HomeMy WebLinkAboutBLD9550 Cancelled Mobile Home - BLD Application - 3/10/1978 BUILDING PERMIT APPLICATION
MASON COUNTY
P.O. Box 186 Shelton, Washington 98584 f
DATE ISSUED—
PERMIT NO. f� d
OWNER NAME MAIL ADDRESS CITY&STATE ZIP PHONE
1,1 ,'A55evdW, —
DIRECTIONS
TO JOB SITE
LEGAL (❑ SEE ATTACHED SHEET)
DESCR. t- / Z/
CONTRACTOR 'lA E /I MAIL ADDRESS CITY&STATE LICENSE NO. PHONE
/ 6,61
USE OF
BUILDING '
Class of work: ❑ NEW ❑ AD TION ❑ ALTERATION REPAIR E� MOVE REMOVE
Describe work:
Valuation of work: $ PLAN CHECK FEE PERMIT FEE
SPECIAL CONDITIONS:
•
APPLICATION ACCEPTED BY PLANS CHECK BY PROVED FOR ISSUANCE Type of Occupancy Division
Const. Group
tit 77 Size of Bldg. �9 No. of Max.
(Total) Sq. Ft.he'lV• Stories Occ. Load
CONTRACTOR AFFIDAVIT
PERMANENT SEASONAL E.D.NUMBER
I certify that I am a currently registered contractor in RESIDENCE
the State of Washington and I am aware of the MOBILE HOME
ordinance requirements regulating the work for which
the permit is issued and all work done will be in Special Approvals Required Received Not Required
conformance therewith. ZONING
HEALTH DEPT.
Firm PUBLIC WORKS
By ROAD DEPT.
Lic. No.- — Date
OWNERS AFFIDAVIT
I certify that I am exempt from the requirements of the N O T I C E
contract or registration law RCW 18.27, and am aware
of the Mason Count Ordinance requirements for SEPARATE PERMITS ARE REQUIRED
NG. FOR ELECTRICAL, PLUMBING, HEATING,
Y q VENTILATING OR AIR CONDITIONING.
which this permit is issued and that all work done will
be In Conformance therewith. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED
IS NOT COMMENCED WITHIN 120 DAYS, OR IF CONSTRUCTION OR WORK IS
/ SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER
Owne �� ( —Date' WORK IS COMMENCED.
.7
PERMIT VALIDATION CK. M. CASH
PLAN CHECK VALIDATION CK. M.O. CASH .