HomeMy WebLinkAboutCOM2023-00029 Cellular Equipment, Concrete Pad - COM Inspections - 11/26/2024 MASON COUNTY 615 W.Alder St.Bldg 8,SHELTON,WA 98584
/ SHELTON: 360-427-9670, EXT 352
COMMUNITY SERVICES
BELFAIR:360-275-4467, EXT 352
Buildin%Planninq,Environmental Ilealth Community Ilealdi ELMA:360-482-5269, EXT 352
- www.co.mason.wa.us
INSPECTION CARD AND CERTIFICATE OF OCCUPANCY""
To schedule an inspection call or visit http://www.co.mason.wa.us/community-services/bid-inspection.php
Permit Number COM2023-00029 Date Issued 04/13/2023 Issued By
Project ADD 3 ANTENNAS,PLATFORM MOUNT,JUMPERS&EQUIPMENT,EQUIPMENT CABINET ON 7WCRETE
PAD
Site Address 7621 E STATE ROUTE 3
Applicant WEAVER/AMERICAN TOWER CO
Contractor
Contractor Phone
Primary Code UPC IBC,IRC,IFC, IEC,IMC,& Type
Permit Type NEW COMMERCIAL PERMIT Occupancy
-APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS.
-DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED.
-THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION, FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY.
-ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION.
-OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION.
**THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED."
PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET
Public Works Access/Driveway Other
Health Septic Well
Deptartment
Planning Site Inspection
Department
Fire Marshall Fire Apparatus Access Fire Sprinkler
Auto Fire Alarm Hood and Duct
Other Final
Building Building Official: Community Services Designee
Department
Concrete Setbacks Slab S-l?13 T)CD
Footing Perimeter Point load Footing
Footing Interior Footing Decks/Porches
Foundation Stem Walls Other
Rough-In Groundwork Plumbing Framing
Groundwork Mechanical Plumbing
Groundwork Gas Pipe Mechanical
Gas Piping Shear Wall Nailing
Underfloor
Other
Insulation Slab Ceiling
Floor Vaulted Ceiling
Walls Vapor Barrier
Other
Wallboard Interior Wall Brace Panels Fire Walls
Nailing
Other
Final Building
Manufactured Setbacks Setup
Home
Concrete Foot/Runners Final
Other
Krazan
GEOTECHNICAL ENGINEERING ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING AND INSPECTIONS
November 15, 2024 KA Project No.: 10624231
Joshua Luck Email:jluck@masoncountywa.gov
Mason County(Deputy Building Official) Phone: 360-427-9670
3670 W Dayton Airport Rd
Shelton,WA 98584
Project: SESEA03000B Shelton rV
7621 East State Route 3 k�e�
Shelton, WA 98584
Subject: Final Special Inspe='t
er �e�e� �ZA
Mason County Peo.: COM2023-00029
Dear Mr. Luck,
In response to the request and authorization of Billy Hensen representing Zenisco, Krazan &Associates has provided special
inspection and related construction materials testing services for the SESEA03000B Shelton project located at 7621 East State
Route 3, in Shelton,WA 98584. Our services were performed by our staff November 23, 2024 under the supervision of a
State of Washington registered engineer.
Our observations were documented in our inspector's daily field reports which have been submitted the owner,structural
engineer of record, contractor,and the Mason County building department. Krazan provided special inspection for the
following types of construction at the project site:
Visual Observation of New Tower Attachments
In accordance with Chapter 17 of the 2018 International Building Code,the work requiring special inspection was performed
in conformance with approved plans and applicable standards of workmanship at the time of completion.
Limitations
We have performed our services in a manner consistent with the standard of care and skill ordinarily exercised by forms of
our type practicing under similar conditions at the time and locality our inspection was performed. Please recognize that
construction monitoring is a technique employed to reduce the risk of problems arising during construction. Provision of
construction monitoring by Krazan &Associates personnel is not insurance, nor does it guarantee the construction of any
type. In all cases the contractor shall retain sole responsibility for the quality of their work, adhering to the approved project
plans and specifications and for repairing any defects, deficiencies or omissions, regardless of when they are found. Our
services were limited to the work documented in our reports.We do not undertake the guarantee of construction or
completion of a completed project conforming to the plans and specifications. No warranty expressed or implied.
q%mKrazan
Closing
We trust that this report is sufficient to meet your needs and appreciate the opportunity of working with you on this project.
Should you have any questions, comments or if we may be of additional service to you, please feel free to contact us at your
convenience.
Respectfully submitted,
Krazan &Associates, Inc.
David Digitally signed by David Wright
ON.cn=David Wright,r IJS,
-Kraran&Associates,Inc.,
Wright Date 2024k1524-0900
David Wright, P.E.
Operations Manager
Olympic Peninsula Division
Date Issued: 11/22/2024
=oKrazam Associates, Inc.
Geotechnical Engineering•Environmental Engineering
Construction Testing and Inspection
DAILY FIELD REPORT REPORT NO.: 10624231DFR111324DW-1 Page 1
INSPECTION DATE: November 13,2024 DFR No.: 1 JURISDICTION: Mason County
PROJECT NO.: 10624231 BLDG PERMIT NO.: COM2023-00029
PROJECT NAME: SESEA03000B Shelton ENGINEER OF RECORD: American Tower
CLIENT NAME: Zenisco, Inc. CONTRACTOR: Zenisco
KRZ PM: David Wright WEATHER: Cloudy/Lt Rain TEMP.: 42 F°
As requested by Billy representing Zenisco, I arrived onsite at the SESEA03000B Shelton project located at 7621 East
State Route 3,Shelton,WA.This report presents our purpose and scope,findings, and conclusions.
Purpose and Scope
The purpose of this visit, as requested by Billy, was to perform a visual observation of new tower attachments. Prior to
arrival, I was provided with the construction drawings by American Tower and Westchester Services LLC.
Findings
After reviewing the plans, I walked the site and noted the following new tower attachments to be in place:
Commscope MTC3975083 Sector Fame Mount (1 total)
Cellmax CX12045x Antennas (3 total, 1 per sector)
Samsung RF4450D-70A RRH (3 total, 1 per sector)
Samsung RF4450T-71A RRH (3 total, 1 per sector)
Using a drone and camera, I observed and photographed the above-mentioned equipment and related attachment
hardware.The attachment brackets appear to be in place in conformance with the provided drawings.
Conclusion
Based on our observations,the new tower attachment bracket installations as referenced and at the locations
referenced above,were performed in conformance with the provided drawings.
& ti�
Inspector's Statement of Acceptance:
Acceptable -To the best of my knowledge, the referenced work was performed in general accordance with the approved project
drawings,specifications,and regulatory requirements.
Inspector's Name: D rcgk - Reviewed By: GeoffraT Wz,— 11/22/2024
Version: 2024-09-23 Offices Serving the Western United States Fisher ===X Page 1 of 1
Bakersfield•Clovis•Corona •Exeter• Lancaster•Lynnwood •Modesto• Pleasanton • Poulsbo•Sacramento•San Luis Obispo•Tacoma
Krazan&Associates• 1230 NW Finn Hill Rd Suite A Poulsbo WA 98370• Phone:(360)598-2126
This report,exclusively prepared by Krazan&Associates for the client,contains provisional observations and test results subject to review.Reproduction is prohibited without written consent. Results are specific to
inspected/tested locations and items.
GH
ATC 310511
14250727
Special Inspection Requirements
MASON COUNTY
COMMUNM SERVICES
oil h `tTC DISH SEA 310511 SESEA03000B East 7621 State Route 3, Shelton WA 98584
Permit Number Project Title Project Address/Parcel Number
Applicants of projects requiring Special Inspection or Testing per Chapter 1704&1705 of the International
Building Code, as amended by Washington State. Please acknowledge and return this form to the Mason
County Permit Center.
THESE INSPECTIONS ARE NOT PERFORMED BY THE BUILDING DEPARTMENT AND MUST BE
PERFORMED BY QUALIFIED SPECIAL INSPECTORS, HIRED BY THE OWNER AND APPROVED
BY THE COUNTY PERMIT CENTER. Individuals certified in a special inspection category by
Washington Association of Building officials(WABO)or individuals employed by a recognized testing
laboratory and under the direct supervision of a Registered Professional Engineer are typically
considered qualified at the discretion of the local jurisdiction having authority for enforcement.
BEFORE A PERMIT CAN BE ISSUED: The Owner or his/her representative, on the advice of the
responsible Project Engineer or Architect, shall fill out completely, sign and submit two (2) copies of the
attached"Structural Tests and Inspection Schedule"to this Department for review and approval including
any requirements related to the Mason County Municipal Code.
The Owner, General Contractor, and Inspection/Testing Agency, where applicable, shall also
acknowledge the following conditions applicable to Special Inspection and/or Testing.
1. Inspection/Testing Agency shall submit names and qualifications of on-site Special Inspectors
to the Building Inspection Permit Center for approval PRIOR TO PERMIT/S BEING ISSUED.
2. All Special Inspections shall be noted on the approved plans or attached approved
documents.
3. All special inspections shall be approved by the County or as recommended by the Engineer
of Record (EOR).
4. It is the responsibility of the General Contractor to review County approved plans for additional
inspection or testing requirements that may be noted or required per IBC as noted on
approved plans.
5. The General Contractor is responsible for proper notification to the Inspection/Testing
Agency for items listed on this form.
6. Special Inspectors shall provide detailed reports on company letterhead to the Building
Inspector of all required inspection activities. These may also be provided when the inspector
visits the jobsite for the scheduled inspection but must be completed before the subject of
inspection is approved by the building inspector.
7. Copies of all ongoing laboratory and testing reports shall be sent directly to the Building
Inspector by the Inspection/Testing Agency or other responsible party within a reasonable
time to test results.
8. BEFORE A CERTIFICATE OF OCCUPANCY APPROVAL CAN BE ISSUED: The
Inspection/Testing Agency shall submit a FINAL REPORT LETTER stating that all items
requiring testing and inspection have been fulfilled and reported and a final inspection report
shall be provided. A copy of the statement is to be maintained at the jobsite for the Building
Inspectors review prior to final inspections.
Page 1 of 4
GH
ATC 310511
14250727
MASON COUNTY
COMMUNr1Y Samos
ACKNOWLEDGEMENTS
Prior to issuance of a building permit, the Owner, on the advice of the Project Engineer or Architect, shall
complete,sign,and submit this form to the County Permit Center.
Tower
Declaration of Owner
I,as the owner of the project,declare that the testing agency firms or individuaUs listed herein are hired by me to
perform "Special Inspections" and/or"Structural Testing" in accordance the rovisions of the International
Building code(IBC)Chapter 17. ( I
Margaret Robinson,Vice President,UST Legal for American Tower Asset Sub,LLC By:
Tower Owner(print) Tower Owner(Sig lature) (date)
Declaration of Registered Professional Architect/Engineer
I, as the design professional in responsible charge of the project listed herein, declare that the special
inspection listed herein are required for this project in accordance with the provisions of the International
Building Code(IBC)Chapter 17.
John M. Banks R.A. 11157 REGISTERED
ARCHITECT
Architect/Engineer(print)
Architect/Engineer Stamp/Signature(date)
J(3I 1 M. lEaN'
STATE OF WASHINGTON
Exp.Date:05/11/24
Date_03/03/23
Testing Agency Name/Contact Krazan & Associates, Inc.825 Center Street, Suite A
info: Tacoma, WA 98409
253-939-2500
The Special Inspection/Testing Agency listed above must have a current Portfolio of Qualifications
on file with the County prior to performing work.
Declaration of the General Contractor
I, as the General Contractor of the project, agree to comply with the"Contractor Responsibility"items
noted herein.
General Contractor(print) General Contractor Signature (date)
Page 2 of 4
Special inspection Requirements
MASON COUNTY
COMMUNITY SERVICES
Required Special Inspections
International Building Code; Chapter 17:
A completed and signed copy of pages 1 through 4 of this form shall be submitted to the
"Permit Center" prior to building permit approval.
Engineer shall check the applicable items:
❑ Special inspection of fabricated items 1704.2.5
❑ Submittals to the building official 1704.5
❑ Structures over 75' in height located in Seismic Design Category D, 1704.6.1
❑ Structures classified as Risk Category III or IV located in Seismic Design Category D, 1704.6.1
® Steel construction& structural Steel 1705.2.1
❑ Cold form steel deck 1705.2.2
❑ Open-web steel joists & girders 1705.2.3
❑ Cold form steel trusses spanning 60 feet or greater 1705.2.4
❑ Concrete construction 1705.3 &Table 1705.3
❑ Shotcrete 1705.3
❑ Welding of reinforcing bars 1705.3.1
❑ Material Tests 1705.3.2
❑ Masonry Construction 1705.4
❑ Empirically designed masonry, glass unit& masonry in Risk Category IV 1705.4.1
❑ Vertical masonry foundation elements 1705.4.2
❑ Wood construction 1705.5
❑ High Load Diaphragms 1705.5.1
❑ Metal-plate connected wood trusses spanning 60 feet or greater 1705.5.2
❑ Soils 1705.6 & Table 1705.6
❑ Driven deep foundations 1705.7 &Table 1705.7
❑ Cast in-place deep foundations 1705.8 & Table 1705.8
❑ Helical pile foundations 1705.9
❑ Fabricated items 1705.10
Page 3 of 4
GH
ATC 310511
14250727
Special Inspection Requirements
MASON COUNTY
COMMUNM MV[CES
❑ Special inspections for wind resistance 1705.11
❑ Structural wood 1705.11.1
❑ Wind resisting components 1705.11.3
❑ Cold formed steel light frame 1705.11.2
❑ Special inspection for seismic resistance 1705.12
❑ Special inspection for structural steel per 1705.12.1
❑ Seismic force-resisting systems 1705.12.1.1
❑ Structural steel elements 1705.12.1.2
❑ Special inspection for structural wood per 1705.12.2
❑ Special inspection for cold-formed steel per 1705.12.3
❑ Designated seismic systems 1705.12.4
❑Architectural components 1705.12.5
❑ Plumbing,mechanical & electrical components 1705.12.6
❑ Storage racks 1705.12.7
❑ Seismic isolation systems 1705.12.8
❑ Cold-formed steel special bolted moment frames 1705.12.9
❑Testing for seismic resistance 1705.13
❑ Structural steel 1705.13.1
❑ Seismic fore-resisting systems 1705.13.1.1
❑ Structural steel elements 1705.13.1.2
❑Nonstructural components 1705.13.2
❑ Designated seismic systems 1705.13.3
❑ Seismic isolation systems 1705.13.4
❑ Sprayed fire-resistance materials 1705.14
❑ Physical and visual tests 1705.14.1
❑ Structural member surface conditions 1705.14.2 (1705.14.3 through 1705.14.6.3)
❑ Mastic& intumescent fire-resistance costings 1705.15
❑ Exterior insulation& finish systems(EIFS) 1705.16
❑Fire-resistance penetrations and joints 1705.17
❑ Penetration firestops 1705.17.1
❑ Fire-resistant joint systems 1705.17.2
❑Testing for smoke control 1705.18
❑ Testing Scope 1705.18.1
Page 4 of 4
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
F
3-00029 NEW COMMERCIAL PERMIT
DESCRIPTION: ADD 3 ANTENNAS, PLATFORM MOUNT, ISSUED: 04/13/2023
& EQUIPMENT, EQUIPMENT CABINET ON 5X7 CONCRETE EXPIRES: 10/10/2023
ESS: 7621 E STATE ROUTE 3 SHELTON
PARCEL: 221304300010
APPLICANT: WEAVER/AMERICAN TOWER CO OWNER: WEAVER/AMERICAN TOWER CO
408 S EAGLE RD SUITE 200 408 S EAGLE RD SUITE 200
EAGLE, ID 83616 EAGLE, ID 83616
1.208.938.8844
VALUATIONS: FEES: Paid Due
Project Valuation (BID, 20000.00 $20,000.00 State Fee-Commercial $25.00 $0.00
ESTIMATION..) Planning Commercial Review $380.00 $0.00
Fee
Plan Check Fee $219.68 $0.00
Building Permit Fee $337.97 $0.00
Technology Surcharge $11.15 $0.00
Total: $20,000.00 Totals : $973.80 $0.00
REQUIRED INSPECTIONS
BLD-Final Inspection
CONDITIONS
Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly
corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of
pressure treated material.
All changes to "approved" building plans that effect compliance with the international codes as amended and adopted, or
any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your
"Approved Site Plan"to ensure these structures meet the setback conditions listed.
Printed by:Genie Mcfarland on:04/13/2023 08:40 AM Page 1 of 3
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
lip Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
NEW COMMERCIAL PERMIT COM2023-00029
" When parcel development requires direct access to county road(s), a Road Access Permit or Approval must be granted by
the Mason County Department of Public Works. For any construction which is proposed to be located within 25'of a Mason
County road right of way, it is suggested to contact that office to review future planned work which may affect your project.
For more information contact Public Works, at(360)427-9670, ext. 450 or 100 W Public Works Dr. Shelton. The building
permit will not be finaled until the permit holder can show proof that the access permit from Public Works has been finaled
and approved.
* Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance
with Mason County Title 14.28 and 14.17.
* REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable
provisions of the current code and the manufacturer's installation instructions.
A drip edge shall be provided at eaves and gables of shingle roofs.
* When parcel development requires direct access to state road(s), a Road Access Permit or Approval must be granted and
approved by the Washington State Department of Transportation. For more information contact Washington State
Department of Transportation, at (206)357-2620, ext. 630.
* All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor
increase the velocity flow entering or abutting to any state or county culverting/d itch ing system or road way.
* WIND LOADS - Roof coverings shall be designed and tested to withstand the maximum basic wind speed. The basic wind
speed for Mason County is 85 MPH.
* CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND THE ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All
construction must be in conformance with the international codes as amended and adopted by Mason County. Any
corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting
additional inspections.
* Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and
MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either
private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an
existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance
contact the Mason County Public Works Department prior to construction at Ext 450.
* All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and
plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee
schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections
being performed or approvals granted.
* The foundation/footing must be placed on undisturbed, firm-native soil. Proper frost depth shall be observed below grade
in undisturbed soils.
* All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building
Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration.
Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No
more than one extension may be granted.
* All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted
classification. Any non-approved change of use or occupancy would result in permit revocation.
Printed by:Genie Mcfarland on:04/13/2023 08:40 AM Page 2 of 3
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
NEW COMMERCIAL PERMIT COM2023-00029
" The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the
approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule,
minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being
performed or approvals granted.
* Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
* The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more
than 150' from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards
for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to
another fire apparatus access road which connects to a county maintained public road.
All property lines shall be clearly identified at the time of foundation inspection.
Concrete encased grounding electrodes must be installed and used at each new building or structure that is built upon a
permanent concrete foundation. In Mason County the electrical code is regulated by Washington State Department of Labor
& Industries (L&I).
For more information contact L&I for additional information. In Olympia call (360)902-6350 and in Bremerton call (360)415-
4000.
* All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
* Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the
structure.
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of any other state/local law regulating construction or the performance of construction.
Issued By: rL.' I'L-L-
Contractor or Authorized Agent: (�2 C t Date: `f Z �✓
Printed by:Genie Mcfarland on:04/13/2023 08:40 AM Page 3 of 3