Loading...
HomeMy WebLinkAboutBLD2023-01427 DEMO - BLD Inspections - 11/25/2024 INSPECTION CARD Mason County 615 W. Alder St. Building 8, Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov PERMIT# BLD2023-01427 PROJECT ADDRESS 6673 E GRAPEVIEW LOOP RD ALLYN, WA 98524 PARCEL# 122322190000 PROJECT DESCRIPTION Demo Old Home OWNER VANNORMAN KENDARA A ADDRESS 6673 E GRAPEVIEW LP RD PHONE CONTRACTOR Buxman Exvtn&Lndscpe LLC ADDRESS 1053 E VICTOR RD PHONE 360-801-3614 CONTRACTOR LICENSE BUXMAEL8470N LENDER INSPECTION INSP DATE Comments INSPECTION INSP DATE Comments Connection has been verified by I Demolition Final Inspection 1d; Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov [BLD2023-01427 DEMO OJECT DESCRIPTION: DEMO OLD HOME ISSUED: 11/28/2023 TE ADDRESS: 6673 E GRAPEVIEW LOOP RD ALLYN EXPIRES: 05/26/2024 PARCEL: 122322190000 APPLICANT: VANNORMAN KENDARA A OWNER: VANNORMAN KENDARA A 6673 E GRAPEVIEW LP RD 6673 E GRAPEVIEW LP RD ALLYN.WA 98524 ALLYN,WA 98524 CONTRACTOR: Jeff PO Box 909 Belfair,WA 98528 (360)801-3614 GENERAL CONTRACTOR'S LICENSE: Buxman Exvtn &Lndscpe LLC License: BUXMAEL847QN 1053 E VICTOR RD Expires: 12/09/2024 BELFAIR,WA 98528 360-801-3614 FEES: Paid Due State Fee-Residential $6.50 $0.00 Demolition Fee $120.00 $0.00 Technology Flat Convenience $5.00 $0.00 Fee Totals : $131.50 $0.00 REQUIRED INSPECTIONS Connection has been verified by Health or Utilities Demolition Final Inspection CONDITIONS The Washington State Clean Air Act prohibits the burning of any construction or demolition debris in an outdoor fire. Printed by:Nikita Huckabey on:12/28/2023 09:12 AM Page 1 of 2 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov DEMO BLD2023-01427 * Proper erosion and sediment control practices must be used on the construction site and adjacent areas to prevent upland sediments from entering the aquatic environment. Erosion control measures must be in place prior to any clearing, grading, or construction. These control measures must be effective to prevent soil from being carried into surface water by stormwater runoff. Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of state regulations. Any work in or adjacent to waterways that will adversely affect water quality must receive specific prior authorization from the Department of Ecology. Silt fencing, straw matting, etc. must be installed and maintained until seeding or upland vegetation has become established around all areas disturbed or newly created by construction activities. * All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. * For public safety, it is the responsibility of the applicant to confirm through written verification all utility services (electric, gas,water, sewer, ...) have been terminated prior to demolishing a structure. * OWNER/ BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null & void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. " The demolition and disposal of demolition debris must meet requirements as per Mason County regulations. it is unlawful for any person to cause or allow the demolition (or major renovation) of any structure unless all asbestos containing materials have been removed from the area to be demolished.work shall not commence on an asbestos project or demolition unless the owner or operator has obtained written approval from ORCAA @ 2490 B Limited Lane NW, Olympia WA 98502, 360-586-1044, 800-422-5623,www.orcaa.org * All construction debris must be removed from the site after project completion to an approved location. Proper disposal of construction debris must be on land in such a manner that debris cannot enter or cause water quality degradation of aquatic environments. hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other statellocal law regulating construction or the performance of construction. Issued By: Contractor or Authorized Agent: Date: Printed by:Nikita Huckabey on:12/28/2023 09:12 AM Page 2 of 2