HomeMy WebLinkAboutArmy Corps of Engineers - PLN General - 8/10/2005 I
DEPARTMENT OF THE ARMY
SEATTLE DISTRICT,CORPS OF ENGINEERS
- P.O.BOX TOSS
SEATTLE,WASHINGTON 99124-3755
REPLY TO
ATTENTION OF AUG 10 2005
Regulatory Branch R E C E"'v
Mr.and Mrs.Lorren and Jeannie Fladseth 426 W
10248 2151 Ave SW
Seattle,Washington 98146
and
Mr.and Mrs.Raymond and Barbara Sebastian
5066 Turkey Track Road
Placerville,CA 95667
Reference: 200401431
Fladseth and Sebastian
Dear Mr.And Mrs.Fladseth and Sebastian:
The U.S.Army Corps of Engineers,(Corps)regulatory program provides for the
authorization of certain work that is minor in nature,would not have significant individual or
cumulative impacts on the environment,and should encounter no appreciable opposition by a
type of permit known as a"Letter of Permission"(LOP). After reviewing your application for
Department of the Army authorization to install pier,ramp,two floats and 13 piles,we have
determined that the proposed work meets these requirements and is authorized by this LOP. The
proposed work would occur in Hood Canal near Belfair,Washington. The purpose of the
proposed project is to provide joint use recreational access. We have assigned your permit
Reference Number 200401431. Please include this reference number in all future
correspondence with us concerning this permit.
Your authorization to conduct the proposed work under this LOP is contingent upon you
conducting the work as shown in the enclosed drawings dated May 12,2005,which are made
part of this permit;in compliance with the enclosed Letter of Permission General Conditions;
and the following special conditions:
a. You must implement and abide by the ESA requirements and/or agreements set forth in
the`Biological Evaluation Fladseth and Sebastian Joint-Use Pier,Ramp,and Float Project',
dated January 10,2005,and the addendum dated February 15,2005,in their entirety. The
U.S.Fish and Wildlife Service(USFWS)concurred with a finding of"may affect,not likely to
adversely affect'based on this document on June 3,2005(USFWS Reference Numb 1-3-05-I-
0312). The National Marine Fisheries Service(NMFS)concurred with a finding of"may affect,
not likely to adversely affect'based on this document on July 12,2005(NMFS Reference
Number 2004/00402). Both agencies will be informed of this permit issuance. Failure to comply
2
with the commitments made in this document constitutes non-compliance with the ESA and your
Corps permit. The USFWS/NMFS is the appropriate authority to determine compliance with
ESA.
b. In order to protect Chinook salmon,bull trout,Hood Canal summer chum and forage fish,
the permittee may conduct the authorized activities from July 16 through September 14 in any
year this permit is valid. The permittee shall not conduct work authorized by this permit from
September 15 through July 15 in any year this permit is valid.
c.A copy of this permit,permit drawings,mitigation planting plan,final authorization letter,
and joint-use agreement shall be recorded with the Registrar of Deeds and proof provided to the
Corps,within 60 days after final Corps authorization,to ensure that subsequent property owners
are aware of the construction,use,and mitigation requirements. As this authorization is for a
joint-use pier,all co-applicants must voluntarily agree to build no additional overwater structures
on their property,except for the maintenance or modification of the joint-use overwater structure.
This voluntary agreement and the documentation described above must be recorded on the deeds
of all involved properties.
d. You must provide a copy of the permit transmittal letter,the permit form,and drawings to
all contractors performing any of the authorized work.
e. The permittee understands and agrees that,if future operations by the United States
require the removal,relocation,or other alteration,of the structure or work herein authorized,or
if,in the opinion of the Secretary of the Army or his authorized representative,said structure or
work shall cause unreasonable obstruction to the free navigation of the navigable waters,the
permittee will be required,upon due notice from the U.S.Army Corps of Engineers,to remove,
relocate,or alter the structural work or obstructions caused thereby,without expense to the
United States. No claim shall be made against the United States on account of any such removal
or alteration.
Please be reminded that Special Condition"a"of your permit requires that you implement
and abide by the ESA requirements and/or agreements set forth in the Biological Evaluation for
this project. In particular,note that the BE requires that you:to record and implement joint use
agreement,implement the shoreline planting plan,monitor and submit monitoring reports on the
planted area to the Corps and Services annually for a period of 5 years,and record the location
and description of the planting area on your deed. Failure to comply with the commitments made
in the BE constitutes non-compliance with the ESA and your Corps permit.
Your authorization to conduct the proposed work under this permit expires AUG 10 2008
Please remember that failure to comply with the terms and conditions of this LOP,including any
special conditions,invalidates your authorization and could result in a violation of Federal law.
-3-
Any change in the plans for this work will require that you submit revised drawings to this office
and receive our written approval of those changes prior to conducting the work.
Upon completing the authorized work,you must fill out and return the enclosed
Certificate of Compliance with Department of the Army Permit form to the address indicated on
the form. Your signature on this form is our assurance you have conducted the work and any
required mitigation in accordance with the terns and conditions of this LOP,including all special
conditions.
We have reviewed your project pursuant to the requirements of the Endangered Species Act
(ESA). After consulting with the National Marine Fisheries Service and/or U.S.Fish and
Wildlife Service,we have determined that this project will meet the requirements of the ESA
provided you comply with special conditions"a"through"b"listed above. We have also
reviewed your project pursuant to the requirements of the Magnuson-Stevens Fishery
Conservation and Management Act,as amended by the Sustainable Fisheries Act of 1996,and
determined that the proposed action will not adversely affect Essential Fish Habitat for federally
managed fisheries in Washington.
Under the provisions of the Corps'Regulatory Program Administrative Appeal Process,you
have the right to appeal this permit decision in accordance with the enclosed
Notification of Administrative Appeal Options and Process and Request For Appeal. If we have
not received an objection from you within 60 days of the date of this letter,or if you conduct the
authorized work,we will presume that you have accepted,and will comply with,all terns and
conditions of this LOP.
While this project will not require further authorization from us,please note that it must
comply with all State,local,and other Federal requirements that may apply. For example,you
may need to obtain a Shoreline Substantial Development Permit from Mason County and/or a
Hydraulic Project Approval from the Washington Department of Fish and Wildlife. You should
also contact the Washington State Department of Natural Resources before starting work for a
determination of leasing requirements for work over submerged lands. For further information,
we recommend you contact the Washington Department of Ecology's Permit Assistance Center
at(800)917-0043 or,on the Internet,at http://www.ecy.wa.Qov/proQrams/sea/pac%
Thank you for your cooperation during the permit process. Your efforts help us protect our
nation's aquatic resources. Please remember to fill out and return the compliance certification
form within 30 days of completing the authorized work. We are interested in your thoughts and
opinions concerning your experience with the U.S.Army Corps of Engineers,Seattle District's
Regulatory Program. Please complete a Customer Service Survey form. The form is available
on our website at:http://per2.nwp.usace.armv.mil/survey.html. At your request,we will mail you
a paper copy that you may complete and return to us by mail or fax.
-4-
A copy of this letter with enclosures is being furnished to Ms Amy Leitman,
521 Snagstead Way,Port Townsend,Washington 98368. If you have any questions about this
letter or our regulatory program,please contact Olivia Romano at telephone(206)764-6960 or
e-mail Olivia.H.Romanona,usace.armv.mil.
BY AUTHORITY OF THE SECRETARY OF THE ARMY:
i
Debra M.Le 's
Colonel,Corps Enginee
District Engineer
Enclosures
cc: USFWS ECOLOGY DNR LOCAL GOVERNMENT
123901.000' W WGS84 123000.000' W
D _ 1J.. ✓ 0
0
`y f, �Vt
•' ,tit•
Fladseth
TO
yF
N.' } App:hhu*SwvWs&Assessments
In:Hu d Canal aw Belfair ri
p�Ptrr��poae:-Recreational gse of pier ramp and
RL
R*beWSebasdanProjedLocation: --------_---•-_---. Datap:MLLW
Adjacent Prg"`.t n.
Seetion 24,Township 22N,Range 03W 1)Allen dt C Black }
10731/10743 North Shore Rd.Belfriir,WA :?? 2)Helm ICraslop ET AL
<at:47°22 77' 123°00.79' Sheet 1 of 4 Date:Octobaei 27, —/
123001.000' W WGS84 123000.000' W
TN IllyrlI2 1 hNIE
18`/* 1000 FEET 0 urn 1000m
,:P- 31 0 10' 20�
App:Marine Surveys&Assessments
In:Hood Canal near Belfair
Purpose:Recreational use of pier ramp and
float.
Datum:MLLW
'Adjacent Property Owners: NORTH SHORE ROAD
1)Allen&Geria Black
2)Helene Krasko ET AL 0.v`i �r •0.i f
Sheet 2 of 4 Date:October 27,2004 „f
All dimensions are approximate
1
f
1 g 13' SEBASTIAN
FLADSETH l'�
i '` <
1 6'
f Bulkhead '
15' Wood deck LARGE EXISTING FIR
Stairs to beach SEE PHOTOGRAPHS IN
canny wy It should be noted that in THE BE
Bulkhead addition to the 3 oceanspray TN
51, shrubs and shorepine.along' the MN
1 bulkhead,there are the
Padne dogwood ti following included in the
Proposed pier, planting plan:
R s�ON ramp and float 2 oceanspray and 1
0 o«Qy PL Pacific dogw�ad on the HOOD CANAL
west side of the Flodseth
,d.n a. t ' residence
2 vine maple and 1 shorepine
500'to pier,ramp and float between the Flodseth and
Sebastian residences
3 vine maple and 1 dogwood
r on the northern edge of the
PL Sebastian property
5, ASTO BEAtTEEAEL
BASTIA, . LAWN
BULKHEAD
FLADSETH WOOD DACH O C
BULKHEAD PILING
Corrected ACZA PILING
depth (one of 12)
-4.6'
50%OF PIER
GRATED
6'
65' _ JOOg01 `f3 (
115' App:Marine Surveys&Assessments
In:Hood Canal near Belfair
Purpose:Recreational use of pier ramp and
float
Datum:MLLW
Adjacent Property Owners:
10, 1)Allen&Gena Black
2)Helene Krasko ET AL
Sheet 3 of 4 Date:October 27,2004
Ramp v.ill
be fuily
grated {
TN
NMN
34 4
FLADSETH/SEBASTIAN
HOOD CANAL REVISED PLAN VIEW
MAY 12,2005
6'WIDE FLOAT
—� 2'WIDE&RATING
8 4'WIDE GRATING
40'
6'by 65'pier FLADSM
WOOD DECK
W by 40'romp
M"M Funy grated
12.r_.. MHHW --
Ux IACZtAPILING SINGLE14' of 12) STEEL PILING
20'
MW
u.
oa — fits mow---- Corrected depth=
+4.6' 10'
Foot stops SEBASnAN
P LAWN
on the small float
FLADSETH / SEBASTIAN PROJECT a2 oo Lf p I L/3 J
Revised elevation view App:Marine Surveys&Assessments
Revised May 12,2005 I In:Hood Canal near Beltair
Purpose:Reereatibnal use of pier ramp and
float.
Datum:MLLW
Adjacent Property Owners:
1)Allen&Gena Black
2)Helene Krasko ET AL 4.v u-,t 671
Sheet 4 of 4 Date:October 27,2004