HomeMy WebLinkAboutRLC97-0062 - RLC Inspections - 4/4/1997 MASON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
Planning Division
411 N. Fifth, P.O. Box 578, Shelton, WA 98584
(360) 427-9670
DATE: 04/04/97
TO: TERESA PIERCE
620 W. COTA
SHELTON WA 98584
RE: MOBILE HOME
Case No. : RLC97-0062
Parcel No. : 321275400014
Dear Applicant :
As part of this department ' s review on your permit application, a
Resource Lands and Critical Areas (RLC) site inspection was performed on
your property. Below you will find comments made regarding the proposed
development and its critical values.
In some cases, setbacks for development from steep slopes, streams,
wetlands, and waterbodies must be included in your specific proposal;
these setbacks are included as part of the comments listed below.
Please contact me at (360) 427-9670 or (360) 275-4467, ext . if you
have any questions .
Sincerely,
1
Land Use Planner
Department of Community Development
COMMENTS:
Site is located at the bottom of a natural depression area. During
winter months, surface water runoff might collect along front end of
property. Proper culvert maintenance should be implemented to avoid
significant water surface saturation on site.
RLC, rev. 09/26/96
RESOURCE LANDS & CRITICAL AREAS CHECKLIST
Permit Number 0314 RLC # 14
Owner Parcel #
❑ 1. Saltwater/Lake 20z Acres SMP Designation
Name of Water body
❑ 2. Rivers, streams, or creeks
Type of Water
❑ 3. Lakes or ponds less than 20 acres in size? (Check if yes.)
❑ 4. Wetlands: Areas that are inundated or saturated by surface water that under normal
circumstances support vegetation adapted for life in such conditions as the following:
Marshes, bogs, and swamps. (Check if yes.)
❑ 5. Slopes greater than 15% or 8.50? If yes, degree of slope °
❑ 6. Floodplain? (Check if yes.)
❑ 7. Seismic Hazard Area? (Check if yes.) NO
❑ 8. Aquifer Recharge Area? (Check if yes.) ��,� 0
❑ 9. Comprehensive Plan Designation
❑ 10. Other
Comments: C�� `" G resgt4m a
f rn-w f h6 ( VI n m r
nfi emC.L
�2L 103
Authorized Signature Date
DRAWINGS & ADDITIONAL FINDINGS
6 -
I