Loading...
HomeMy WebLinkAboutSHR2004-00027 Hearing - SHR Letters / Memos - 7/26/2005 CASE INDEX Raymond and Barbara Sebastian,and Lorren and Jeannie Fladseth SHR2004-00027 Index# Date Description 1 January 6,2W5 Exhibit 1:Staff Report Aril 27,2005 Attachment 1:Photos(9)of Hood Canal north shore shoreline May 4,2005 Attachment 2:Photos(5)of existing piers on the north shore of Hood Canal in the vicinity of the project area Attachment 3:Photos(5)of Port of Allyn Public Boat Ramp and Marina Attachment 4:Mason County Environmental Checklist Attachment 5:Mitigated Determination of onsi ificance SEP2004-00103 Attachment 6:Joint Aquatic Resources Permit Application Form March 17,2005 Attachment 7:Affidavit of Publication of Notice of Shoreline Management Permit Attachment 8:Shoreline Permit Application 10 March 21,2005 Attachment 9:Comments received from Washington Department of Ecology 11 —April 27,2005 Attachment 10:Letter received from Joseph Farmer 12 arch 15,2005 Attachment 11:Letter received from Doris Gennotti 13 April 15,2005 Attachment 12:Letter received from Northshore Neighbors for an Uncluttered Shoreline 14 March 29,2005 Attachment 13:Hydraulic Project Approval FW) 15 Attachment 14:Mason Environmental Permit 16 23 June,2004 Attachment 15:Findings of Fact,Conclusions of Law d Final Decision;Re:Robert Evans;Shoreline Substantial Development SHR2004-00006 17 28 January,2005 Attachment 16:Biological Evaluation,Marine Surveys Assessments 18 Attachment 17:Curriculum Vitae,Charles Mead McCoy III 19 Attachment 18:Dock,Piers and Float Impacts 0 16 June,2005 Attachment 19:WDFW(DRAFT)Priority Habitat and Species Management Recommendations 1 29 October,1999 Attachment 20:SHBSW,Final Findings of Fact, Conclusions of Law and Order;SHB No.99-011 2 19 January,2005 Attachment 21:Central Puget Sound Growth Management Hearings Board,State of Washington, Final Decision and Order,Case No.04-3-0013 Mason County Department of Planning Building I * 411 N.5th Street * P.O. Box 279 Shelton, Washington 98584 * (360) 427-9670 July 26,2005 TO: Mason County Hearing Examiner FROM: Planning Staff—Charles Mead McCoy III RE: Mason County Shoreline Substantial Development Permit(SHR2004-00027). STAFF REPORT Introduction. This report evaluates a proposal for the construction of a joint-use pier, ramp and float(PRF)structure in Hood Canal along the North Shore Road at milepost 10.7. The proposed structure will consist of a 6'by 65' fixed pier with to pilings,a 4'by 40'ramp leading to a 6'wide by 8'long float with two float pilings. Attached at a right angle to this float will be a 8'by 60'float with two float pilings. The total length of the PRF is not to exceed 115'from the Ordinary High Water Mark of Hood Canal (Attachment 16). I. Applicant:Lorren&Jeannie Fladseth and Raymond&Barbara Sebastian 11. Agent:Amy Leitman,Marine Surveys and Assessments. III. Date of Complete Application:January 29,2005. IV. Property Location:Site address and Project Location: 10731, 10741 and 10743 North Shore Road,Belfair. Section 24,Township 22N,Range 03W V. Evaluations: Characteristics of the area. The general area is characterized by residential construction along the north shore of Hood Canal.Waterfront residences are immediately east and west of the project site. No private residential pier,ramp,and float(PRF)structures are in the immediate vicinity of the proposed project area(Attachment 1). The predominate form of anchorage for private residences in the area is the use of moorage-ball buoys (Attachment 1). Many anchored floating platforms are also in existence along the north shore for recreational use by private residents(Attachment 1).To the southwest of the proposed project area,approximately a%4 mile from the proposed project site,the Shore Hill Estates Home Owners Association maintains a seasonal PRF for its approximately 50 resident members(Attachment 2).The majority of existing PRFs that do exist along this portion of the north shore of Hood Canal are predominately non-conforming structures under the current structural design requirements found in the Mason County Shoreline Master Program(Chapter 7.16.170)(Attachment 2). They continue to exist �M_', 2 3 Z: STATE OF WASHINGTON MCCD 1lEs�N( DEPARTMENT OF ECOLOGY PO Box 47775•Olympia,Washington 98504-7775•(360)407-6300 March 21,2005 Mr.Charles Mead McCoy III Your address Mason County ` is in the Department of Community Development (. ..I Kitsap Planning Division watershed PO Box 279 Shelton,WA 98584 Dear Mr.McCoy: Thank you for the opportunity to comment on the mitigated determination of nonsignificance for the Sebastian Joint-Use Pier,Ramp and Float Construction project(SEP2004-00103)located at 10731 Northeast North Shore Road in Beifair as proposed by Raymond Sebastian. We reviewed the environmental checklist and have the following comments: SHORELANDS:Kim Van Zwalenbarg(360)407- .§A bS l-� I have concerns about this proposal in an area with few docks. Hood Canal is a Shoreline of Statewide Significance and the proliferation of docks is an issue on this waterbody. In addition,it would appear that the portion of dock located on the Sebastian property exceeds the 115-foot length from the Ordinary High Water Mark. WATER QUALITY:Betsy Dickes(360)407-6294 The waters and aquatic life in Hood Canal must be protected from pollutants entering it from this project. Erosion control measures must be in place prior to any clearing,grading,or construction. These control measures must be effective to prevent soil from being carried into surface water by stormwater runoff. Sand,silt,clay particles,and soil will damage aquatic habitat and are considered pollutants when discharged to waters of the state. Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of Chapter 90.48,Water Pollution Control,and WAC 173-201A,Water Quality Standards for Surface Waters of the State of Washington,and is subject to enforcement action. During construction,all releases of oils,hydraulic fluids,fuels,other petroleum products,paints,solvents, and other deleterious materials must be contained and removed in a manner that will prevent their discharge to waters and soils of the state. The cleanup of spills should take precedence over all other work on the site. Proper disposal of construction debris must be on land in such a manner that debris cannot enter Hood Canal or cause water quality degradation of state waters. grLy', March 21,2005 Page 2 All trenches,depressions,or holes created in the intertidal area shall be backfilled prior to inundation by tidal waters. All stormwater discharges must be constructed in a manner that will not cause scouring on the beach. If you have any questions or would like to respond to these comments please contact the appropriate reviewing staff listed above. Department of Ecology Southwest Regional Office (AW:05-1800) cc: Betsy Dickes,WQ Lorren and Jeannie Fladseth(Applicants) Raymond and Barbara Sebastion(Applicants) Amy Leitman(Contact) Grace Miller(Mason County) - Agency Date Received:_ JOINT AQUATIC RESOURCES PERMIT APPLICATION FORM (DARPA) (for use in Washington State) PLEASE TYPE OR PRINT IN BLACK INK ❑I am applying for a Fish Habitat Enhancement Project per requirements of RCW 75.20.350. YOU must submit a copy of this completed JARPA application form,and the(Fish Habitat Enhancement JARPA Addition)to your local Government Planning Department and Washington Department of Fish&Wildlife Area Habitat Biologist on the same day. NOTE: LOCAL GOVERNMENTS—You must submit any comments on these projects to WDFW within 15 working day Based on the instructions provided,I am sending copies of this application to the following: (check all that apply) fit] Local Government for shoreline:®Substantial Development ❑Conditional Use ❑Variance ❑Exemption ❑Revision ❑Floodplain Management ❑Critical Areas Ordinance (LI Washington Department of Fish and Wildlife for HPA(Submit 3 copies to WDFW Region) (gJ Washington Department of Ecology for 401 Water Quality Certification Nationwide Permits(to Regional office-Federal Permit Unit) ❑ Washington Department of Natural Resources for Aquatic Resources Use Authorization Notification 10 Corps of Engineers for: ❑Section 404 9)Section 10 permit ❑ Coast Guard for Section 9 Bridge Permit ❑ US Fish&Wildlife Service or National Marine Fisheries Service for Endangered Species Act(ESA)Consultation SECTION A-Use for all permits covered by this application. Be sure to ALSO complete Section C(Signature Block)for all permit applications. 1.APPLICANT I � ' LO R R Err A Al N I E FL D5 E TH 1 lYt,, D I MAILING ADDRESS Da a1 5-1-_A✓E SW SF_arTrLr_ WA 981 &1 /3r4v- WORK PHONE E-MAIL ADDRESS HOME PtiONE FAX Iran agent is acting for the applicant during the permit process,complete ti2. 2.AUTHORIZED AGENT I4 M LEIT MAILING ADDRESS 5NA&STEAD LAY F0 r r Dw t✓ 3(o WORK PHONE / O 3 9 E-MAIL ADDR�E�� _ed. HOME PHONE - FAX t) - 3.RELATIONSHIP OF APPLICANT TO PROPERTY:p OWNER ❑PURCHASER ❑LESSEE ❑OTHER: A.NAME,ADDRESS,AND PHONE NUMBER OF PROPERTY OWNER(S),IF OTHER THAN APPLICANT: kM/t'4o/-Ia c 3ARBAIZP� SEBRSTIAr! 06(o TuRkEY TRACK WbAD FA)1 . (13o) &?-&-0V30 R e I L A 95-fo C-ft1RIL : sebetsiiAll @ SedC•CAM 5.LOCATION!STREET ADDRESS,INCLUDING CITY,COUNTY AND ZIP CODE,WHERE PROPOSED ACTIVITY EXISTS OR WILL OCCUR) 1 6) }31 /O3�3 NE NoRTiFSHnRE 12o.4D BELFAr%P_, L✓A 7135'a3 /NM�tSon/ COur�Y LOCAL GOVERNMENT WITH JURISDICTION(CITY OR COUNTY) MASorJ Cou1,_r1—Y WATERBODY floc)] C A NA-L.. TRIBUTARYOF RIAR rC Nc5v-T- Sot-tND %SECTION I SECTION TOWNSHIP RANGE GOVERNMENT LOT SHORELINE DESIGNATION (1± aat4 03V TR. 35�T T"L• U23Alra LATITUDE&LONGITUDE ) A4 , ZONING DESIGNATION L- �j IF KNOWN: : 42*91 ' LON&: �d3-Do• TAX PARCEL NO: 31 1 a LL- CD- DDOI r -FLAD SETH ONR STREAM TYPE,IF KNOWN 3&3-a q- - So- 000($-5E13ASTlAd N/A JARPA,Revised 12198,contact Ecology's Permit Assistance Center for latest version,360/407-7037 Page 1 of 4 6.DESCRIBE THE CURRENT USE OF THE PROPERTY,AND STRUCTURES EXISTING ON THE PROPERTY.IF ANY PORTION OF THE PROPOSED ACTIVITY IS ALREADY COMPLETED ON THIS PROPERTY,INDICATE MONTH AND YEAR OF COMPLETION, SINGLE FAMILj"RE5!Dt n/CE IS THE PROPERTY AGRICULTURAL LAND? p YES 01TO ARE YOU A USDA PROGRAM PARTICIPANT? ❑YES EMO 7a. DESCRIBE THE PROPOSED CONSTRUCTION AND/OR FILL WORK FOR THE PROJECT THAT YOU WANT TO BUILD THAT NEEDS AQUATIC PERMITS:COMPLETE PLANS AND SPECIFICATIONS SHOULD BE PROVIDED FOR ALL WORK WATERWARD OF THE ORDINARY HIGH WATER MARK OR LINE.INCLUDING TYPES OF EQUIPMENT TO BE USED.IF APPLYING FOR A SHORELINE PERMIT,DESCRIBE ALL WORK WITHIN AND BEYOND 200 FEET OF THE ORDINARY HIGH WATER MARK.ATTACH A SEPARATE SHEET IF ADDITIONAL SPACE LS NEEDED. CONST-RuCr NEB/, T oJNr USE �IERI RAMP I F'Lor�T: (.0I X I(o FIYEb P1ER CONSTRU�Et> OF DOUGL14S Fug, y-'X 'I-o'(ZAM? (Au,kAtlntuM) , 1 wo FLOATS ( VY- 8' c 8'X (oo') -i► PT CoN515i OF 1=N\uY Er4CL05ED IN EXTi AD'ED FOLyETy YLGNE., FDLI/STYRF,-IC- Flo AT10nl• ILf AC-aA- 1FILE5 LV,L.L SE DR\VE" Ta ELApPORT- STRv.CTUt2E PlE� AN-1) FLOATS WILL BE GAA-TCO SEE 5-E.) FOR ADD i(ONAL DET?i-tLS. 7b. DESCRIBE THE PURPOSE OF THE PROPOSED WORK AND WHY YOU WANT OR NEED TO PERFORM IT AT THE SITE,PLEASE EXPLAIN ANY SPECIFIC NEEDS THAT HAVE INFLUENCED THE DESIGN. EA5(EK WATER ACCESS FoR RECREA-T70M4L 01'FbRTuN1T7E$• 7c. DESCRIBE THE POTENTIAL IMPACTS TO CHARACTERISTIC USES OF THE WATER BODY.THESE USES MAY INCLUDE FISH AND AQUATIC LIFE.WATER QUALITY,WATER SUPPLY. RECREATION,and AESTHETICS.IDENTIFY PROPOSED ACTIONS TO AVOID,MINIMIZE,AND MITIGATE DETRIMENTAL IMPACTS,AND PROVIDE PROPER PROTECTION OF FISH AND AQUATIC LIFE.ATTACH A SEPARATE SHEET IF ADDITIONAL SPACE IS NEEDED. )VO ADVE25E A FF i<c T5 /D WArE i2 r3*D/At l c tPATEb, f. GRoOfI C . �. MARGoL�S (ED5) N'll. LIFE (fl5TOR`,j OF PACIFIC 5ALNtanl, 09C MS55, A" -3 PG• Z. M YElz5 T.M. Er AL 1199 STATuS I?Eoeu/DF 04INOok SALMON FROM /WIAIF=�t� OAR, 1' L-A U 3 •S• DEaT C.E Avg . OF 66MMER , OA T 6 TECH MMo • lvMF5- 3 N!C>rtfTlrlCr+4LE, 4RB/kR IfARLES SIMF�JSr1°rD Gaul 3- d/ER+n�4rE STt �tES MARINE ISSUES. PREPARATION OF DRAWINGS:SEE SAMPLE DRAWINGS AND GUIDANCE FOR COMPLETING THE DRAWINGS.ONE SET OF ORIGINAL OR GOOD QUALrry REPRODUCIBLE DRAWINGS MUST BEATTACNED.NOTE:APPLICANTS ARE ENCOURAGED TO SUBMIT PHOTOGRAPHS OF THE PROJECT SITE,BUT THESE DO NOT SUBSTITUTE FOR DRAWINGS. THECORPS OF ENGINEERS AND COAST GUARD REQUIRE DRAWINGS ON B-112 X 111NCH SHEETS.LARGER DRAWINGS MAYBE REQUIRED BY OTHER AGENCIES 8.WILL THE PROJECT BE CONSTRUCTED IN STAGES- .❑YES am PROPOSED STARTING DATE: AS 5ootj PcS PERM 1,1 S 'A P-E (SSLA ED, W/Z CONS—JPLkCfl afl VJND0%A/. ESTIMATED DURATION OF ACTIVITY: TV/() WEEKS 9.CHECK IF ANY STRUCTURES WILL BE PLACED: - p WATERWARD OF THE ORDINARY HIGH WATER MARK OR LINE FOR FRESH OR TIDAL WATERS;AND/OR ' 110ATERWARD OF MEAN HIGH WATER LINE IN TIDAL WATERS 10.WILL FILL MATERIAL(ROCK FILL,BULKHEAD,OR OTHER MATERIAL)BE PLACED: Nt) ❑WATERWARD OF THE ORDINARY HIGH WATER MARK OR LINE FOR FRESH WATERS? IF YES,VOLUME(CUBIC YARDS) /AREA (ACRES) I' ❑WATERWARD OF THE MEAN HIGHER HIGH WATER FOR TIDAL WATERS? IF YES,VOLUME(CUBIC YARDS) AREA (ACRES) JARPA,Revised 12/98,contact Ecology's Permit Assistance Center for latest version 360/407-7037 Page 2 of 4 > g 11.WILL MATERIAL BE PLACED IN WETLANDS? D YES EMIT IF YES: A.IMPACTED AREA IN ACRES: B.HAS A DELINEATION BEEN COMPLETED?IF YES,PLEASE SUBMIT WITH APPLICATION. ❑YES ❑NO C.HAS A WETLAND REPORT BEEN PREPARED?IF YES,PLEASE SUBMIT WITH APPLICATION. ❑YES D NO D.TYPE AND COMPOSITION OF FILL MATERIAL(E.G..SAND,ETC.): E MATERIAL SOURCE: F.LIST ALL SOIL SERIES(TYPE OF SOIL)LOCATED AT THE PROJECT SITE,6 INDICATE IF THEY ARE ON THE COUNTY'S LIST OF HYDRIC SOILS.SOILS INFORMATION CAN BE OBTAINED FROM THE NATURAL RESOURCES CONSERVATION.SERVICE(NRCS): - 12.WILL PROPOSED ACTIVITY CAUSE FLOODING OR DRAINING OF WETLANDS? D YES 0'90 IF YES,IMPACTED AREA IS_ACRES. 13.WILL EXCAVATION OR DREDGING BE REQUIRED IN WATER OR WETLANDS? D YES DIMS IF YES: A.VOLUME: (CUBIC YARDS)/AREA (ACRES) B.COMPOSITION OF MATERIAL TO BE REMOVED: C.DISPOSAL SITE FOR EXCAVATED MATERIAL: D.METHOD OF DREDGING: 14.HAS THE STATE ENVIRONMENTAL POLICY ACT(SEPA)BEEN COMPLETED? COtAN r ❑YES ENO SEPA LEAD AGENCY: SEPA DECISION:DNS,MONS,EIS,ADOPTION,EXEMPTION MASQI4 DECISION DATE(END OF PERIOD): SUBMIT A COPY OF YOUR SEPA DECISION LETTER TO WDFW AS REQUIRED FOR A COMPLETE APPLICATION 15.LIST OTHER APPLICATIONS,APPROVALS.OR CERTIFICATIONS FROM OTHER FEDERAL,STATE OR LOCAL AGENCIES FOR ANY STRUCTURES,CONSTRUCTION,DISCHARGES.OR OTHER ACTIVITIES DESCRIBED IN THE APPLICATION(I.E.,PRELIMINARY PLAT APPROVAL,HEALTH DISTRICT APPROVAL.BUILDING PERMIT,SEPA REVIEW.FEDERAL ENERGY REGULATORY COMMISSION LICENSE(FERC),FOREST PRACTICES APPLICATION,ETC.)ALSO INDICATE WHETHER WORK RAS BEEN COMPLETED AND INDICATE ALL EXISTING WORK ON DRAWINGS. TYPE OF APPROVAL ISSUING AGENCY IDENTIFICATION DATE OF APPLICATION. DATE APPROVED COMPLETED? NO. WDF/ GT D rjrA(0t_J5lS-rAr4V( 0 Li- 014 e6"N T V 0 ATM lCI MPCSDIJ 16,HAS ANY AGENCY DENIED APPROVAL FOR THE ACTIVITY DESCRIBED HEREIN OR FOR ANY ACTNITY DIRECTLY RELATED TO THE ACTIVITY DESCRIBED HEREIN? ❑YES BIZ IF YES,EXPLAIN: SECTION B-Use for Shoreline and Corps of Engineers permits oniy: 7.TOTAL COST OF PROJECT.THIS MEANS THE FAIR MARKET VALUE OF THE PROJECT,INCLUDING MATERIALS,LABOR MACHINE RENTALS,ETC 3Q/ 00D 18.LOCAL GOVERNMENT WITH JURISDICTION: MA-5t)J C0 u-rj1 19.FOR CORPS,COAST GUARD,AND DNR PERMITS,PROVIDE NAMES,ADDRESSES,AND TELEPHONE NUMBERS OF ADJOINING PROPERTY OWNERS.LESSEES,ETC.. PLEASE NOT£SHORELINE MANAGEMENT COMPLIANCE MAY REOUIREADDITIONAL NOTICE—CONSULT YOUR LOCAL GOVERNMENT. NAME ADDRESS PHONE NUMBER ALLgr4 s&e7t4A BLAcK- o} l NE oRitt StJOAP 90AD Sd RF,Lej,(P_ K 131 AVE, SW 51FAME, w L MR KPASKO j FgAr44 u/ D JARPA,Revised 12198,contact Ecology's Permit Assistance Center for latest version,360/407-7037 Page 3 of 4 SECTION C-This section MUST be completed for any permit covered by this application 0.APPLICATION IS HEREBY MADE FOR A PERMIT OR PERMITS TO AUTHORIZE THE ACTIVITIES DESCRIBED HEREIN.I CERTIFY THAT I AM FAMILIAR WITH THE INFORMATION CONTAINED IN THIS APPLICATION,AND THAT TO THE BEST OF MY KNOWLEDGE AND BELIEF,SUCH INFORMATION IS TRUE,COMPLETE,AND CCURATE 1 FURTHER CERTIFY THAT I POSSESS THE AUTHORITY TO UNDERTAKE THE PROPOSED ACTIVITIES.I HEREBY GRANT TO THE AGENCIES TO WHICH HIS APPLICATION IS MADE,THE RIGHT TO ENTER THE ABOVE-DESCRIBED LOCATION TO INSPECT THE PROPOSED,IN-PROGRESS OR COMPLETED WORK I AGREE TO START WORK ONLY AFTER ALL NECESSARY PERMITS HAVE BEEN RECEIVED. SIGNNATUURRQ/FF APPLIC6W AUTHORIZED AGENT ATE I H V OES r`TE 117�rt TO 4GENT IN MATTERS RELATED TO THIS APPLICATION FOR PERMIT(S).I UNDERSTAND THAT IF A FEDERAL PERMIT IS ISSUED. I S EPERMIT. y NATURE OF APPLICANT DATE SIG WNER(EXCEPT PUBLIC ENTITY LANDOWNERS,E.G.D DATE HIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND THE AGENT,IF AN AUTHORIZED AGENT IS DESIGNATED. f e U.S.0§7001 provides roar:Whoever,in any manner within the jurisdiction of any department or agency of the United Stales knowingly falsifies,conceals,or covers up by any trick,sch m eme,or device a nalerial factor makes any false,fictitious,or fraudulent statements or representations or makes or uses any false writing or doctirnent knowing same to contain any false,fictitious.or fraudulent statement or entry,shall he fined not more than 3110,000 or imprisoned not more than 5 years or both. Ufa 0-e 'j c �'Fs a*fi ry&_�.�' '"..^ . :�:- 3.a .,, -•�..4",':�� :� �z'2,��u der .,'��.F ,'- � .+-ter .° -y 3 �" 1TA�.. 1-Y t These Agencies are Equal Opportunity and Affirmative Action employers. For special accommodation needs,please contact the appropriate agency in the instructions. 1ARPA,Revised 12198,contact Ecology's Pertnit Assistance Center for latest version,360/407-7037 Page 4 of 4 Affidavit of Publication NOTICE OF SHORELINE MANAGEMENT PERMIT SHR2004.00027 Notice is hereby given that RAYMOND STATE OF WASHINGTON, SS SEBASTIAN,who is the owner of the de- COUNTY OF MASON scribed property,has filed an application for a Shoreline Management Permit for the de- velopment of: Sub.Dev. Julie G. Orme ,being first duly swom joint use pier ramp and float 6'x65'fixed pier constructed of douglas fir,4'x4O'alumi. on oath deposes and says that she is the clerk numcon ramp,two floats(6'x8'and extruded that oI'THESHELTON-MASON COUNTY JOURNAL,aweeklynewspaper.Thatsaidnews- consist of fully enclosed in extruded poly- ethylene,polystyrene floatation 14 plies will paper is a legal newspaper and it is now and has been for more than six months prior to the be driven to support structure. pier and date of the publication hereinafter referred to,published in the English language continu- floats will be grated ously as a weekly newspaper in SHELTON,Mason County,Washington,and it is now Site Address: 10731 NE NORTH and during all of said time was printed in an office maintained at the aforesaid place of SHORE RD BELFAIR publication of said newspaper.That the said SHELTON-MASON COUNTY JOURNAL. Parcel Number:322245000018 was on the 9th day of August,1941,approved as a legal newspaper by the Superior Court Location of Project:follow sr 3 north to of said Mason County. belfair from belfair follow sr 300 west to north shore rd site is approximately 8 miles west of belfair state park on north shore rd That the annexed is a true copy of a Not i e e of Shoreline Within:(quarter section)of Section:24 Township:22 N Range:03 W,W.M.in,Ma- Mgmt Permit — Raymond Sebastian son County Washington. Said development is proposed within hood canal and/or Its associated wetlands. as it was published in regular issues(and not in supplement form)of said Any person desiring to express their view or to be notified of the action taken on the ap. newspaper once each week for a period of two plication should notify: consecutive weeks,commencing on the MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 10 t h day of March 2O 0 5 ending on the P O BOX 279 SHELTON,WAtit8581 17th d March 05 in writing of their interest within 30 days ay of 20 both dates inclusive, of the final date of publication given pursu- and that such newspaper was regularly distributed to its subscribers during all of the said ant to WAC 173-14-020.The final date of period.That the full amount of the fee charged for the publication,posting,or mailing of notice is 3/17/2005. foregoing publication is the sum of$ 9 7•5 0 Written comments must be received by / 4/1 612 0 0 5. L A public hearing will be held on this per- mit request.Contact this office at(360)427- 9670,ext.294 for date and time of hearing. Subscribed and sworn to before me 1 7♦ h day of A Determination of Nonsignificance was vssttttrrrrrr issued on 3/WOOO under WAC 197-11.340. Written comments regarding thisdetermina- March 120 05 ```wpt1N DU6r!<,� lion must be received by 3/MrAw. `�` v5SION 3/10-17 2t Notary Vlic in and for the State of Washington AOTARI, = Residing at Shelton,Washington My commission expire 20� ''�q�/11 tW A SNwv�`\` MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT Courthouse Amex P.O.Box 279,Shelton,WA 98584 (360)427-9670 SHORELINE PERMIT APPLICATION PERMIT NO. SHORELINE SUBSTANTIAL DEVELOPMENT SHORELINE VARIANCE DATE RECEIVED SHORELINE CONDITIONAL USE SHORELINE EXEMPTION The Washington State Shoreline Management Act(RCW 90.58)requires that substantial developments within designated shorelines of the state comply with its administrative procedures(WAC 173-14)and the provisions of the Mason County Shoreline Management Master Program The purpose of this Act and local program is to protect the state's shoreline resources.The program requires that substantial development(any development of which the total cost or fair market value exceeds$5,000.00 or materially interferes with the normal public use of the water or shorelines of the State be reviewed with the goals,polices,and performance standards established in the Master Program. - Answer all questions completely.Attach any additional information that my further describe the proposed development. Incomplete applications will be returned. APPLICANT: LoRRE T,T£ANN tF FLAf)SE-r-H 0*Aaj j Dt}SpF1aig ADDRESS: FLA05FTW /0a-r¢A' al-rA/E. 5-1 5CB451-1AN 5 F-A r� (street)WA (city) (state) (yip) TELEPHONE: (.W(.)(oa3-0(pe2I (home) (business) AUTHORIZED REPRESENTATIVE: Am,( LEIrwtAt4 ADDRESS: Sal SNAG5MAD WPr✓ (atrm2f Tow/N5EN D s y5q WRY(zip)(zip)TELEPHONE: (�tyt'31p0) 3gS p�'I/- -3 (ante) PROPERTY DESCRIPTION: Genaal location(include property address,water body and associated wetlands--identify,the name of the 0 3raImp)• l /1�ff3 N iy�Rila S4042E P—OM> SELPMrG, WA r OR/ NOR(tt S&QF— OF Hnrr7 r6t.jokl. Legal description(include section,township,and range to the nearest quarter,quarter section or latitude and longitude to the nearest minute. Projects located in open water areas away from Sand shall provide a longitude location)-include all parcel numbers: pt4G: fj ' 00. OWNERSHIP: Contract Applicant )(_Owner Lessee Purchaser (Identify) Other Owner. S . ►ZRYMoNO s J?ARD�F4 rB+Sr+sb J/LD"W F[AD.tPnp.. SEBRsr,A-74 : .5o m(e Iuakr;Y iRAck Ro ft PLA-CV,4l u a; c-A- 9564� (eitY) i� (state) (zip) CrP1wNNII101CHARHLL&RFHHFISHORH[.WEPHRMIT.APP RHVISHD:06-23-03 DEVELOPMENT DESCRIPTON Development(identify and describe the proposed project,including the type of materials to be used,construction methods,principle dimensions,and other pertinent information): //s' ,TbtNT'uSE PiE2,i&mP s Fr p&1-: id' ms'pf,eD PiEQ lDrtSfPAACTED OF DOLA&L J" F1R r /Ift X W' AU&KINNM 1z+MP'_(-1✓0 BLOOM) (G,IY 91 424D_ 'x W')Tr vc toNrls ro F 1"U-y 04CLore-D f;i EXT-W%k9SD P6UVE1HVLG,JE b1-VSTYl�w�1E r-t�arFtrron� . �S�Ac��F t t t.fc W�LJ- veN c kE E c Flr„4 1✓Ii l 8>; GRIrc><7. SEP e. r2 A7atno�s+c�> S. Use(identify current use ofpropeny with exist improvements: `__.SrNrst-F_ 1::LFMILV RESTDF_NCF, Reason for requesting development EASiEQ WiYrE)P AccESS Fat Rcr a�noNRL OPPO 2Tuly 17Z E s. ACKOWLEDOEMENT I bye,to the best of my knowledge and beef,the a forgoin%gcp"/ Bnd&Ujittached information is 8a .�.. :.s Fe. � Iq "t (applicant or authorized representative) — ..................6............................................................ TO BE COMPLETED BY LOCAL OFFICIAL Identify and describe existing features of the site and surrounding area: If proposed structures will exceed a height of 35 feet above the existing grade level,indicate the location of any residential units that will have an obstructive view: If a Conditional Use or Variance is requested,make reference to the appropriate section in the Master Program I:iPIANNINOICHAREUARBNEMHOREUNEPERMIT.APP REVISP.D;06.25-07 The Shoreline Permit Application Page 3 PERMIT NO. ADJACENT PROPERTY OWNERS LIST Addresses arc to be obtained from the Mason County Assessor's Office,Building 1,second floor. Charlotte&Paul O'Leary A'Lan Hutchinson Helen Krasko Et Al 8438 S I O ST. 9419 40 Street CT E 16436 91 Ave.SW Tacoma,WA 98465 Puyallup,WA 98371 Seattle,WA 98166 Joseph&Jane Farmer Allen&Gem Black Daniel Lopriore 1401 5m Ave.W 4308 10711 NE North Shore Rd. 3020 W Garfield St. Seattle,WA 98119 Belfair,WA 98528 Seattle WA 98199 William&Kimmerlee Olsen Robert&Donna Tessier Kathaleen&Donavan Form P.O.Box 460 1565 Weathervane CT 3221 SW Avalon Way#206 Belfa r,WA 98528 Fircrest,WA 98466 Seattle,WA 98126 I I THE SHORELINE PERMIT PROCESS—Page 4 Publication cost is the responsibility of the applicant. Final permit processing will not occur until advertising fees have been paid to the newspaper by the applicant.The Shelton-Mason County Journal will bill the applicant directly. UWE understand that UWE must sign and date the attached acknowledgement indicating that UWE understand that is MY/OUR responsibility. UWE must submit the signed page as part of this application in order for it to be considered as complete. APVUCANY PSpl%-STAT�cO� MASON COUNTY Ao N DEPARTMENT OF COMMUNITY DEVELOPMENT Y S N Planning Division o N V o~ P O Box 279,Shelton,WA 98584 O 186A (360)427-9670 SHR2004-00027 NOTICE OF SHORELINE MANAGEMENT PERMIT Notice is hereby given that RAYMOND SEBASTIAN,who is the owner of the described property, has filed an application for a Shoreline Management Permit for the development of: Sub. Dev. joint use pier ramp and float 6'x 65'fixed pier constructed of douglas fir,4'x 40'aluminum ramp, two floats(6'x 8'and 8'x 60')that consist of fully enclosed in extruded polyethylene, polystyrene floatation 14 piles will be driven to support structure. pier and floats will be grated. Site Address: 10731 NE NORTH SHORE RD BELFAIR Parcel Number: 322245000018 Location of Project: Follow SR 3 north to Belfair,from Belfair follow SR 300 west to North Shore Road,site is aproximatly 8 miles west of Belfair State Park on North Shore Road. Within: (quarter section)of Section: Township: N Range: W,W.M. in,Mason County Washington. Said development is proposed within hood canal and/or its associated wetlands. Any person desiring to express their view or to be notified of the action taken on the application should notify: MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT P O BOX 279 SHELTON,WA 98584 in writing of their interest within 30 days of the final date of publication given pursuantto WAC 173-14-020. The final date of publication,posting,or mailing of notice is 3/17/2005. Written comments must be received by 4/16/2005. A public hearing will be held on this permit request. Contact this office at(360)427-9670, ext.294 for date and time of hearing. A Determination of Nonsignificanoe was issued on 3/6/2000 under WAC 197-11-340. Written comments regarding this determination must be received by 3/20/2000. SHR2004-00027 L ypN STArF� MASON COUNTY o A o DEPARTMENT OF COMMUNITY DEVELOPMENT y S u Planning Division i N T 4 P O Box 279,Shelton,WA 98584 Y boy (366)427-9s70 1864 Case No.: SHR2004-00027 SHORELINE PERMIT STATUS: DENIED Received: 11/24/2004 TO BE KEPT IN THE Type of Permit: Sub. Dev. PARCEL FILE Applicant: RAYMOND SEBASTIAN FN; 322v9-515_000 18 10731 NE NORTH SHORE RD BELFAIR,WA 98528 Location of Project: Follow SR 3 north to Belfair,from Belfair follow SR 300 west to North Shore Road,site is aproximatly 8 miles west of Belfair State Park on North Shore Road. Within hood canal and/or its associated wetlands. The project will be within shorelines of statewide significance. Shoreline Designation: Urban Parcel Number. 322245000018 Address: 10731 NE NORTH SHORE RD BELFAIR Legal Description: CADY'S SUNRISE BEACH TR. 34&T.L. EX.34-A TR. 33&T.L. EX. NE 20' Project Description: joint use pier ramp and float 6'x 65'fixed pier constructed of douglas fir,4'x 40'aluminum ramp,two floats(6'x 8'and 8'x 60')that consist of fully enclosed in extruded polyethylene, polystyrene floatation 14 piles will be driven to support structure. pier and floats will be grated. This permit has been denied by Mason County persuant to the Shoreline Management Act of 1971. w m as �_ �S't Ines aov STATE OF WASHINGTON _ -. -- ------- DEPARTMENT OF ECOLOGY R PO Box 47775•Olympia,Washington 98504-7775•(360)407-6300 i September 16,2005 Raymond and Barbara Sebastian 10731 NE North Shore Rd Belfair WA 98528 Loren and Jeannie Fladseth 10248 21'Avenue SW Seattle,WA 98146 Dear Mr.and Mrs.Sebastian and Mr.and Mrs.Fladseth: Re: Mason County-DENIED Permit#SHR2004-00027 SEBASTIAN,RAYMOND and FLADSETH,LOREN-Applicants Denied Shoreline Management Permit#2005-SW-02782 The Mason County-Denied Shoreline Management Substantial Development permit to authorize construction of a 115-foot joint-use pier,ramp and float on Hood Canal was received from Mason County. This decision was filed by the Department of Ecology on September 14,2005. Your appeal period will terminate on October 05,2005. Although your permit has been denied by Mason County you may choose to request a review(appeal)of the denial before the Shorelines Hearings Board. Instructions on how to file an appeal are available from the Shoreline Hearings Board at(360)459-6327. Note that your appeal must be filed by the end of the 21-day appeal period. Other federal,state and local permits may be required in addition to this shoreline permit. If you have any questions I can be reached at(360)407-6520. Sincerely, 0AUV_, 11 � �J Pfll Kim Van ZwalYnburg Shoreline Specialist Shorelands and Environmental Assistance Program KV:dn cc: Charles McCoy III,Mason County Amy Leitman Shoreline Management Act Permit Data Sheet and Transmittal Letter From: Mason, county TO: Wash- crarA nept Of _010 , P.O. Box .x19 ATTN: Shoreline Permit Reviewer Shelton, WA 98584 Southwest Regional Office ox , Olympia, WA 99504 Date of Transmittal: /Z ar Date of Receipt (Dept of Ecology) Type of Permit:(Indicate all that apply) Substantial Development_X_Conditional Use Variance_Revision_ Other Local Government Decision:Approval_Conditional Approval T Denial Applicant Information: applicant's Representative: (If primary contact) Name: Rklmors.o Srz sTlAn1 Name: AM4 LEiTPAAt,1 Address: ID-f31 NC- rVoPT-41 5+boE- Address: Sz 1 St4AC-�S�-p WAm I:2,0IAD 9 E LFA,i?- v-/A -FO'R=T r l b0tJ Sang 1,/J A —( 43S�8 `IS�68 Phone(s): wb/6 za, 06zi Phone(s): 366J 385 , 4023 Is the applicant the property owner: Yes No 'Location of Property:,(Section,Township and Range to the nearest 1/4,1/4 Section or latitude and longitude,and a street address where available) t0131 + 10:14-3 R-D. Water Body Name: RV01:> CpvtA� Shoreline of Statewide Significance Yes No Environment Designation: URfsAN Description of Project: (Summary ofthe intended use or project purpose) C ie.F. R AwtQ A,yD l o Pk-r Notice of Application Date 3 11 tog- Final Decision Date: 3 30 01- By: CAAgCVi-S M. MCCU of Phone#: 360 _ b T.L94 10651 NE Northshore Rd P.O Box 2122 Belfair,WA 98528 April 27,2005 RE:Pier Ramp&Floats Permit RECEIVED Planning Division APR 2 8 2005 Dept of Community Development P.O. 9 BELFAIR OFFICE Sheltonon,,W WA 98584 To Whom It May Concern: Subject Objection to Permit We own neighboring property to the parcel at 10731 NE Northshore Rd(#322245000018)the owner of which is seeking a permit to build an extensive pier ramp/floats configuration. We object to the issuance of this permit. There are very few private pier ramps on the north shore; we feel lucky,as do our neighbors,to be in this environment free of the shoreline CLUTTER that is so common on the south shore. For generations our neighbors have found it quite convenient to launch our boats at the Port of Allyn(only a few miles away)and tie up at a buoy in front of our property. Please help us maintain the natural beauty of our shoreline. Regards, Jose Fanner March 15 2005 Mason County Department of Community Development P.O.Box 279 MAR 2 2 2CC5 Loxt Shelton,WA.98584 Re:Application for a Shoreline Management Permit PERMIT ASSISTA r,,,E CENTEP Raymond Sebastian 10731 NE North Shore Rd. Belfair,WA.98528 Dear Sir or Madam: I am writing to express several concerns regarding a pier to be constructed at this site. First of all it states in the publication that this is a joint use pier yet it does not mention who this joint user will be. We do not know if it is north or south of the property,nor if perhaps the home owner of both lots is one and the same. Certainly you cannot issue a permit under those circumstances. Another concern is the location of this particular request. It is in a place where it quite possibly would be a situation where the pier would have to be brought in during the winter months as the wind in that area is really a handful and would easily destroy the structure if it remains in the water year around. If the land owner has not made arrangements for this it will not be long before the structure will be beyond repair and be another eye sore in the community. I am also concerned about the use of chemically treated pilings and their effect on chemical contamination of fish,shellfish and wildlife. I don't believe this has ever been clearly settled. A project of this type will shade/disturb apparent wetland plants and habitat. How much will this pier obstruct views of both the adjacent property owners and owners of upland properties. Are these people year round residents,I think that makes a difference to those of us who live here year around. Will this obstruct the beach walks. We do not know what docks are doing to the hood canal low oxygen problem. There should be a moratorium on building until the studies are completed. The granting of this permit will just be another proliferation of piers and we will have another south shore.The accumulative impact on the whole area cannot be seen at this time,but undoubtedly it will change the whole appearance of the shoreline from all the homes in the area. This shoreline designation of the site is a Shoreline of Statewide Significance and consideration should be given concerning the interests of all people. Please note this letter is asking to be notified of hearings on this matter. t i d a vn�Z Doris Gennotti 6311 NE Northshore Rd. Belfair,WA 98528 Cc:County Commissioners Allen Borden APR-15-2005 13:20 FROM:CRRESOURCE�CONIFER C206) 682-2901 TO:13604277798 P.1 Northshore Neighbors for an Uncluttered Shoreline 426 Yale Avenue N. • Seattle, WA 98109 April 15, 2005 FAX: 360-427-7798 Mason County Dept. of Community Development P.O. Box 279 Shelton,WA 98584 Re: Dock Permit Application of Raymond Sebastian— 10731 N.E.Northshore Rd. Dear Sir or Madam: I am writing on behalf of Northshore Neighbors for an Uncluttered Shoreline. We are a non-profit organization created last year to oppose the construction of inappropriate permanent structures in the inter-tidal zone of Hood Canal. With regard to the above referenced application,we urge planning staff to weigh with utmost care the long-tens implications of this proposed dock development in light of the state Shorelines Management Act,various decisions of the state Shorelines Hearings Board(most notably Gennotti v. Mason County, SHB 99-011, and Viafore v. Mason County, SHB 99-033), and the recent decision of Mason County in Application of Robert Evans, Case SHR2004-00006. This proposal is for permanent development on a shoreline that the legislature has specifically designated a Shoreline of Statewide Significance. Accordingly,the applicant bears the burden of showing a clear need for the dock that can not be met through other means. The applicant must also show a genuine absence of adverse impact to views,public enjoyment of the tidelands, and the environmental quality of the canal for marine life. We respectfully urge you to withhold your approval of this application unless the applicant is able to establish with solid, objective evidence: APR-15-2005 13:20 FROM:CARESOURCE,CONIFER (206) 682-2901 TO:13604277798 P.2 Mason County Department of Community Development,April 15, 2005,p. 2 of 2 1. That he has a serious need for the dock structure that outweighs the public's interest in preventing intrusion of permanent structures onto the shoreline,and that the applicant has also conclusively demonstrated that his needs cannot be met through any other means that are less intrusive on the shoreline; 2. That there will be no adverse affects on views from nearby parcels up and down the shoreline; 3. That there will be no adverse aesthetic affect on the view of the shoreline itself, i.e. the view of the shoreline as a natural feature when viewed from the water, from the south shore,or from the North Shore Road; 4. That the water quality of the Canal will not be adversely affected; 5. That construction of this dock will not in any way lead or tend to lead to the development of even more permanent dock structures on the tidelands. 6. That construction of this dock will not, as part of a cumulative effect of development along the shoreline,diminish the natural character and scenic beauty of the Canal. 7. That construction of this dock will not in any significant way impair or interfere with the use and enjoyment of the tidelands and the waters over them at high tide by neighboring property owners or the public, including for swimming, boating, kayaking, canoeing, and fishing. We also respectfully ask to be kept informed of your consideration and actions in this matter. Sincerely, L.- 'I Dennis Kenny, Vice Pre dent Charles McCoy III-705masoncounty28.DOC page Northshore Neighbors for an Uncluttered Shoreline 426 Yale Avenue N. • Seattle, WA 98109 August 1,2005 Mason County Hearing Examiner Building 1 411 N. 511 Street Shelton,WA 98584 Re: Substantial Development Permit Application of Raymond Sebastian— SHR2004-00027 Dear Sir: This letter is being submitted to you on behalf of Northshore Neighbors for an Uncluttered Shoreline. We are a not-for-profit organization whose purpose is to oppose the construction of unnecessary permanent structures in the inter-tidal zone along the north shore of Hood Canal.We strongly support the recommendation of the Mason County Planning Staff that this permit application be denied. Statement in Support of the Staff Recommendation We respectfully urge the adoption of the staff recommendation for denial.The public has a long range and,we believe,compelling interest in preserving what remains of the natural,relatively uncluttered beauty and character of the North Shore.This is true because of the express designation in the state Shorelines Management Act of the North Shore shoreline(along with the balance of Hood Canal shoreline)as a"shoreline of statewide significance." Staff hits the nail on the head in pointing out that:this is a stretch of shoreline that is still relatively uncluttered by over-water structures;that the long-accepted method for boat anchorage for private residences along the North Shore is mooring buoys;and that a combination of mooring buoys and recreational floats Charles McCoy.III-705masoncountyLB.DOC Page 2 1 are a readily available and preferred option open to applicants. We feel that staff likewise gets to the heart of the matter when he writes: [T]he south shore has been significantly altered by the high-density of piers and docks along its shoreline. The question posed is whether we want to establish the incremental increase of these types of over-water structures that will almost certainly progress toward another zone of high-density of piers and docks along the north shore like that of the already significantly altered south shore."(p.S) The staff makes two key points we agree with and wish to stress:first, given the realities of development along a sensitive shoreline,it is no longer adequate or appropriate to look at a proposal such as this one in isolation—it must be judged, instead,in the context of the precedent it sets;and second, if a person wants to appraise the negative affects of dock proliferation(or,as some refer to it,the "porcupine effect")one need look no further than the south shore. Additional Points in Opposition to the Application Regarding the Applicants'Failure to Demonstrate a Private Need That Outweighs the Public's Recognized Interest in Maintaining the Relatively Unspoiled,Uncluttered Character of the Shoreline What is the applicants'burden in this situation?What must they show to justify placing permanent structures on the tidelands?In short,what standard applies here? The answer to these crucial questions is clearly set forth by the state Shorelines Hearings Board in the Gennotti case(Gennotti et al.v. Shearer,SHB Case 99-011, October, 1999): [W]e are not persuaded that accommodating[the applicant's]desire for greater convenience outweighs the public interest in protecting this shoreline of statewide significance as fully as possible. The legislature contemplates the protection ofprivate property rights onl i extraordinary circumstances are shown and the public interest suffers no substantial detrimental effect. (page 10) z Charles McCoy ill-705masoncounty28.DOC Page 3 This is a clear,two-part test.Under the first part of this accepted standard,an applicant seeking to build for private purposes on a shoreline of statewide significance must first show that his interests and needs outweigh the public's interest in"protecting the shoreline. . .as fully as possible." A high standard,indeed;and not one,we believe,that has been met—or can be met—in this situation. Under the second part of this standard,an applicant must show"extraordinary circumstances"AND that"the public interest suffers no detrimental effect." Part two is as high,if not higher than part one.Here,too,we believe the applicants have failed to make the required showing of extraordinary circumstances and protection of the public interest in preserving the long term character of the shoreline. Re¢ardine Cumulative Impacts So far as we have been able to determine,applicants and their expert have not addressed the critical issue of cumulative impact.Yet cumulative affects of structures like the ones being proposed are at the heart of the public's interest in the long term well being of the protected shoreline.Cumulative impact just means that approval of one dock application can reasonably be expected to lead to another,and then a third,with a cluttered and degraded shoreline as the result. Our argument is simple:we cannot line the shoreline with permanent docks serving private residences—at a density of one every 100 or 150 feet—and still enjoy anything like the beauty and character of Hood Canal that we have today. And so the question is,where do you draw the line?And the problem—which both the Shorelines Management Act and the Shorelines Hearings Board address— is that unless you place the bar very high(by requiring a showing that the private need outweighs the public interest AND that the application is supported by "extraordinary circumstances"),the task of protecting the uncluttered character of the shoreline becomes progressively more difficult,until soon the public asset that is an uncluttered shoreline is beyond saving and,therefore,irrevocably lost. There is ample authority for the concerns we are expressing. In Gennotti the state Shorelines Hearings Board noted: 3 Charles McCoy III-705masoncount�/28.DOC Page 4 we share. . . concerns that approval of the proposed pier-dock and float would pave the way for similar projects in the area, thus encouraging a cumulative negative impact on the shoreline.Additional structures, like the one proposed, could only exacerbate the adverse impact on threatened Hood Canal summer chum and alter the character of the immediate vicinity. (pages 10 and II) And in a second case involving a permit application in Mason County, Viafore, (Viafore v. Bauer,SHB Case 99-033,September,2000)the Shorelines Hearings Board held: Even if the proposed dock alone would have no adverse impact, it should be considered in the cumulative adverse impact attendant on potential future dock development. (page 4) In terms of both compatibility and view impacts, considerable weight must be given to the possibility that similar docks will be sought by property owners. . . if the permit here is allowed to stand. The cumulative effect of such development would be inconsistent with the cited policies and regulations. It would allow for the substantial degradation and corresponding reduction in public rights resulting from multiple docks on what is now a relatively pristine shoreline environment. Ina case such as this it is critical to consider the cumulative impacts of a proposed development. (page 7,emphasis added.) Questions the Applicants Have Not Addressed and Should be Required to Address Before a Permit is Granted Ouestions for the Applicants'Expert on Biological Impacts 1. Have you made any attempt to quantify the cumulative,long term effects of increased density of permanent pier-ramp-float(PRF)structures along this stretch of the North Shore,including:(1)reasonably predictable adverse affects on the natural,relatively uncluttered character of the shoreline; (2)reasonably predictable adverse affects on the view both from and of the shoreline;(3) a Charles McCoy III 705masoncountyM.DOC Page 5 reasonably predictable adverse affects on over-water use of the near shore by the public in boating,swimming,canoeing,kayaking,and fishing;and(4) reasonably predictable adverse affects on the long term ecological health of Hood Canal? a. If the answer is"yes,"what specific conclusions have you drawn on these issues and what data and analysis can you point to in support of your conclusions? I b. If the answer is"no,"do you consider these considerations irrelevant? And,if so,why? Questions for the Applicants 2. The long accepted method for boat anchorage along the North Shore is with a mooring buoy or float.Why do you feel this method will not adequately meet your needs,as well? 3. The state Shorelines Management Act and cases decided by the Shorelines Hearings Board require that you demonstrate that your need for the structures you propose outweighs the public's interest in preserving the relatively uncluttered character of the shoreline in the vicinity of your property.What facts and circumstances,if any,can you point to in support of such a conclusion? 4. The state Shorelines Management Act and cases decided by the Shorelines Hearings Board require that you demonstrate"extraordinary circumstances"in support of your application.What facts and circumstances,if any,do you believe support a finding of extraordinary circumstances in this situation? 5. The state Shorelines Management Act and cases decided by the Shorelines Hearings Board require that you show that the public interest will suffer no substantial detrimental effect from your construction project. What facts and circumstances,if any,do you believe support a finding that the long term interests of the public in protecting the beauty and character of the shoreline will be as well protected with your permanent structures as without them? s Charles McCoy III-705masoncounty28AOC _ Page 6 Thank you for your careful consideration of the issues in this case,including the competing public and private interests in play here.For the reasons stated,we respectfully urge that the Staff Recommendation be accepted and the application denied. Sincerely, North Shore Neighbors for an Uncluttered Shoreline Steve Zabel,President Dennis Kenny,Vice President Carol Lavender Willison,Vice President Linda Hinds,Secretary/Treasurer Wanda Dray,Board Member 6 Sebastian/Fladseth SDP Application Remarks in Support of Staff Recommendation Offered by Northshore Neighbors for an Uncluttered Shoreline August 9, 2005 Our group's position is that the staff recommendation for denial is strongly supported by relevant precedent and should be accepted. The authority and supporting points we would like to mention include: The State Shorelines Management Act Washington's Shorelines Management Act(SMA)became law in 1971. It was a legislative response to the complete prohibition on any private infringement upon navigable waters set down two years earlier in the Wilbour v. Gallagher case, 77 Wn. 2d 306,462 P.2d 232,(1969). The SMA,in its statement of purpose,provides in part: * * * The legislature declares that the interest of all of the people shall be paramount in the management ofshorelines ofstatewide significance. The department,in adopting guidelines for shorelines of statewide significance, and local government,in developing master programs for shorelines of statewide significance,shall give preference to uses in the following order of preference which: (1)Recognize and protect the statewide interest over local interest; (2)Preserve the natural character of the shoreline; (3)Result in long term over short term benefit; (4)Protect the resources and ecology of the shoreline; (5)Increase public access to publicly owned areas of the shorelines; (6)Increase recreational opportunities for the public in the shoreline; RCW 90.58.020 (Emphasis Added.) i And in RCW 90.58.030, essentially all of Hood Canal's shorelines are expressly 1. given this special level of protection: I Z * * * (e) " Shorelines of statewide significance"means the following shorelines of the state: * * * (ii)Those areas of Puget Sound and adjacent salt waters and the Strait of Juan de Fuca between the ordinary high water mark and the line of extreme low tide as follows: * * * (C)Hood Canal --from Tala Point to Foulweather Bluff, Decisions by the State Shorelines Hearings Board Decisions at the Shorelines Hearings Board, including both Gennotti and Viafore out of Mason county,are strongly supportive of the staff recommendation. Here are key passages from each case: i Gennotti, pages 10 and 11: [w]e are not persuaded that accommodating[the applicant's]desire for greater convenience outweighs the public interest in protecting this shoreline of statewide significance as fully as possible. The legislature contemplates the protection of private property rights only i extraordinary circumstances are shown and the public interest suffers no substantial detrimental effect. Finally, we share[the neighbors J concerns that approval of the proposed pier-dock and float would pave the way for similar projects in the area, thus encouraging a cumulative negative impact on the shoreline.Additional structures, like the one proposed, could only exacerbate the adverse impact on threatened Hood Canal summer chum and alter the character of the immediate vicinity. (pages 10 and 11) Viafore, Conclusion of Law VI: In terms of both compatibility and view impacts, considerable weight must be given to the possibility that similar docks will be sought by property owners on Pickering Passage if the permit here is allowed to stand. The cumulative effect of such development would be inconsistent with the cited z policies and regulations. It would allow for the substantial degradation and corresponding reduction in public rights resulting from multiple docks on what is now a relatively pristine shoreline environment. In a case such as this it is critical to consider the cumulative impacts of a proposed development. Buechel, 125 Wn.2d at 210; Hayes v. Yount, 87 Wn.2d 280 (1976)("Logic and common sense suggest that numerous projects, each having no significant effects individually, may well have very significant effects when taken together.');Bellevue Farm Owners Assn v. Shorelines Hearings Board, 100 Wn. App. 341, 362 (2000). (page 7) Recent Mason County Permit Denials First,two short excerpts from the Hearing Examiners decision in last summer's Evans case, SHR2004-00006: To allow piers every fifty feet would transform the shoreline vistas from their relatively unobstructed state to a crowded viewscape of piles, rails, and decking. The cumulative impact would also be more than aesthetic. The pilings that support the proposed pier hinders public access across inter- tidal areas. The construction of piers of this nature every fifty feet would create an obstacle course for inter-tidal use. (page 4) The hearing examiner finds Gennotti and Tjia ore persuasive.As in those cases, the proposed dock and pier is proposed for a largely unobstructed shoreline where cumulative impacts could be very significant. At a cumulative level, in addition to aesthetic incompatibility, the construction of piers every fifty feet would also be incompatible with the current accessibility to public use in inter-tidal areas. Aesthetic incompatibility alone is sufficient to justify denial of the permit, but the cumulative impacts upon access along the inter-tidal areas is also a significant factor. (page 7) It is also worth noting that prior to the Evans case,in three similar applications for private docks on Hood Canal or its estuaries,the Mason County Commissioners voted unanimously to deny a permit for permanent structures on the inter-tidal zone. 3 II The first was the application of Lynne and Doug Bevis along the South Shore. Denied unanimously on May 14,2002. Then on July 23,2002,the Commissioners heard the application of Calvin and Jane Christiansen. In that case there were two existing docks in the area: on one side 500 feet away;and one on the other side 1000 feet away. Citizens opposed that project on the basis of view, aesthetics,beach usage, and the noise of wave action on docks. In voting to deny the application,Commissioner Holter noted: The SMP allows for docks that meet the requirements, in areas where there currently are docks. He referred to the piers and docks policy that is a serious part of the SMP. He appreciates the fact the property owner would like to have a dock to enjoy the waterfront but he doesn't want to see a dock in an area where currently there aren't any docks. And finally,in April 2003 the Commissioners unanimously denied a dock permit to Andy Bell at 4261 E. State Highway 106,east of Union. Mr. Bell owned 700'of waterfront and had a seemingly strong argument for "extraordinary circumstances"in that he was wheelchair bound,and using a nearby marina was not just less convenient, it was a physical impossibility. The Commissioners nonetheless voted unanimously to deny the application. I Commissioners Camin and Johnson both suggested the applicant pursue other options for improving beach and boat access_ Commissioner Johnson said: If the proposal were to be approved, it would set a precedent that other property owners could ask if it could be done on their property. Conclusion There's no doubt applications such as this can be difficult,involving, as they do, two clearly opposing interests: one private and one public. j On the one hand,there is the understandable—and presumably good faith—interest of the property owners in developing the usability and value of their property. 4 �f On the other hand,however,there's the long term interest of the public to be considered. That interest includes protecting,as fully as possible,the public's access to and ability to use the shoreline, including the inter-tidal zone extending from very low tides to the"ordinary high water mark."It therefore often means denying permits for permanent structures that would obstruct or impede swimming,boating,kayaking, canoeing, and fishing. The public's interest also includes preventing the progressive, incremental loss of the natural vistas and character that this relatively uncluttered shoreline still enjoys. Our group,Northshore Neighbors for an Uncluttered Shoreline,is firmly committed to supporting Mason County as it does the difficult work of balancing these private and public interests. Our goal this afternoon has been to point out that the various authorities interpreting and applying the state's designation of the North Shore as a"shoreline of statewide significance"would seem to provide more than enough support for the Planning Department's recormnendation. i I i I �I s i Coastal aL Washington HYDRAULIC PROJECT APPROVAL Department of 48 Devonshire Road FISH and RCW 77.55.100-Appeal pursuant to Chapter 34.05 RCW Montesano,WA 98563 WILDLIFE (360)249-4628 Issue Date: March 24,2005 Control Number: 100102-1 Expiration Date:April 15,2007 FPA/Public Notice#: PERMITTEE AUTHORIZED AGENT OR CONTRACTOR Marine Surveys&Assessments Lorren Fladseth ATTENTION:Amy Leitman E C E I It E Di 10731 NE Northshore Road 521 Snagstead Way Belfair WA,98528 Port Townsend WA,98368 t MR 2 g 2 NO 206-623-0621 360-385-4073 Fax:206-277-9739 Fax:360-385-1724 M Gn - P A NMI NCB Ji Project Name: Fladseth Project Description: Construct new joint use Pier, ramp and float with 14 ACZA piles. PROVISIONS 1.Work below the ordinary high water line shall not occur from February 15 through July 14 of any year for the protection of migrating juvenile salmonids. 2.Work below the ordinary high water line shall not occur from September 15 through December 31 and from January 1 through March 1 of any year for the protection of surf smelt spawning beds. 3.Work shall be accomplished per plans and specifications approved by the Washington Department of Fish and Wildlife entitled Fladseth and Sebastian Joint-Use Pier,Ramp and Float Project and dated January 10,2005,except as modified by this Hydraulic Project Approval. A copy of these plans shall be available on site during construction. 4.All manmade debris on the beach shall be removed and disposed of upland such that it does not enter waters of the state. 5.The pier, ramp,and float centerline shall be re-established during the construction phase using the same methodology employed to establish the centerline during the vegetation survey to ensure protection of the eelgrass/herring spawning habitat. 6.The pier, ramp,and float structure shall not exceed 115 feet in total length. 7.The solid decked portions of the structure shall not exceed the following widths:the 65-foot long pier,6 feet;the 40-foot long ramp,4 feet;and two rectangular floats: 8-foot long by 6 foot wide and 60 foot long by 8 feet wide. 8.The 6 foot by 8 foot rectangular shaped float shall contain 2 foot wide area down the center and the 8 foot by 60 foot rectangular shaped float shall contain a 4 foot wide area down the center of grating that passes a minimum of 60 percent sunlight,approved by WDFW. Floatation shall be located under the solid decked area only. The grated area shall not be used for storage purposes. 9.No portion of the dock or float system shall ground. A minimum space of 12 inches shall be maintained at all times between the bottom of the dock or float and the beach grade. Page 1 of 5 jL Washington HYDRAULIC PROJECT APPROVAL coastal Department of 48 Devonshire Road FISH and WILDLIFE Montesano,WA 98563 (360)249-4628 Issue Date: March 24,2005 Control Number: 100102-1 Expiration Date:April 15, 2007 FPA/Public Notice#: 10.Floats, rafts,and associated anchoring systems shall have been designed and shall have been deployed so that the bed is not damaged. 11. Floatation for the structure shall be fully enclosed and contained to prevent the breakup or loss of the floatation material into the water. 12.As specified in the application,the 14 pilings may be recycled creosote treated pilings/ Chemonite pilings treated at 1.5 pounds per cubic foot but shall not be new creosote treated pilings. 13.All piling, lumber, and other materials treated with preservatives shall be sufficiently cured to minimize leaching into the water or bed. 14.All treated wood piling and lumber to be used for the project shall meet or exceed the standards established in,'Best Management Practices For the Use of Treated Wood in Aquatic Environments' developed by the Western Wood Preservers Institute,revised July 1996. 15.The pier, ramp,float, and associated moorings shall have been designed and shall have been located to avoid shading of eelgrass(Zostera spp). 16. Eelgrass and kelp shall not be adversely impacted due to any project activities(e.g., barge shall not ground,equipment shall not operate,and other project activities shall not occur in eelgrass and kelp). 17. Removal or destruction of overhanging bankline vegetation shall be limited to that necessary for the construction of the project. 18. Intertidal wetland vascular plants shall not be adversely impacted due to project activities(e.g., barge shall not ground,equipment shall not operate,and other activities shall not occur in intertidal wetland vascular plants). If such vegetation is adversely impacted,it shall be replaced using provers methodology. 19.All natural habitat features on the beach larger than 12 inches in diameter, including trees, stumps, logs,and large rocks,shall be retained on the beach following construction. These habitat features may be moved during construction if necessary. 20. Project activities shall be conducted to minimize siltation of the beach area and bed. 21. If at any time,as a result of project activities,fish are observed in distress,a fish kill occurs,or water quality problems develop(including equipment leaks or spills), immediate notification shall be made to the Washington Department of Ecology at 1-800-258-5990, and to the Area Habitat Biologist listed below. 22.All debris or deleterious material resulting from construction shall be removed from the beach area and bed and prevented from entering waters of the state. Page 2 of 5 Washington HYDRAULIC PROJECT APPROVAL Coastal Department of 48 Devonshire Road FISH and WILDLIFE Montesano,WA 98563 (360)249-4628 Issue Date: March 24,2005 Control Number: 100102-1 Expiration Date:April 15,2007 FPA/Public Notice#: 23. No petroleum products or other deleterious materials shall enter surface waters. 24.Wood treated with preservatives,trash,waste,or other deleterious materials shall not be burned below the ordinary high water line. Limited burning of untreated wood or similar material may be allowed at or above the mean higher high water line. 25.Project activities shall not degrade water quality to the detriment of fish life. 26. Sawdust,drillings or trimmings from treated wood shall be contained with tarps or other impervious materials and prevented from contacting the beach, bed or waters of the state. 27.Treated piling or structures built of treated wood shall incorporate design features, such as steel,plastic or rubber collars or fendering systems to prevent or minimize the abrasion of the treated wood by floats, ramps or vessels. PROJECT LOCATIONS Location#1 Fladseth Work Start:07-15-2005 Work End:02-15-2007 WRIA WATERBODY TRIBUTARY TO COUNTY 15.9120 Wria 15 Marine Hood Canal Mason 1/4 SEC. Section Township: Range: Latitude: Longitude SE 1/4 24 �22 N 03 W N 47.3820 W 123.0076 DRIVING DIRECTIONS: NOTES This project is a joint use PRF additional owners are Lorren&Jeannie Fladseth,address 10248 21 st Ave SW Seattle,WA 98146 and Raymond&Barbara Sebastian, address 5066 Turkey Track Road, Placerville,CA 95667 APPLY TO ALL HYDRAULIC PROJECT APPROVALS This Hydraulic Project Approval pertains only to the provisions of the Washington State Fisheries and Wildlife Code,specifically RCW 77.55(formerly RCW 75.20). Additional authorization from other public agencies may be necessary for this project. The person(s)to whom this Hydraulic Project Approval is issued is responsible for applying for and obtaining any additional authorization from other public agencies(local, state and/or federal)that may be necessary for this project. This Hydraulic Project Approval shall be available on the job site at all times and all its provisions followed by the person(s)to whom this Hydraulic Project Approval is issued and operator(s) performing the work. This Hydraulic Project Approval does not authorize trespass. Page 3 of 5 Washington HYDRAULIC PROJECT APPROVAL Coastal Department of 48 Devonshire Road FISH and WILDLIFE Montesano,WA 98563 (360)249-4628 Issue Date: March 24,2005 Control Number: 100102-1 Expiration Date:April 15, 2007 FPA/Public Notice#: The person(s)to whom this Hydraulic Project Approval is issued and operator(s)performing the work may be held liable for any loss or damage to fish life or fish habitat that results from failure to comply with the provisions of this Hydraulic Project Approval. Failure to comply with the provisions of this Hydraulic Project Approval could result in a civil penalty of up to one hundred dollars per day or a gross misdemeanor charge,possibly punishable by fine and/or imprisonment. All Hydraulic Project Approvals issued pursuant to RCW 77.55.100 or 77.55.200 are subject to additional restrictions, conditions or revocation if the Department of Fish and Wildlife determines that new biological or physical information indicates the need for such action. The person(s)to whom this Hydraulic Project Approval is issued has the right pursuant to Chapter 34.04 RCW to appeal such decisions. All Hydraulic Project Approvals issued pursuant to RCW 77.55.110 may be modified by the Department of Fish and Wildlife due to changed conditions after consultation with the person(s)to whom this Hydraulic Project Approval is issued: PROVIDED HOWEVER,that such modifications shall be subject to appeal to the Hydraulic Appeals Board established in RCW 77.55.170. APPEALS INFORMATION IF YOU WISH TO APPEAL THE ISSUANCE OR DENIAL OF,OR CONDITIONS PROVIDED IN A HYDRAULIC PROJECT APPROVAL,THERE ARE INFORMAL AND FORMAL APPEAL PROCESSES AVAILABLE. A. INFORMAL APPEALS(WAC 220-110-340)OF DEPARTMENT ACTIONS TAKEN PURSUANT TO RCW 77.55.100,77.55.110,77.55.140,77.55.190, 77.55.200,and 77.55.290: A person who is aggrieved or adversely affected by the following Department actions may request an informal review of: (A)The denial or issuance of a Hydraulic Project Approval,or the conditions or provisions made part of a Hydraulic Project Approval;or (B)An order imposing civil penalties. A request for an INFORMAL REVIEW shall be in WRITING to the Department of Fish and Wildlife HPA Appeals Coordinator,600 Capitol Way North,Olympia, Washington 98501-1091 and shall be RECEIVED by the Department within 30-days of the denial or issuance of a Hydraulic Project Approval or receipt of an order imposing civil penalties. If agreed to by the aggrieved party,and the aggrieved party is the Hydraulic Project Approval applicant, resolution of the concerns will be facilitated through discussions with the Area Habitat Biologist and his/her supervisor. If resolution is not reached,or the aggrieved party is not the Hydraulic Project Approval applicant,the Habitat Environmental Services Division Manager or his/her designee shall conduct a review and recommend a decision to the Director or his/her designee. If you are not satisfied with the results of this informal appeal,a formal appeal may be filed. B. FORMAL APPEALS(WAC 220-110-350)OF DEPARTMENT ACTIONS TAKEN PURSUANT TO RCW 77.55.100 OR 77.55.140: A person who is aggrieved or adversely affected by the following Department actions may request a formal review of: (A)The denial or issuance of a Hydraulic Project Approval,or the conditions or provisions made part of a Hydraulic Project Approval; Page 4 of 5 jL Washington HYDRAULIC PROJECT APPROVAL coastal toDepartment of FISH and 48 Devonshire Road WILDLIFE Montesano,WA 98563 (360)249-4628 Issue Date:March 24, 2005 Control Number: 100102-1 Expiration Date:April 15, 2007 FPA/Public Notice#: (B)An order imposing civil penalties;or (C)Any other'agency action'for which an adjudicative proceeding is required under the Administrative Procedure Act, Chapter 34.05 RCW. A request for a FORMAL APPEAL shall be in WRITING to the Department of Fish and Wildlife HPA Appeals Coordinator,shall be plainly labeled as'REQUEST FOR FORMAL APPEAL'and shall be RECEIVED DURING OFFICE HOURS by the Department at 600 Capitol Way North, Olympia, Washington 98501-1091,within 30-days of the Department action that is being challenged. The time period for requesting a formal appeal is suspended during consideration of a timely informal appeal. If there has been an informal appeal,the deadline for requesting a formal appeal shall be within 30-days of the date of the Department's written decision in response to the informal appeal. C. FORMAL APPEALS OF DEPARTMENT ACTIONS TAKEN PURSUANT TO RCW 77.55.110. 77.55.200,77.55.230,or 77.55.290: A person who is aggrieved or adversely affected by the denial or issuance of a Hydraulic Project Approval,or the conditions or provisions made part of a Hydraulic Project Approval may request a formal appeal. The request for FORMAL APPEAL shall be in WRITING to the Hydraulic Appeals Board per WAC 259-04 at Environmental Hearings Office,4224 Sixth Avenue SE, Building Two-Rowe Six,Lacey,Washington 98504;telephone 360/459-6327. D. FORMAL APPEALS OF DEPARTMENT ACTIONS TAKEN PURSUANT TO CHAPTER 43.21 L RCW: A person who is aggrieved or adversely affected by the denial or issuance of a Hydraulic Project Approval, or the conditions or provisions made part of a Hydraulic Project Approval may request a formal appeal. The FORMAL APPEAL shall be in accordance with the provisions of Chapter 43.21 L RCW and Chapter 199-08 WAC. The request for FORMAL APPEAL shall be in WRITING to the Environmental and Land Use Hearings Board at Environmental Hearings Office, Environmental and Land Use Hearings Board,4224 Sixth Avenue SE, Building Two-Rowe Six, P.O. Box 40903, Lacey,Washington 98504;telephone 360/459-6327. E. FAILURE TO APPEAL WITHIN THE REQUIRED TIME PERIODS RESULTS IN FORFEITURE OF ALL APPEAL RIGHTS. IF THERE IS NO TIMELY REQUEST FOR AN APPEAL, THE DEPARTMENT ACTION SHALL BE FINAL AND UNAPPEALABLE. ENFORCEMENT OFFICER:Sergeant Jackson (29)P1 �H�abitat hirato 360-427-2179 "'7t �1 ��. for Director ologist i WDFW CC: Grace Miller, Mason DCD, P.O. Box 279,Shelton,WA 98584. Page 5 of 5 ( ^� _ PERMIT NO. ��� DATE RECEIVED: MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT RESOURCE ORDINANCE(Chapter 17.01 MCC) 411 N.5TH Street/P.O.Box 279.Shelton,WA 98584 FJMVIRONMENTAL PERMIT APPLICATION MASON ENVIRONMENTAL PERMIT CONDITIONAL USE❑ VARIANCE❑ The purpose of the Resource Ordinance Is to protect Mason County's natural resource lands and critical areas and is under the authority of Chapters 36.32,36.70A,39.34,58.17.76.09,84.33.84.34 and 90.58 RCW. PLEASE PRINT 1. kAYnacna0 s j3sFRgAKA SEf3<}5T-"4j,/ -/0}91 NE MoRl43f}�RJ;P�•8 tit wp Owner. I�RRCN E ICANN•r- r'•b^^^—. Owner Mailing Address:10a2U_WQljJEA✓F tt,/(FLAr4ETH) Site Address:/0tw3 N wnoruc,,.or- e.� City:�EAisLE State:W/ _Zip:-`73Lr -City: CLF 1Q State WA Zip: Lied]'ideHolder: -- Phone:Daytime l�13-GYo Z.l Li s: Fire District# x Stato: Zip: Signature: sre"-nRN M",.Nc-ADDRess; O(dn 7uRKE('772Acic LFFL LLE 954.6i 2' Parcel Number:3 cAP-X t f- - SO - 6n Ol q Legal description:5Ee,;I '�,�T Nf Q D 3 t.✓ PL 3 aa So -oo0 TR 34 ; 3 c — t. Parcel Size: t g 3 Directions to Site: Foow o Ig F e✓au pt4 W SF}T l&Av1< A60 LAIC-:5- -M NoRiH-SF}sQE .A'D 51 iNy� nt= 7r,tit LA a 51ksF tARK nr� 7H�„/n�= I ia coo�h-rE.l./ o rnt S 4. State what sections require a permit: In-Holding Lands,Chapter 17.01.062 ❑ Long-Term Commercial Forest,Chapter 17.10.060❑ Wetlands,Chapter 17.01.070 ❑ Mineral Resource Lands,Chapter 17.01.066 ❑ Frequently Flooded Areas,Chapter 17.01.090 ❑Aquifer Recharge Areas,Chapter 17.01.080 ❑ Landslide Hazard Areas,Chapter 17.01.100 ❑Erosion Hazard Areas,Chapter 17.01,104 ❑ Seismic Hazard Areas,Chapter 17.01.102 ❑ Fish and Wildlife Habitat Conservation Areas,Chapter 17.01.110 5. Identify current use of property with existing improvements: i 1 1 y r /kAA t l y' i2F C1 nC t 6' Identify and describe the proposed project,including the type of materials to be used,construction methods, principle dimensions and other pertinent information(Attach additional sheets ifneeded): I�tNT- I USF Pic RA T_. uc D DoU U PLo o Ttl N14 ! E E o 1 T7o . / c�fi P O Wi u O RT L7URE. / J4 D I Ll GV 7. Any water on or adjacent to property:Saltwater ® Lake ❑ River❑pond ❑ Wetland ❑ Seasonal Runoff❑ Other 8. Will there bean alteration of a wetland and/or wetland vegetation area? Yes ❑No 8' If septic is located on project site,include records. NIA Connect to septic? ❑ Community Septic? ❑ Public Weter Supply? u Weil? ❑ 10. Type of Job: New A Add❑ Alt❑ Repair❑ Demolition ❑ Other This permit is granted pursuant to the Resource Ordinance(Chapter 17.01 MCC)and nothing in this permit shall excuse the applicant from compliance with any other federal,state,or local statutes,ordinances,or regulations applicable to this project,but not inconsistent with the Resource Ordinance.The permit may be rescinded pursuant to the event the pennittee fails to comply with the conditions of this ordinance. MASON EWIRONMENTALPFRMrr:$510.0Wo5.00(withmathuper t) MASON CONDITIONAL USE ENVIR.PERMIT;312M.00 MASON RESOURCE ORDNANCE VARIANCE:$1,225,00 REVISED:12-5-2003 HEARINGS EXAMINRR:5350.00 I:tPLANNIN(I%RAGPAC1ENVIRONMENTAL PERMrr APPLICATION oN'STAl�rOA` MASON COUNTY MC DEPARTMENT OF COMMUNITY DEVELOPMENT 4 7 o N = Planning Division �o N Y o~ P O Box 279,Shelton,WA 98584 Mo (360)427-9670 NOTIFICATION OF INCOMPLETE APPLICATION December 06,2004 RAYMOND SEBASTIAN 10731 NE NORTH SHORE RD BELFAIR WA 98528 Parcel No.: 322245000018 Project Description: joint use pier ramp and float 6'x 65'fixed pier constructed of douglas fir,4'x 40'aluminum ramp,two floats (6'x 8'and 8'x 60')that consist of fully enclosed in extruded polyethylene, polystyrene floatation 14 piles will be driven to support structure. pier and floats will be grated Dear Applicant: You have submitted a permit application (case no. MEP2004-00091)for proposed construction or development in the county. Upon review of your application, I have determined that the contents of the application are incomplete or do not provide enough detail for review. Therefore, review of your application will not proceed until the necessary information is provided (see the comment section of this letter for details.) Once the information is submitted and the application is complete, I will continue to process your application accordingly. If the additional information is not provided to the County within 180 days of this request,the application shall expire and no further action on the proposed development shall take place. Please contact me at(360)427-9670,ext. 577 if you have questions. i TMr La Mason County Planning Department 121612004 Page 1 of 2 MEP2004-00091 i NOTIFICATION OF INCOMPLETE APPLICATION 12/6/2004 Case No.: MEP2004-00091 Comments: A review of the submitted materials indicates that the Biological Evaluation(BE)is forthcoming. Since the BE satisfies the Habitat Management Plan requirement for the Mason Environmental Permit, the SEPA will be issued upon receipt of the BE. If you have questions or require clarification on this issue, please contact me. 12/6/2004 Page 2 of 2 MEP2004-00091 1 BEFORE THE HEARING EXAMINER FOR MASON COUNTY 2 Phil Olbrechts,Hearing Examiner 3 RE: Lorren&Jeannie Fladseth FINDINGS OF FACT, CONCLUSIONS 4 and Raymond&Barbara OF LAW AND FINAL DECISION. 5 Sebastian 6 Shoreline Substantial Development (SHR2004-00027) 7 8 9 INTRODUCTION 10 The applicants have requested a shoreline substantial development permit to construct a pier,ramp and float structure on Hood Canal. The Examiner denies the requested 11 permit. 12 ORAL TESTIMONY 13 See transcript. 14 EXHIBITS 15 Exhibit 1: January 6,2005 Staff Report 16 17 Exhibit 2: April 27,2005 Photographs(9)of Hood Canal north shore shoreline 18 Exhibit 3: May 4, 2005 Photographs (5) of existing piers on the north shore of Hood Canal in the vicinity of the project area. 19 Exhibit 4: May 4, 2005 Photographs (5)of the Port of Allyn Public Boat Ramp 20 and Marina 21 Exhibit 5: November 7,2004 Mason County Environmental Checklist 22 Exhibit 6: March 5,2005 SEPA Mitigated Determination of Nonsignificance 23 24 Exhibit 7: November 4,2004 Joint Aquatic Resources Permit Application Exhibit 8: March 17, 2005 Affidavit of Publication of Notice of Shoreline 25 Management Permit (ASB613135.D0C;1/13009.900000/( Fladseth/Sebastian P. 1 Findings,Conclusions and Decision Exhibit 9: November 4,2004 Shoreline Permit Application 1 2 Exhibit 10: March 21, 2005 Comments received from Washington State Department of Ecology 3 Exhibit 11: April 27,2005 Letter from Joseph Farmer 4 5 Exhibit 12: March 15,2005 Letter from Doris Gennotti 6 Exhibit 13: April 15, 2005 Letter from Northshore Neighbors for an Uncluttered Shoreline 7 8 Exhibit 14: March 29,2005 Hydraulic Project Approval(WDFW) 9 Exhibit 15: Mason Environmental Permit 10 Exhibit 16: June 23, 2004 Findings of Fact, Conclusions of Law and Final Decision regarding Robert Evans, Shoreline Substantial Development 11 (SHR 2004-00006) 12 Exhibit 17: January 28, 2005 Biological Evaluation, Marine Surveys and 13 Assessments 14 Exhibit 18: Curriculum Vitae,Charles Mead McCoy III 15 Exhibit 19: Flow chart of Dock,Piers and Float Impacts 16 Exhibit 20: June 16, 2005 Draft Priority Habitat and Species Management 17 Recommendations from Stephen Penland,Washington Department of Fish and Wildlife 18 Exhibit 21: October 29, 1999 SHBSW, Final Findings of Fact, Conclusions of 19 Law and Order,SHB No.99-011(Shearer) 20 Exhibit 22: January 19,2005 Central Puget Sound Growth Management Hearings 21 Board,State of Washington,Final Decision and Order,case No.04-3- 0013(Samson/Hacker/City of Bainbridge) 22 23 Exhibit 23: May 12,2005 Revised Plan(overhead)View 24 Exhibit 24: May 12,2005 Revised Plan Elevation View 25 Exhibit 25: September 2003, Assessing Overwater Structure-Related Predation Risk on Juvenile Salmon,Williams,et al. (ASB613135.DOC;1/13009.900000/) Fladseth/Sebastian p.2 Findings,Conclusions and Decision 1 Exhibit 26: Photographs from Lorren Fladseth 2 Exhibit 27: May 3, 2005 electronic-mail from Greg Fladseth to Amy Leitman 3 transmitting May 1,2.005 letter of support 4 Exhibit 28: Raymond and Barbara Sebastian Comments to Staff Report 5 Exhibit 29: July 28, 2005 letter from Northshore Neighbors for an Uncluttered 6 Shoreline supporting staff recommendation 7 Exhibit 30: August 9, 2005 Comments in Support of Staff Recommendation from 8 Northshore Neighbors for an Uncluttered Shoreline Exhibit 31: August 9,2005 letter from Skykomish Natural Resources, Skykomish 9 Nation in support of staff recommendation for denial 10 Exhibit 32: Page 206 from "Hood Canal, Splendor at Risk" by the Staff of the 11 Bremerton Sun,1991,submitted by Bonnie Ruff 12 Exhibit 33: City of Bellevue: Summary of Effects of Bulkheads and Piers and 13 other Artificial Structures in Shore Development Zone Develo ment on ESA- listed Salmonids in Lakes 14 FINDINGS OF FACT 15 Procedural: 16 1. Applicant. The applicants are Lorren and Jeannie Fladseth and Raymond 17 and Barbara Sebastian. The applicants' agent and representative is Amy Leitman of 18 Marine Surveys and Assessments. 19 2• Hearing. The Hearing Examiner conducted a hearing on the subject application on August 9, 2005, at 1:00 p.m., in the Mason County Board of 20 Commissioners Meeting Chambers. 21 Substantive: 22 3. Site Description/Proyosal. The site address and project location is 10731, 23 10741 and 10743 North Shore Road,Beifair,Section 24,Township 27 and Range 03 West. The project site contains two single-family residences. Several other 24 residences exist east and west of the proposed PRF location. The project site is 25 designated as Rural under the Comprehensive Plan and Urban under the Shoreline Management Program,and is zoned Rural Residential 5. t ASB613135.DOC;1/13009.900000/t Fladseth/Sebastian p.3 Findings,Conclusions and Decision I This proposal involves construction of a pier,ramp,and float structure("PRF'). The 2 proposed structure consists of a 6'by 65'fixed pier with 10 pilings and a 4'by 40' ramp leading to a 6' wide by 8'long float with two float pilings. Attached at a right 3 angle to this float applicants propose an 8' by 40' float,as revised,with two float pilings. The total length of the PRF is proposed not to exceed 115'from the ordinary 4 high water mark of Hood Canal. 5 4. Characteristics of the Area. The general area is characterized by 6 residential construction along the north shore of Hood Canal. Waterfront residences are immediately east and west of the project site. No private residential PRF 7 structures are in the immediate vicinity of the proposed project area. Moorage-ball buoys serve as the predominant form of anchorage for private residences in the area. 8 Many anchored floating platforms are also in existence along the notch shore for recreational use by private residents. To the southwest]of the proposed project area, 9 approximately one-quarter mile from the proposed project site,the Shore Hill Estates 10 Home Owners Association maintains a seasonal PRF for its approximately 50 resident members. The majority of existing PRFs that do exist along this portion of 11 the north shore of Hood Canal are non-conforming structures under the current structural design requirements found in the Mason County Shoreline Master Program. 12 The Port of Allyn maintains a Public Boat Ramp and Marina at milepost 4.6 on North 13 Shore Road,approximately 6.1 miles from the proposed project site. 14 5. Adverse Impacts. The Biological Evaluation(Exhibit 17)established that the proposed structure is not likely to adversely affect aquatic habitat or wildlife. The 15 direct effects from the proposed project may cause some short-term impacts on the listed fish species from the turbidity and noise caused by the pile-driving. Indirect 16 effects over the long-term might include alteration of nearshore juvenile salmon 17 migratory pathways, increase in salmonid predation, reduction in refugia due to shading of the epibenthic substrate by the structure and increased boat use. 18 County staff Charles McCoy testified as to the desire to follow the "do no further 19 harm ecologically" principle stated in Marine Riparian: An Assessment of Riparian Functions in Marine Ecosystems by Brennan and Culverwell, Washington State Sea 20 Grant Program(2004). Mr. McCoy stated Brennan and Culverwell advocate in the 21 final recommendation section the need for a greater scientific certainty before continuing further to develop shorelines,including a determination of the cumulative 22 impacts of shoreline development and land use practices. 23 Marty Ereth,a habitat biologist for the Skykomish Tribe,testified that Hood Canal is 24 in a crisis with water quality and dissolved oxygen levels at an all time low. 25 ' Applicant Barbara Sebastian testified that the compass was actually "northeast" of the proposed project area. (ASB613135.DOC;1/13009.900000/) Fladseth/Sebastian p.4 Findings,Conclusions and Decision Mr.Ereth briefly described a technical report prepared by the Point No Point Treaty 1 Council in 2003 mapping shoreline modifications throughout Hood Canal and the 2 eastern Strait of Juan de Fuca, showing that lower Hood Canal was the most negatively impacted. He stated that while it is difficult to analyze cumulative effects 3 and assess the additional impact from a single PRF,any analysis should conclude that that the northern and southern shores of Hood Canal have already exceeded any 4 reasonable threshold of impact. 5 Also,as stated in Finding of Fact No. 4 above, no private residential PRF structures 6 are in the immediate vicinity of the proposed project area. The placement of a PRF would obstruct views. These impacts are not compatible with the natural and 7 unobstructed view characteristics of the north shore shoreline. 8 Finally,recreational opportunities would be adversely impacted by the proposed PRF structure. Applicants' consultant testified that beach walkers would be underwater 9 without the presence of the PRF but did not submit evidence showing that swimmers, 10 kayakers and other recreational boaters would not be adversely affected. 11 6. SEPA Compliance and Public Comment A Mitigated Determination of Nonsignificance was issued on March 5, 2005 for the Th 6 .Exhibit proposal ( ) e 12 SERA comment period ended March 21 2005. The Notice of Sh oreline horeline Substantial 13 Development Permit was published on March 10 and 17, 2005 (Exhibit 8). The comment period ended April 16, 2005. A comment letter was received from 14 Washington Department of Ecology(WDOE)and is attached(Exhibit 10). 15 CONCLUSIONS OF LAW 16 Procedural: 17 1. Authority of Hearing Examiner. MCC 15.03.050(J) provides the 18 Examiner with the authority to review and issue a final decision upon Shoreline Substantial Development Permits. 19 Substantive: 20 21 2. Shoreline Desi ation. The shoreline designation of the site is Urban per the Mason County Shoreline Master Program. This area is considered a Shoreline of 22 Statewide Significance;therefore the requirements under MCC 7.24.010 apply. 23 3. Permit Review Criteria: Section 15.09.055(a)MCC requires a substantial development permit for any substantial development within the shoreline jurisdiction. 24 Section 15.09.055(f) MCC requires that applications for substantial development 25 permits be subject to review by the Hearing Examiner. Section 15.09.055(f)(2)(C) MCC provides that the Examiner shall base a decision on a substantial development I ASB413135.DOC;III 3009.900M) Fladseth/Sebastian p.5 Findings,Conclusions and Decision permit application on the Shoreline Master Program for Mason County("MCSMP") 1 and the policies and procedures of chapter 90.58 RCW, the Shoreline Management 2 Act ("SMA"). Chapter 7.08 MCC defines a substantial development as any development of which total cost for market value exceeds$5,000 or any development 3 that materially interferes with any normal public use of the water or shorelines of the state. The staff report indicates that the proposal will exceed $5,000 in cost and, 4 therefore, requires a shoreline substantial development permit. The MCSMP is codified as Title 7 of the Mason County Code. The applicable shoreline policies are 5 quoted and addressed below. 6 MCC 7.16.170 (Policy No. 1): Piers and docks should be designed and located to 7 minimize obstruction of views and conflicts with recreational boaters and fishermen. 8 4. This particular shoreline has so few existing residential PRFs that any new PRF would be highly disruptive to shoreline views. However, there is no testimony 9 or evidence in the record to suggest that the PRF could be modified in any way to 10 minimize view obstruction. In requiring minimization,MCC 7.16.170 addresses the design of piers and docks. It does not serve as grounds for denying a pier or dock. 11 Absent any evidence that the PRF could be further modified to minimize impacts (other than not building one at all), the Examiner finds consistency with MCC 12 7.16.170. 13 MCC 7.16.170 (Policy No. 2): Cooperative uses of piers and docks are favored, 14 especially in tidal waters. 15 5• The applicants have submitted a request for a joint PRF. 16 MCC 7.16.170 (Policy No. 3): The type, design and location of docks and piers 17 should be compatible with the shoreline area where they are located. Consideration should be given to shoreline characteristics, tidal action, aesthetics, adjacent land 18 and water uses, water quality and the habitat offish and wildlife. 19 6. As discussed in Finding of Fact No. 5, the proposed PRF will have significant adverse aesthetic impacts. These impacts are not compatible with the 20 unobstructed view characteristics of the shoreline. Nor is the location compatible 21 with fish habitat when cumulative affects are considered as discussed below. For these reasons,the proposal is not consistent with MCC 7.16.170,Policy No.3. 22 It is recognized that aesthetics has a tenuous role in land use regulation, but the 23 limited authority on the subject does allow for decision making to be based upon aesthetics alone. Two Mason County Shorelines Hearings Board cases are on point. 24 In Gennotti v. Mason County, SHB 99-011, Final Findings of Fact, Conclusions of 25 Law, and Order (October 29, 1999), the applicant sought a Shoreline Substantial Development Permit to construct a one-owner pier, ramp and float on Hood Canal. (ASB613135.DOC;1/13009.900000/( Fladseth/Sebastian p.6 Findings,Conclusions and Decision As in the case at hand,there were few existing docks and piers in the area. Adjacent I property owners objected to the loss of their unobstructed view. In denying the 2 permit,the Shorelines Hearings Board held that the proposal was not consistent with the policies of the Mason County Shoreline Master Program which requires that the 3 design minimize obstruction of views, preference of cooperative uses, and compatibility and aesthetics. The Shorelines Hearings Board stated that in their 4 inquiry "We are guided by the overall objectives of the SMA and the MCSMP that seek to promote and enhance the public interest in all shorelines,but for shorelines of 5 statewide significance the interest of all people shall be paramount." Id., at 9,citing 6 RCW 90.58.020. 7 Similarly, in Viafore v. Mason County, SHB 99-033, Final Findings of Fact, Conclusions of Law, and Order (September 14, 2000), the applicant sought a 8 shoreline substantial development permit to construct a pier, ramp and float on 9 Pickering Passage. In denying the permit,the Shorelines Hearings Board stated: 10 The proposed dock is not consistent with the cited policies and use regulation from the SMP. The Bauer dock would be the first dock approved under the SMA 11 in an area with only one other existing dock structure that predates the SMA. In this context the proposed dock is not compatible with the shoreline. The proposed 12 dock will also unduly impact the views on an extensive shoreline with almost no dock development. In terms of both compatibility and view impacts,considerable 13 weight must be given to the possibility that similar docks will be sought by 14 property owners on Pickering Passage if the permit here is allowed to stand. The cumulative effect of such development would be inconsistent with the cited 15 policies and regulations. It would allow for the substantial degradation and corresponding reduction in public rights resulting from multiple docks on what is 16 now a relatively pristine shoreline environment. In a case such as this it is critical 17 to consider the cumulative impacts of a proposed development. Buechel, 125 Wn.2d at 210; Hayes v. Yount, 87 Wn.2d 280 (1976)(Logic and common sense 18 suggest that numerous projects,each having no significant effects individually, may well have very significant effects when taken together.); Bellevue Farm 19 Owners Assn. v. Shorelines Hearings Board, 100 Wn. App. 341, 362 (2000). 20 Viafore,at 7. 21 The Examiner finds Gennotti and Viafore persuasive. As in those cases, the PRF 22 structure is proposed for a largely unobstructed shoreline where cumulative impacts could be very significant. The project would have severe view impacts. 23 Turning to location in relation to fish habitat, Applicants' consultant, Amy Leitman, 24 testified that there is no question that underwater structures may alter migration 25 routes. Ms. Leitman further testified there are also studies that indicate that salmon migration is not affected by the presence of overwater structures and concludes that AS B613135.DOC;1/13009.900000/1 Fladseth/Sebastian p.7 Findings,Conclusions and Decision no one has shown that these migration changes lead to increased mortality or 1 decreased fitness. Marty Ereth quoted the opposite conclusion from the Simenstad 2 and Nightingale 2001b report, relied on by Ms. Leitman, as follows: "fo)verwater structures have been proved to pose potential mortality and fitness risk to these 3 animals(estuarine and nearshore fish and shellfish)and their ecosystems." 4 MCC 7.16.170 (Policy No. 5): Mooring buoys and floats are preferred over piers and docks. 5 6 7. Mooring buoys and floats serve are predominant in the immediate vicinity of the project area and in general along the north shore of Hood Canal. The Examiner 7 finds that placement of a PRF structure is not consistent with this policy. 8 MCC 7.16.170 (Policy No. 6): Joint use stairways are preferred over piers and docks. 9 10 8. The plans were modified to reflect the proposed PRF would be accessed by one stairway from the Fladseth property. 11 MCC 7.16.170(Use Regulation No. 1): The location and design of docks and piers, 12 as well as the subsequent use,shall minimize adverse effects on fish,shellfish,wildlife 13 and water quality. 14 9• As detailed in the Biological Evaluation, the PRF has minimal shoreline environmental impacts. The PRF is designed to minimize shading of the aquatic 15 environment. The pile spacing is designed to allow sediment transport. No artificial lighting is proposed. The Biological Evaluation did not consider cumulative effects 16 of the build-out of PRFs along the shoreline as will be discussed below. 17 MCC 7.16.170 Use Reg ulation gelation No.2): Docks and piers shall be located,designed 18 and operated to not significantly impact or unnecessarily interfere with the rights of adjacent property owners, or adjacent uses. Structures shall be located at a 19 minimum of five feet from side property lines. Community use or joint use facilities 20 may be located on the property line. 21 10. The site plan reflects the structure will be placed on the shared property line of the adjoining applicants. An adjacent property owner submitted a letter 22 objecting to the issuance of the permit and the plea for help to"maintain the natural beauty of our shoreline." To the extent that MCC 7.16.170,Policy No. 3,provides a 23 "right'of natural and unobstructed shoreline views, that right has been significantly 24 impacted and interfered with as discussed in Conclusion of Law No.6. 25 MCC 7.16.170 (Use Regulation No. 4): No pier, dock, or float or similar device shall have a residential structure constructed upon it. (ASB613135.DOC;1/13009.9000001) Fladseth/Sebastian p. 8 Findings,Conclusions and Decision 1 11. No residential structure is proposed upon the structure. 2 MCC 7.16.170 (Use Regulation No.7): Maximum overall length of a recreational 3 pier dock facility including floats shall be only so long as to obtain a depth of three feet of water as measured at mean low lower low water on a saltwater or a depth of 4 five feet as measured from ordinary low water on lakes. The length of any pier or dock facility shall not extend the lesser of 15 percent of the fetch or 100 feet from 5 ordinary high watermark on saltwater and 50 feet on freshwater shorelines. Joint 6 or community use facilities may be an additional fifteen feet in length, and shall not exceed a depth of minus five(-5)feet. 7 12. The PRF is proposed at a total length of 115 feet,which is the maximum 8 allowed length of the pier. Washington State Department of Ecology staff commented that"it would appear that the portion of the dock located on the Sebastian 9 property exceeds the 115-foot length from the Ordinary High Water Mark." (Exhibit 10 10) Applicants' consultant testified that the revised plans reflect that the dock was shortened sixteen feet by removing a ramp. The terminus of the PRF is above the 11 0.0' of mean lower low water. As revised, the project complies with the criterion above. 12 13 MCC 7.16.170 (Use Regulation No. 9): The width of recreational piers and docks shall not exceed eight feet. 14 13. The maximum proposed width of the two attached floats is eight feet. 15 MCC 7.16.170(Use Regulation No.10): At the end of a dock or pier,afloat may be 16 attached These floats may either be parallel to the dock or pier, or form a "T"or 17 "L." In tidal water, the float shall not exceed 600 gross square feet with the boat slip. 18 14. The float surface is 320 square feet. 19 MCC 7.16.170 (Use Regulation No. 13): The recreational pier shall be no higher 20 than eleven feet above mean higher high water. Piers and docks shall have at least 21 an eight foot span between pilings. 22 15. The proposed pier height is approximately two feet above mean higher high water. The span between pilings appears to be between 14 and 20 feet and well 23 in excess of the minimum of eight feet as required. 24 MCC 7.16.170(Use Regulation No.14): The surface of floating structures shall be 25 a minimum of eight inches above the surface of the water. (ASS613135.DOC;1/13009.900000/) Fladseth/Sebastian P.9 Findings,Conclusions and Decision 16. This is included in the project description. 1 2 MCC 7.16.170 (Use Regulation No. 15): All floating structures shall include intermittent supports to keep structures off the tidelands at low tide. 3 17. This is included in the project description. 4 5 RCW 90.58.020(1): Recognize and protect the state-wide interest over local interest. 6 18. County staff noted that the cumulative impact of piers and docks is an issue that has received limited consideration in permit review. The north shore of 7 Hood Canal has not seen the magnitude of proliferation of individual and joint piers and docks that has become commonplace along the south shore. 8 9 Kim Van Zwalenburg of the Department of Ecology commented: 10 I have concerns about this proposal in an area with few docks. Hood Canal is a Shoreline of Statewide Significance and the proliferation of 11 docks is an issue on this water body. (Exhibit 10) 12 As stated in Conclusion of Law No. 6, the Shorelines Hearings Board reversed the County's granting of a substantial development permit for a 45-foot PRF based 13 primarily on impacts including obstruction of views and conflicts with recreational 14 uses, as well as adverse impacts on fish, shellfish, wildlife and water quality. Gennotti v. Mason County, SHB No.99-011. In the Gennotti case, the Board 15 concluded that: 16 [alpproval of the proposed pier-dock and float would pave the way for 17 similar projects in the area,thus encouraging a cumulative negative impact on the shoreline. Additional structures, like the one proposed could only 18 exacerbate the adverse impact on the threatened Hood Canal summer Chum and alter the character of the immediate vicinity. 19 Gennotti,p.10-11. The Board further concluded that: 20 21 [W]e are not persuaded that accommodating [the applicants] desire for greater convenience outweighs the public interest in protecting this 22 shoreline of statewide significance as fully as possible. `The Legislature contemplates the protection of private property rights only if extraordinary 23 circumstances are shown and the public interest suffers no substantial detrimental effect.' Lund [v. Department of Ecology, 93 Wn.App. 327, 24 969 P.2d 1072(1998)]at 337,citing RCW 90.58.100(5). 25 Gennotti,P. 10. )ASB613135.DOC;1/13009.900000/) Fladseth/Sebastian P. 10 Findings,Conclusions and Decision I Similarly, the Examiner is not persuaded that the applicants' desires outweigh the 2 public interest in an area that is currently largely devoid of any overwater structures. 3 RCW 90.58.020(2): Preserve the natural character of the shoreline. 4 19. The Examiner is aware that the shoreline is not pristine and contains several bulkheads. Nonetheless,PRF structures do not preserve the natural character 5 of the shoreline,especially on the North Shore where PRF's are rare. As mentioned 6 previously,the proposal will affect the natural views of the shoreline both singularly and cumulatively. 7 8 RCW 90.58.020(3): Result in long-term over short-term benefit. 20. The proposal meets the special needs of the current property owner. The 9 proposal will have long-term, probably permanent, view impacts with no public 10 benefit. For these reasons,the proposal is inconsistent with RCW 90.58.020(3). 11 RCW 90.58.020(4): Protect the resources and ecology of the shoreline. 12 21. The PRF is designed to protect the resources and ecology of the shoreline, but the cumulative impacts of setting a precedent for PRF construction on the North 13 Shore have not been addressed. 14 RCW 90.58.020(5): Increase public access to publicly owned areas of the 15 shorelines. 16 22. The proposed PRF will not increase nor will it decrease public access to 17 shorelines. 18 RCW 90.58.020(6): Increase recreational opportunities for the public in the shoreline. 19 23. The proposed project does not increase recreational opportunities for the 20 public. Recreational opportunities for beach walkers, swimmers, kayakers and other 21 recreational boaters may be hindered by the proposed PRF at times depending on the tide. 22 RCW 90.58.020(7): Provide for any other element as defined in RCW 9a58.100 23 deemed appropriate or necessary. 24 24. No apparent conflict seen. 25 )AS 8613135.1)M I/13009.9000M) Fladseth/Sebastian P. 11 Findings,Conclusions and Decision DECISION 1 2 The Examiner denies the requested shoreline substantial development application. 3 Dated this3�day August,2005. 4 5 Phil Olbrechts 6 Mason County Hearing Examiner 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 {ASa613135.D0C;1/13 009.900000/ Fladseth/Sebastian p. 12 Findings,Conclusions and Decision 1 i his n0tne Of M NLJ consPICIJOLISly displayed at the site of work, United States Army Corps of Engineers ACID I v 2J05 A permit to INSTALL JOINT USE PIER.RAMP,TWO FLOATS,ONE STEEL PM AND 12 PILES OF ACZA Tfl BER PUM TO PROVIDE JOINT USE RECREATIONAL ACCESS IN HOOD CANAL. near BELFAnL MASON COUNTY.WASH[NGTON has been issued to MR.LORRENAm Ms.JEANNIEFLADSETH AND MR.RAYMOND AND MS BARBARA SEBASTAIN on AUC 10 2005 Address of Permittee 10248217 AVENUE SOME WEST.SEATTLE.WASHINGTON 98146 AND 5066 TURKEY TRACK ROAD.PLACERVILLEAND 5066 TURKEY TRACK ROAD. C��95667 Permit Number 200401431 DEBRA COLONEL, G]NEERS DISTRICT COMMANDER ENG FORM 4336.Jul Bt (ER 11452-M) E XnON OF JUL 70 MAYBE USED (PAW-vt DAEN-C ) I I DEPARTMENT OF THE ARMY SEATTLE DISTRICT,CORPS OF ENGINEERS - P.O.BOX TOSS SEATTLE,WASHINGTON 98124.3755 REPLY TO ATTENTION OF AUG 10 2005 Regulatory Branch ,� RECEI, V ��: f�}t: Mr.and Mrs.Lorren and Jeannie Fladseth 426 10248 2151 Ave SW Seattle,Washington 98146 and Mr.and Mrs.Raymond and Barbara Sebastian 5066 Turkey Track Road Placerville,CA 95667 Reference: 200401431 Fladseth and Sebastian Dear Mr.And Mrs.Fladseth and Sebastian: The U.S.Army Corps of Engineers,(Corps)regulatory program provides for the authorization of certain work that is minor in nature,would not have significant individual or cumulative impacts on the environment,and should encounter no appreciable opposition by a type of permit known as a"Letter of Permission"(LOP). After reviewing your application for Department of the Army authorization to install pier,ramp,two floats and 13 piles,we have determined that the proposed work meets these requirements and is authorized by this LOP. The proposed work would occur in Hood Canal near Belfair,Washington. The purpose of the proposed project is to provide joint use recreational access. We have assigned your permit Reference Number 200401431. Please include this reference number in all future correspondence with us concerning this permit. Your authorization to conduct the proposed work under this LOP is contingent upon you conducting the work as shown in the enclosed drawings dated May 12,2005,which are made part of this permit;in compliance with the enclosed Letter of Permission General Conditions; and the following special conditions: a. You must implement and abide by the ESA requirements and/or agreements set forth in the`Biological Evaluation Fladseth and Sebastian Joint-Use Pier,Ramp,and Float Project", dated January 10,2005,and the addendum dated February 15,2005,in their entirety. The U.S.Fish and Wildlife Service(USFWS)concurred with a finding of"may affect,not likely to adversely affect"based on this document on June 3,2005(USFWS Reference Numb 1-3-05-I- 0312). The National Marine Fisheries Service(NMFS)concurred with a finding of"may affect, not likely to adversely affect"based on this document on July 12,2005(NMFS Reference Number 2004/00402). Both agencies will be informed of this permit issuance. Failure to comply -2- with the commitments made in this document constitutes non-compliance with the ESA and your Corps permit. The USFWS/NNIFS is the appropriate authority to determine compliance with ESA. b. In order to protect Chinook salmon,bull trout,Hood Canal summer chum and forage fish, the permittee may conduct the authorized activities from July 16 through September 14 in any year this permit is valid. The permittee shall not conduct work authorized by this permit from September 15 through July 15 in any year this permit is valid. c.A copy of this permit,permit drawings,mitigation planting plan,final authorization letter, and joint-use agreement shall be recorded with the Registrar of Deeds and proof provided to the Corps,within 60 days after final Corps authorization,to ensure that subsequent property owners are aware of the construction,use,and mitigation requirements. As this authorization is for a joint-use pier,all co-applicants must voluntarily agree to build no additional overwater structures on their property,except for the maintenance or modification of the joint-use overwater structure. This voluntary agreement and the documentation described above must be recorded on the deeds of all involved properties. d. You must provide a copy of the permit transmittal letter,the permit form,and drawings to all contractors performing any of the authorized work. e. The permittee understands and agrees that,if future operations by the United States require the removal,relocation,or other alteration,of the structure or work herein authorized,or if,in the opinion of the Secret of the Arm or his authorized representative,said structure or > P Secretary Y eP work shall cause unreasonable obstruction to the free navigation of the navigable waters,the permittee will be required,upon due notice from the U.S.Army Corps of Engineers,to remove, relocate,or alter the structural work or obstructions caused thereby,without expense to the United States. No claim shall be made against the United States on account of any such removal or alteration. Please be reminded that Special Condition"a"of your permit requires that you implement and abide by the ESA requirements and/or agreements set forth in the Biological Evaluation for this project. In particular,note that the BE requires that you:to record and implement joint use agreement,implement the shoreline planting plan,monitor and submit monitoring reports on the planted area to the Corps and Services annually for a period of 5 years,and record the location and description of the planting area on your deed. Failure to comply with the commitments made in the BE constitutes non-compliance with the ESA and your Corps permit. Your authorization to conduct the proposed work under this permit expires AUG 10 M Please remember that failure to comply with the terms and conditions of this LOP,including any special conditions,invalidates your authorization and could result in a violation of Federal law. -3- Any change in the plans for this work will require that you submit revised drawings to this office and receive our written approval of those changes prior to conducting the work. Upon completing the authorized work,you must fill out and return the enclosed Certificate of Compliance with Department of the Army Permit form to the address indicated on the form. Your signature on this form is our assurance you have conducted the work and any required mitigation in accordance with the terms and conditions of this LOP,including all special conditions. We have reviewed your project pursuant to the requirements of the Endangered Species Act (ESA). After consulting with the National Marine Fisheries Service and/or U.S.Fish and Wildlife Service,we have determined that this project will meet the requirements of the ESA provided you comply with special conditions"a"through"b"listed above. We have also reviewed your project pursuant to the requirements of the Magnuson-Stevens Fishery Conservation and Management Act,as amended by the Sustainable Fisheries Act of 1996,and determined that the proposed action will not adversely affect Essential Fish Habitat for federally managed fisheries in Washington. Under the provisions of the Corps'Regulatory Program Administrative Appeal Process,you have the right to appeal this permit decision in accordance with the enclosed Notification of Administrative Appeal Options and Process and Request For Appeal. If we have not received an objection from you within 60 days of the date of this letter,or if you conduct the authorized work,we will presume that you have accepted,and will comply with,all terms and conditions of this LOP. While this project will not require further authorization from us,please note that it must comply with all State,local,and other Federal requirements that may apply. For example,you may need to obtain a Shoreline Substantial Development Permit from Mason County and/or a Hydraulic Project Approval from the Washington Department of Fish and Wildlife. You should also contact the Washington State Department of Natural Resources before starting work for a determination of leasing requirements for work over submerged lands. For further information, we recommend you contact the Washington Department of Ecology's Permit Assistance Center at(800)917-0043 or,on the Internet,at http://www.ecy.wa..eovlproerams/sea/pac/. Thank you for your cooperation during the permit process. Your efforts help us protect our nation's aquatic resources. Please remember to fill out and return the compliance certification form within 30 days of completing the authorized work. We are interested in your thoughts and opinions concerning your experience with the U.S.Army Corps of Engineers,Seattle District's Regulatory Program. Please complete a Customer Service Survey form. The form is available on our website at:http://per2.nwp.usace.anny.mil/survey.html. At your request,we will mail you a paper copy that you may complete and return to us by mail or fax. -4- A copy of this letter with enclosures is being furnished to Ms Amy Leitman, 521 Snagstead Way,Port Townsend,Washington 98368. If you have any questions about this letter or our regulatory program,please contact Olivia Romano at telephone(206)764-6960 or e-mail Olivia.H.Romano@mace.anny.mil. BY AUTHORITY OF THE SECRETARY OF THE ARMY: Debra M.Le 's Colonel,Corps Enginee District Engineer Enclosures � I cc: USFWS ECOLOGY DNR LOCAL GOVERNMENT 123°01.000' W W1G684 123000.000' W 4. 24 0 Fladseth Pi a ,, >• :; � App:Marine Surveys&Assessments in:Hood Canal near Belfair �t •_+ +a :t Parpow.-Recreational use of pier ramp and float. Pltldaet4/sebastia0PMjeceLoagou: --------_____..___._..._.._._. - Dawn:ACLW Adjapept Prpperty 4wmn: ` Sectiat W,Township 22N,Range 03W 1)Allen&Gana Blade �• 10731/10743 North Shore Rd Bollidr,WA 2)Heleae Kmdm 1r I AL .;.; 47�2.77'LAW 123000.79' ,,:s"�" sheet 1 of 4 Date:C+ctober-2T, 123001.000' W WGS84 123000.000' W TN I1IIN 0 1/2 1 MILE �• 18`l=o --NW FEET 0 500 1000 m aD0 a(01431 0 10' 21 App:Marine Surveys&Assessments In:Hood Canal near Belfair Purpose:Recreational use of pier ramp and float. Datum:MLLW ..�Adjacent Property Owners: NORTH SHORE ROAD 1)Allen&Getia Black 2)Helene Krasko ET AL Sheet 2 of 4 Date:October 27,2004 All dimensions are approximate 0 1 j 1 g 13' SEBA5TIAN + \/ l FLADSETH as 4 _ Bulkhead ' i 15' Wood deck LARGE EXISTING FIR Stairs to beach SEE PHOTOGRAPHS IN PIORtIng K" It should be noted that in THE BE Bulkhead addition to the 3 oceanspray TN 5t' shrubs and shorepine along the MN ! bulkhead,there are the ®vaclno dogwood + following included in the Proposed pier, planting plan: qW.PW. ram and float 2 ocean and I O o«wny PL p Pacific dogswo&ood on the HOOD CANAL west side of the Flodseth residence 2 vine maple and 1 shorepine 1 500'to pier,ramp and float between the Flodseth and Sebastian residences 3 vine maple and 1 dogwood on the northern edge of the + PL Sebastian property 5', AS TO BEAtTEEAEL BASTIA, . LAWN BULKHEAD IRS TO L FLAD5ETH WOOD DEACH BULKHEAD PILING Corrected ACZA PILING depth (one of 12) -4.6' 50%OF PIER GRATED 6' 65' c�D 01 `f 9 115' App:Marine Surveys&Assessments In:Hood Canal near Belfair Purpose:Recreational use of pier ramp and float. Datum:MLLW Adjacent Property Owners: 10' 1)Allen&Gena Black 2)Helene Krasko ET AL t/ Sheet 3 of 4 Date:October 0004 t Ramp will be fuily grated TN MN 34 4 P FLADSETH/SEBASTIAN HOOD CANAL REVISED PLAN VIEW MAY 12,2005 6'WIDE FLOAT 2'WIDE&RATING B 4'WIDE&RATING y 40' - G by 65 pier FLAOSETH WOOD DECK 4'by 40'romp MHHw Fully grated 12.r —_ AAF�v IAW ACZA PILING SINGLE tq (One of 12) STEEL PILING T.20 o Y f bats Mu.w____ Corrected depth «4.6' 10' SERASTUN Float stops LAWN on the small float FLADSETH / SEBASTIAN PROJECT a2 Bp q o 1 4 3/ Revised elevation view App:Marine Surveys&Assessments Revised May 12,M In:Hood Canal near Belfair Purpose:Recreational use of pier ramp and float. Datum:MLLW Adjacent Property Owners: 1)Allen&Gena Black ,/� � 2)Helene Krasko ET AL /!{,Yj dril✓/, Sheet 4 of 4 Date:October 27,2004 Charles McCoy III Re:Request for a continuance fro case#SHR2004 00027(Fladseth&Sebastian) Page 2 I Port Townsend,WA 98360 Phone:360 385-4073 Fax: 360 385-1724 Cell: 360 301-0262 Email:sea@cablespeed.com -----Original Message---- From:"Charles McCoy III'<ChuckM@co.mason.wa.us> To:<sea@cablespeed.com> Cc:"Susie Ellingson"<Sme.mail.Mason@co.mason.wa.us>; <polbrechts@omwlaw.com> Sent:Thursday,June 09,2005 3:22 PM Subject:Request for a continuance fro case#SHR2004-00027(Fladseth &Sebastian) Dear Mr.Olbrechts: Amy Leitman,Agent for the Applicants,has requested a continuance on the hearing date scheduled for 14 June 2005 before the Hearing Examiner for case#SHR2004-00027 as of today 9 June 2005. The completed application for this case was received and logger on 28 January 2005. It is becoming a case that has been on the docket for a substantial amount of time. It is in my opinion unnecessary to continue the hearing date scheduled above,a second time,without adequate do cause. I was informed by Susie Ellingston,Planning Department Administrative Professional,that Ms. Leitman made the request to better prepare and do research for the case. It is my opinion that adequate time has been allowed for preparation for this case. Respectfully, Charles Mead McCoy III Planner Mason County CC: "Susie Ellingson"<Sme.mail.Mason@co.mason.wa.us>,"Charles McCoy III' <ChuckM@co.mason.wa.us>,"Ray&Barb Sebastian"<basebastian@gscdc.com> I� Charles McCoy III Re:Request for a continuance fro case#SHR2004 00027(Fladseth&Sebastian) Page 1 From: "Amy Leitman"<sea@cablespeed.com> To: <polbrechts@omwlaw.com> Date: 6/9/2005 4:34:11 PM Subject: Re:Request for a continuance fro case#SHR2004-00027(Fladseth&Sebastian) Hello Mr.Olbrechts, I was astounded to read the below email message and hear about the continuance being unnecessary.Yes the case has been on file for a long time however,the first and only request up until this day for an extension was made by Charles Mead McCoy III,planner,Mason Co.We did not fuss over this request,as we recognized that if he needed time to review this case in more detail,his first dock project review for Mason Co.,we were fine with his need to understand all of the pertinent information.I discussed this case with him and offered him the titles of the many citations that we use in our review of the biological impacts of a dock project within Puget Sound.Being that there is a large amount of literature on the subject,a continuance seemed appropriate.My help was offered. The proponents and myself have just received a copy of the staff report at the beginning of this week(June 6,2005),a mere 3 days ago.After reviewing the report,we recognized that with all of staffs concerns(many more than I had originally been made aware of through conversations with Charles Mead McCoy III),a lawyer might be necessary to help address those concerns that fall outside of the purview of biology.1 am completely prepared for representing the clients in terms of biology,however,I am not a land-use attorney,nor profess to be an adequate representative in a controversial case in terms of aesthetics and view impacts within Mason County.As you know from the previous Robert Evans case on Northshore Road where Mr.Dennis Kenney represented the opposition to a dock on the Northshore(as he has done for this case on paper),a lawyer representing the proponents interpretation of pier and dock use regulations may have been a much more just situation.In this case,my clients after reviewing the new staff report,have realized that it might be in their best interest to hire representation on land-use issues in addition to my biological expertise. Why Mr.McCoy did not mention his disapproval about this continuance request when I spoke with him today,I do not know.If indeed this case is in danger of being dropped because of our continuance request,we will without question attend our hearing date on June 14,2005.1 do not know the ramifications of having Charles Mead McCoy III's feelings about our first continuance request accepted.If you too feel that our first request of a continuance after receiving a copy of the staff report three days ago is unnecessary,please let me know so that I can be sure to inform my clients about the hearing this coming Tuesday.I wonder what the impact to Mason Co. is by asking for our first extension of a shoreline hearing?After dozens of project representations in Mason Co.,this is my first request,I hope that you can accept that this is not my common practice,but a first time request that I feel is necessary to allow my clients the ability to attain reasonable and appropriate representation. Respectfully, Amy R.Leitman Marine Surveys&Assessments 521 Snagstead Way MASON COUNTY Shelton (360)427-9670 DEPARTMENT OF COMMUNITY DEVELOPMENT Belfair (360)275-4467 Planning Mason County Bldg.� 411 N 5th Elma (360)482-5269 P.O.Box 279 Shelton,WA 98584 Dennis Kenny 5�3r/oS Vice President Northshore Neighbors for an Uncluttered Shoreline 426 Yale Avenue N. Seattle, WA 98584 As per your request I am contacting your organization to inform them that a hearing will be conducted on 14 June 2005, Tuesday in the Commissioners' Chambers,Courthouse Building I,411 N. 51h Street,Shelton, Washington concerning the Substantial Development Permit/Shoreline Management Permit application submitted for approval for a joint pier, ramp and float on the northshore of Hood Canal. The joint applicants are Fladseth and Sebastian(SHR2004-00027). You are welcome to participate in the Hearing Examiner process and give oral testimony, in addition to your written comments that will be submitted as attachments to my Staff Report to the Hearing Examiner. My submitted Staff Report will be recommending denial of the application on the premise that the cumulative impact to esthetics along the northshore of Hood Canal,a "water of statewide significance", under Mason County's Shoreline Master Plan and Washington State's Shorelines Management Act of 1971 has and or will be adversely affect the natural beauty of Hood Canal by the incremental encroachment of individual and joint pier, ramp and float structures over time. Respectfully; Charles McCoy III Planner Mason County Department of Community Development Tel: 360/427.9670 ext: 294 Email: chuckm@co.mason.wa.us MASON COUNTY Shelton (360)427-9670 E,cr DEPARTMENT OF COMMUNITY DEVELOPMENT Belfair (360)275-4467 2-Itq Planning Mason County Bldg.1 411 N.5th Elma (360)482-5269 P.O.Box 279 Shelton,WA 98584 Dear Ms.Gennotti: I am writing to inform you that the hearing date for the Sebastian&Fladseth joint pier, ramp and float shoreline permit request will be conducted on May 10,2005 at 1PM in Building 1 Commissioners Chambers. The proposal is to place the structure on the property line between the two joint- applicants properties. Sincerely, Charles Mead McCoy III Planner Mason County because of their ability to be replaced and maintained in there current non-conforming state. These structures would not be permitted today because of their non-compliant, structural design flaws. The Port of Allyn maintains a Public Boat Ramp and Marina at milepost 4.6 on the North Shore Road,approximately 6.1 miles NE from the proposed project site(Attachment 3). Characteristics of the site. The site contains two single-family residences. Several other residences exist east and west of the proposed pier,ramp and float location. Mooring ball buoys could be anchored offshore of both residences,and in combination with two individual,unattached,recreational,floats of not to exceed 400 square feet each(Mason County Shoreline Master Program,Chapter 7.16.170). Comprehensive Plan Desijznation. The Mason County Comprehensive Plan designation for the site is Rural. Shoreline Master Program Designation. The Shoreline Master Program designation for the site is Urban. Zoning. The parcel is zoned Rural Residential 5(RR-5). SEPA Compliance and other public notice requirements. The proposal was reviewed under SEPA,SEP2004-00103(Attachment 4). Please find attached posted and circulated for agency review Mitigated Determination of Nonsignificance(Attachment 5). Please find attached Joint Aquatic Resources Permit application form(Attachment 6). Please find attached Affidavit of Publication of Notice of Shoreline Development Permit (Attachment 7). Please find Attached Shoreline Permit application(SHR2004-00027) (Attachment 8). Comments were received from Washington Department of Ecology (Attachment 9)and would be incorporated into the conditions required for Building Permit approval. No other comments were received from other agencies. Three letters were received from the public in opposition to the proposed project(Attachments 10, 11 and 12). Other Permits. The proposal will require a Mason County Building Permit. A Hydraulic Project Approval was issued from Washington Department of Fish and Wildlife(WDFW)(Attachment 13).Washington Department of Ecology Water Quality Protection Concurrence,and US Army Corps of Engineers(ACOE)NWP approvals are also necessary.A Mason Environmental Permit was also required with Staff review (MEP2004-00091)(Attachment 14). Analysis. Per the Mason County Shoreline Master Program(SMP),this proposal requires a Shoreline Substantial Development permit due to the cost exceeding$5,000 per Section 7.13.010 and by reference to the Project Classifications matrix,Chapter 7.16. The proposal is for a pier on an Urban-designated shoreline. Piers and Docks Policies are: 1.Piers and docks should be designed and located to minimize obstruction of views and conflicts with recreational boaters and fishermen. Impacts will result from the emplacement of thisibintpier,ramp and float(PRF). This particular shoreline along the north shore has so few existing residential PRFs in the immediate area as to cause substantial impact to the view-aesthetics along this shoreline of Statewide Significance. An additional impact to access to views along the north shore is the potential loss of beach-walking activity by local residences desiring to enjoy the aesthetics of Hood Canal as a result of over-water structure build-out. The Hearing Examiner has previously rule)in a similar case regarding aesthetics along the north shore with Evans(SHR2004-00006),in which the Hearing Examiner denied the permit primarily of the basis of aesthetic criteria(Attachment 15). In a different case that went before the Shorelines Hearing Board State of Washington (SHB No.99-011)reversed the County of its granting of a Substantial Development Permit for 91illiam and Paula Shearer(SHR99-00004)for a 45 foot pier,ramp and float along the Hood Canal at approximately 6 miles from the City of Belfair on the North Shore Road. The Board based its Decision primarily on impacts to obstruction of views and causing conflicts with recreational uses,as well as,adverse impacts on fish, shel ph,wildlife and water quality.In addition the Board found "that approval of the proposed pier-dock and float would pave the way for similar projects in the area, thus encouraging a cumulative negative impact on the shoreline. Additional structures,like the one proposed could only exacerbate the adverse impact on threatened Hood canal summer Chum and alter the character of the immediate vicinity."(Attachment 20). The City of Bainbridge Island and the State of Washington Department of Ecology recently had a decision before the Central Puget Sound Growth Management Hearings Board,State of Washington(Case No.04-3-0013)in which the Synopsis stated that the City assessed cumulative impacts due to 'projected dock build-out"in Blakely Harbor on "navigation,scenic views,aquatic resources and recreational use,and by and extensive record." It also stated that the Board found"the Petitioners failed to meet their burden of demonstrating that the City's action was clearly erroneous."And "The Board found that Petitioners failed to present "clear and convincing evidence of error" in Ecology's approval of the amendment."(Attachment 21). 2.Cooperative uses of piers and docks are favored,especially in tidal waters. The Applicants have submitted a request for a joint pier,ramp and float. 3. The type,design and location of docks and piers should be compatible with the shoreline characteristics,tidal actions,aesthetics,adjacent land and water uses. The compatibility of the shoreline location criterion has not been met,as described above in Section Y,Evaluations:Characteristics o the area. The private residential pier,ramp and floats(PRF)in the vicinity are non-conforming in nature and would not be permitted today under current structural design criteria. Photographs were taken of these non- conforming structures that are at a significant distance from the proposed project area (Attachment 2). As stated earlier in the Report the pre-dominate use in the immediate vicinity of the project area is of mooring buoys and anchored floats. 4. Priority should be given to the use of community piers and docks in all new waterfront subdivisions. In general,encouragement should be given to the cooperative use of piers and docks. A public boat ramp and marina facility exists,and is operated by the Port of Allyn at a distance of approximately 6.1 miles NE along the North Shore Road from the proposed project area. 5.Mooring buoys and floats are preferred over piers and docks. As stated earlier the prevailing use in the immediate vicinity,and in general along the north shore of Hood Canal by private residents is to have mooring buoys and floats in the waters offshore of their properties. 6. Joint use stairways are preferred over individual stairways. As design in the Biological Evaluation submitted the joint pier, ramp and float will have separate access capability from both adjoining property owners(i.e. the Applicants). 7. Boathouses and covered moorages shall be discouraged. Not applicable. Applicable Piers and Docks Use Regulations are: 1.The location and design of docks and piers,as well as the subsequent use shall minimize adverse effects on fish,shellfish,wildlife and water quality. As detailed in the Biological Evaluation,the shoreline environmental impacts of this structure are minimal. The float and ramp additions have been configured to pose little or no threat to natural resources. Staff cites the biological evaluation as informative in this aspect. However, it is Staffs professional biological opinion to "Do No Further Harm"ecologically as stated in Marine Riparian:An Assessment of Riparian Functions in Marine Ecosystems, by James S.Brennan and Hilary Culverwell, Washington State Sea Grant Program. They advocate in the final Recommendations section the need for greater scientific certainty before continuing further to develop shorelines;in particular they state in a list of data needs# "9. Determine the cumulative impacts of shoreline armoring and other shoreline development and land use practices on marine riparian vegetation and marine riparian vegetation functions." In addition,as cited in Ovrwater Structures:Marine Issues. by Barbara Nightingale and Charles Simenstad, University of Washington, in the sub-section titled:Ovrwater Structure E ects they state that "The impacts of altered light environments upon juvenile salmonid physiology and behavior are well documented(Ali 195(9], 1962;Browman et al. 1993;Coughlin and Hawryshyn 1993;Dera and Gordon 1968;Fields and Finger 1954;Hawryshyn and Harosi 1993;Nemeth 1989;Novales-Flamique and Hawryshyn 1996;Puckett and Anderson 1987)."and "Changes to ambient underwater light environments pose a risk of altering fish migration behavior and increasing mortality risks." Recently received from Washington Department of Fish and Wildlife,Habitat Program, Environmental Services Division, Titled:DRAFT Washington Department of Fish& Wildlife Priority Habitat and Species Management Recommendations Forage Fish Spawning Habitats(Penttila,2005)addresses some of the concerns of"Overwater Structures"on page 10 of the document,stating "Herring spawning habitat,however, may be significantly impacted by shading from overwater structures,grounding of floats, and accumulation ofshell fragments that fall from the structure(Burkle pers. Comm). Studies have shown that there are no species of marine macro-vegetation that can tolerate the footprint of a typical overhead dock or pier, including plant species used by spawning herring(WDFW unpub.Data). Introduction of these fixed overwater structures invariably results in a die-off of vegetation directly beneath and may also show negative impacts on either side."(Attachment 19). 2. Docks and piers shall be located,designed and operated to not significantly impact or unnecessarily interfere with the rights of adjacent property owners,or adjacent water uses. Structures shall be located a minimum of five feet from side property lines. Community use or joint use facilities may be located on the property line. Per the site plan the structure will be placed on the shared property line of the adjoining applicants'. One letter was received from an adjacent property owner opposing the project and stating "We object to the issuance of this permit"and "Please help us maintain the natural beauty of our shoreline."(Attachment 10). 4. No pier,dock,or float or similar device shall have a residential structure constructed upon it. None proposed. 7. Maximum overall length of a recreational pier or dock facility including float shall be only so long as to obtain a depth of three feet of water as measured at mean lower low water on saltwater or a depth of five feet as measured from ordinary low water on lakes. The length of any pier or dock facility shall do exceed the lesser of 15 percent of the fetch or 100 feet of OHWM on saltwater and 50 feet on fresh water shorelines. Joint or community use facilities may be an additional 15 feet in length,and shall not exceed a depth of minus five(-5)feet. When sufficient depth to serve a vessel is not found at these depths,a recreational float,with one boat slip,may be located at a depth sufficient to serve the vessel,but not exceeding minus eight(-8)feet as measured from mean lower low water,on marine shores,and ordinary low water on lake shores. The pier,ramp and float(PRF)as proposed at a total length of 115', which is the maximum allowed length for a pier,perhaps does not meet the criteria based upon the argument that the actual OHWM is 16 feet farther toward the shore than has been contemplated by the Biological Evaluation(Attachment 16). The comments submitted by Kim van Zwalenburg, Shorelines Specialist with Washington Department of Ecology, indicate that an issue may exist surrounding the placement of the PRF on the property line "In addition, it would appear that the portion of the dock located on the Sebastian property exceeds the 115 foot length from the Ordinary High Water Mark."(Attachment 9). The terminus of the pier(afloat)is above the 0.0'of mean lower low water. 9.The width of recreational piers and docks shall not exceed eight feet. The maximum proposed width of the two attached floats is eight feet. 10. At the end of a dock or pier,a float may be attached. These floats may either be parallel to the dock or pier,or form a"T"or"L". IN tidal water,the float shall not exceed 600 gross square feet with a boat slip. The float surface area is 480 square feet. 13. Recreational piers shall be no higher than 11 feet above mean higher high water. Piers and docks shall have at least an eight-foot span between pilings. Pier height is 2'above mean higher high water. The span between pilings appears to be 14 feet and well in excess of the minimum of 8 feet as required. 14.The surface of floating structures shall be a minimum of eight inches above the surface of the water. As configured. 15.All floating structures shall include intermittent supports to keep structures off the tidelands at low tide. As configured. Applicable guidelines for Shorelines of Statewide Significance in the following order of Preference are: #1: Recognize and protect the statewide interest over local interest; As stated in the comments submitted by Kim Van Zwalenburg, Washington Department of Ecology "I have concerns about this proposal in an area with few docks. Hood Canal is a Shoreline of Statewide Significance and the proliferation of docks is an issue on this water body." Staff notes that the cumulative impact of piers and docks is an issue that has received limited consideration in permit review. The north shore of Hood Canal has not seen the magnitude of proliferation of individual/joint residential piers and docks that has become commonplace along the south shore. As noted in previous staff reports to the Hearing Examiner,the south shore has been significantly altered by the high-density of piers and docks along its shoreline. The question posed is whether we want to establish the incremental increase of these types of overwater structures that will almost certainly progress toward another zone of high-density of piers and docks along the north shore like that of the already significantly altered south shore. #2: Preserve the natural character of the shoreline; Pier,ramp and float structures do not preserve the natural character of the shoreline. #3: Result in long term over short term benefit; The long term benefits of a more natural appearing shoreline is supported by the three letters of opposition to the proposal, that stated their desire for an uncluttered shoreline along the north shore of Hood Canal. It is Staffs opinion that the comments received from Washington Department of Ecology also contents that there is a long term issue of cumulative impact of on a water such as the Hood Canal from the proliferation of docks along its shoreline(Attachment 9). #4: Protect the resources and ecology of the shoreline; The ecological concerns were previously stated in Applicable Pier and Dock Use Regulations(1), with particular emphasis given to juvenile salmonid behavioral alterations and survival. As an addition to the earlier argument with regard to juvenile salmonid survival or mortality,I have attached a representational flow diagram that illustrates the interconnectedness of alteration in ambient light intensity caused by "Dock,Pier and Float Impacts"(Nightingale and Simenstad 2001)(Attachment 18). #5: Increase recreational opportunity for the public in the shoreline; Private, residential,piers and docks do not generally complement the general public recreational interests. The interference with access to residences of the area to beach- walking and to recreational sportfishers is a concern. #6: Provide for any other element as defined in RCW 90.58.100 deemed appropriate or necessary. No apparent conflict foreseen. Conclusions:Based upon these policies and regulations,the project appears to be inconsistent with most of the Shoreline Master Program Policies,Use Regulations and Shorelines of Statewide Significance Preferences regarding piers and docks.Staff recommends denial. Choices of Action. 1. Approval. 2. Approve with conditions. 3. Deny(reapplication or resubmittal is permitted). 4. Deny with prejudice(reapplication or resubmittal is not allowed for one year). 5. Remand to for further proceedings and/or evidentiary hearing in accordance with Section 15.09.090 of Title 15. MASON COUNTY Shelton (360)427-9670 DEPARTMENT OF COMMUNITY DEVELOPMENT Belfair (360)275-4467 Planning Mason County Bldg,1 411 N.51h Elma (360)482-5269 P.O.Box 279 Shelton,WA 98584 Joseph Farmer 10651 NE Northshore Road PO Box 2122 Belfair, WA 98528 As per your request I am contacting you to inform you that a hearing will be conducted on 14 June 2005, Tuesday in the Commissioners' Chambers, Courthouse Building I,411 N. 5th Street, Shelton, Washington concerning the Substantial Development Permit/Shoreline Management Permit application submitted for approval for a joint pier, ramp and float on the northshore of Hood Canal. The joint applicants are Fladseth and Sebastian(SHR2004- 00027). You are welcome to participate in the Hearing Examiner process and give oral testimony, in addition to your written comments that will be submitted as attachments to my Staff Report to the Hearing Examiner. My submitted Staff Report will be recommending denial of the application on the premise that the cumulative impact to esthetics along the northshore of Hood Canal,a "water of statewide significance", under Mason County's Shoreline Master Plan and Washington State's Shorelines Management Act of 1971 has and or will be adversely off ect the natural beauty of Hood Canal by the incremental encroachment of individual and joint pier, ramp and float structures over time. Respectfully; Charles d Mc����� Coy III Planner Mason County Department of Community Development Tel: 360/427.9670 ext: 294 Email: chuckm@co.mason.wa.us MASON COUNTY Shelton (360)427-9670 DEPARTMENT OF COMMUNITY DEVELOPMENT Belfair (360)275-4467 Planning Elma (360)482-5269 Mason County Bldg.I 411 N.5th P.O.Box 279 Shelton,WA 98584 Doris Gennotti U S 6311 NE Northshore Road Belfair, WA 98528 As per your request I am contacting you to inform you that a hearing will be conducted on 14 June 2005, Tuesday in the Commissioners' Chambers, Courthouse Building I,411 N. 51h Street, Shelton, Washington concerning the Substantial Development Permit/Shoreline Management Permit application submitted for approval for a joint pier, ramp and float on the northshore of Hood Canal. The joint applicants are Fladseth and Sebastian (5HR2004- 00027). You are welcome to participate in the Hearing Examiner process and give oral testimony, in addition to your written comments that will be submitted as attachments to my Staff Report to the Hearing Examiner. My submitted Staff Report will be recommending denial of the application on the premise that the cumulative impact to esthetics along the northshore of Hood Canal,a "water of statewide significance", under Mason County's Shoreline Master Plan and Washington State's Shorelines Management Act of 1971 has and or will be adversely affect the natural beauty of Hood Canal by the incremental encroachment of individual and joint pier, ramp and float structures over time. Respectfully; Charle Me McCoy III Planner Mason County Department of Community Development Tel: 360/427.9670 ext: 294 Email: chuckm@co.mason.wa.us