HomeMy WebLinkAboutSHX2024-00041 Bridge Replacement - SHX Application - 10/23/2024 I
RECEIVED: RECEIVE
. ._" MASON COUNTY RECEIVED
COMMUNITY DEVELOPMENT OCT 2 3 2024
Permit Assistance Center, Building,Planning 615 W. Alder Street
PERMIT NO.:69XW R - 0(:Oq I
SHORELINE EXEMPTION APPLICATION
Shoreline development in Mason County must conform with the Mason County Shoreline
Master Program. The program requires that substantial development (any development of
which the total cost or fair market value exceeds $8,504.00 or materially interferes with the
normal public use of the water or shorelines of the State) be reviewed with the goals, polices, and
performance standards established in the Master Program.
New or expanded docks or beach access structures will likely require a substantial development permit
instead of a shoreline exemption. Consult with a Mason County Planner.
APPLICANT: Mason County Public Works Department (ATTN: Erik Schwartz)
ADDRESS: 100. W. Public Works Drive
(street)
Shelton WA 98584
(city) (state) (zip)
PHONE: 360.490.1296 EMAIL: eschwartz@masoncounty\lb
AUTHORIZED REPRESENTATIVE:
ADDRESS:
(street)
(city) (state) (zip)
PHONE: EMAIL:
Answer all questions completely. Attach any additional information that may further describe
the proposed development. Incomplete application will be returned.
I
PROPERTY DESCRIPTION:
General location (include property address, water body and associated wetlands—identify the name of the shoreline):
The project is in county road right-of-way, "Crisman Bridge" crossing Dry Bed Creek at Beeville Loop
Road Mile Post 0.58. T 21 N, R 06W, Sec. 27. Dry Bed Creek is Type S Water (Conservancy SED).
Include all parcel numbers: Projects located in open water areas, away from land shall provide latitude/longitude.
47.273333 lat., -123.428333 long. The project is in County Road right-of-way (Parcel 621270060000),
adjacent to parcel #621270000000 (Green Diamond Resource Company).
Is the applicant the property owner? YES 0 NO
Owner: Mason County, same as applicant
(street) (city) (state) (zip)
Development proposal (identify and describe the proposed project, including the type of materials to be used,
construction methods, principle dimensions, and other pertinent information):
The project is to replace a deteriorating timber laminated slab superstructure with steel
superstructure on the existing 24-foot span bridge. The work will be done from the road and
right-of-way.
Existing Use (identify current use of property with exist improvements):
The work is to maintain the existing 24-foot span bridge and involves no material expansions or
changes in use beyond that previously existing. The bridge superstructure replacement will be the
same size to maintain the existing road uses, footprints, hydraulic openings, clearances over flood
flows, and functions of the structures as currently exist.
Reason for requesting development:
The bridge repair is required maintenance for public safety and road use. Based on Public Works' review
of the project scope and plans, applicant is requesting exemption according to MCC 17.50.400(b)(1)(B).
Estimated Fair Market Value of Project to Closest $1,000: $60,000
ACKNOWLEDGMENT:
I hereby declare, to the best of my knowledge and belief, the forgoing information and all attached information
is true and correct.
Digitally signed by Erik Schwartz
Z� Date:2024.10.22 16:34:59 10/22/24
-07'00'
(Applicant or Authorized Representative) (date)