HomeMy WebLinkAboutBLD2007-00501 Final Conversion of Office - BLD Inspections - 11/4/2014 aj r.
o CONCRETE MECHANICAL MANUFACTURED HOME
0 ,
;4 Footings I Setbacks Date By Gas Gas Piping
0 Interior Date By Interior-Date By Date By
0
o Exterior Hate By Exterior-Elate t3
Set-up
Point Load/Isolated Footings INSULATION Date By
Date By BG I SLAB INSULATION
Data By FIRE DEPARTMENT
Foundation Walls Floors Date By
Date By Data -/ 8?MWDECKS
FRAMING Wails Date By
Date By Data By PROPANE TANKS
PLUMBING vault Date By
Date By OTHER
Groundwork Attic
Date By Date By Type:
8y
n.W:v DRYWALL Type-
Dale By Int.Brace Wall Gate By
Date By FINAL INSPECTFON
Water Line Fire Separation
Date By Data By Date �� t3
m
Pass or Request Inspect.
Type of Insp. Fail Date Date Done By Comments
a
� �,•� �, G-P I�t�lr�Lc�.t. S��
0
8
co
tee- vcT
CD
�� �►
fit//iP d A, �r u
J
0
H
J