Place.
b. Is the site or affected geographic area currently served by public transit? If so, generally
describe. If not, what is the approximate distance to the nearest transit stop?
None known.
c. How many additional parking spaces would the completed project or non-project proposal have?
How many would the project or proposal eliminate?
None. A proposed 100-ft x 100-ft fenced tower compound and an associated 20-ft x 12-ft
gravel turnaround area.
d. Will the proposal require any new or improvements to existing roads, streets, pedestrian, bicycle
or state transportation facilities, not including driveways? If so, generally describe (indicate
whether public or private).
The proposal will require an access and utility easement with an associated 20-ft x 12-ft
gravel turnaround area.
e. Will the project or proposal use(or occur in the immediate vicinity of)water, rail, or air
transportation? If so, generally describe.
No.
f. How many vehicular trips per day would be generated by the completed project or proposal? If
known, indicate when peak volumes would occur and what percentage of the volume would be
trucks (such as commercial and nonpassenger vehicles). What data or transportation models
were used to make these estimates?
After construction is completed, vehicles will access the site 1 to 2 times every three
months.
g. Will the proposal interfere with, affect or be affected by the movement of agricultural and forest
products on roads or streets in the area? If so, generally describe.
No.
h. Proposed measures to reduce or control transportation impacts, if any:
Traffic to and from the site will be minimal after construction is completed. No additional
measures are proposed.
15. Public services
a. Would the project result in an increased need for public services(for example:fire protection,
police protection, public transit, health care, schools, other)? If so, generally describe.
Public services that would be needed for the site are emergency services (police &
fire), which already exist in the area.
b. Proposed measures to reduce or control direct impacts on public services, if any.
None known.
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 13 of 14
16. Utilities
a. Circle utilities currently available at the site: An underground natural gas utility
pipeline marker was observed approximately 322-ft southeast of the subject
property.
electricity, natural gas, water, refuse service, telephone,
sanitary sewer, septic system, other
b. Describe the utilities that are proposed for the project,the utility providing the service, and the
general construction activities on the site or in the immediate vicinity which might
be needed.
Electric power to be installed to tower site.
Telecommunications fiber optics to be installed to tower site.
[All utility installations to take place within designated access&utility easement]
C. SIGNATURE
The above answers are true and complete to the best of my knowledge. I understand that the lead
agency is relying on them to make its decision.
Signature:
Date Signed:
Print Name of Signee:
If applicable, Position and Agency/Organization:
Date Submitted:
SEPA Environmental checklist(WAC 197.11-960)(MC version-non project portion omitted): 2016 Page 14 of 14