Loading...
HomeMy WebLinkAboutGeoTech Assessment for BLD2006-01529 - BLD Engineering / Geo-tech Reports - 11/9/2006 MASON COUNTY PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER Shelton, Washington 98584 DATE: November 9, 2006 INTER-DEPARTMENTAL COMMUNICATIONS TO: Rebecca Hersha PARCEL# 32127-53-00157 FROM: Patricia Carroll, Public Works BUILDING PERMIT NUMBER: BLD2006-01529 SUBJECT: Geotechnical Assessment NAME: Brett Vanslyke Hi Rebecca; The Geotechnical Assessment dated October 3, 2006 has been received and reviewed by Public Works. The Engineering firm of Bradley-Noble Geotechnical Services stated that based on their assessment of the area the site soils are conducive to construction of the new residence at 50 East Angus Ct, Shelton. Recommendations for backfill being placed in conformance with the International Building Code (IBC) to ensure positive drainage away from the structure are necessary. This will prevent ponding against the foundations. The collected water is to be conveyed below the drain field and infiltrated into the slope soils. Installation of roof rain leaders, catch basins, and trench drains to be connected to a tightline collection system conveyed to the toe of the slope for disposal, which will prevent discharge of storm water on the surface adjacent to the structure. The footing drain which is also required may be connected to the common discharge line at an elevation such that backup into the footing zone cannot occur. Use of rigid plastic pipe for both systems is recommended. The tightline storm water collection system should incorporate glued watertight joints. Use of flexible ADS pipe used for the infiltration system must be staked to the slope and maybe connected to this discharge line at an elevation such that backup into the footing zone cannot occur. Good site grading practices and water management including minimum vertical separation between bottom of crawl space and top of landscape soils of three inches, which will be required to ensure a dry crawl space. Adequate erosion and sediment control features need to be implemented during and after land disturbing activities to protect neighboring properties and State waters from adverse stormwater runoff impacts. The migration or release of silty water or mud from the applicant's property will be considered a violation of County and State water quality protection regulations. Please feel free to contact me at 619 or John Sliva at 724 if you have any questions regarding these comments, or if you feel any features need further discussion or attention. Sincerely, 1�J Patricia Carroll Mason County Public Works 1.0/P2/2006 14: 26 3607053066 B AND G PROPERTIES PAGE 02 Bradley-Noble Geotechnical Services A Division of The Bradley Group, Inc. PO Box 1 Z267, Olympia WA 98508-2267 Phone 360-357-7883 • FAX 360-867-9307 28 September 2006 Mr. Brett Vanslyke B & G Properties, Inc. P.O. Box 2856 Olympia, Washington 98S07-2856 Subject: Geotechnical assessment of the slopes on Lot 157 Tract 4 of the Lake Limerick Development, Mason County Tax Parcel Number 321275300157.. Dear Mr. Vanslyke: As requested, we visited the above property in order to observe site geology and slope conditions on this and adjacent lots. Our work consisted of a site visit, observation of soils exposed in the septic system design test pits, review of proposed plans for the lot development, research into the area geology and slope stability history, and preparation of this letter. The project site is located in the Lake Limerick Development. This area is a gently undulating surface of the Vashon recessional outwash plain. At this site, we find the area adjacent to Angus Court to be of low relief. To the south of the area of low relief where the new residence will be constructed, we find moderate slopes down to the northeast and south. Slope angles as measured with a Leitz Pocket Transit varied between I I to 13 degrees (19- to 23% of slope), Slope angles are significantly less than the angle of internal friction of the soils mantling the slope and the underlying Vashon subglacial till. With slope angles less than the angle of internal friction of the material forming the slopes, slope stability is inferred. On examination of the soils exposed in road cuts and building pad cuts in this area, we find a thin layer of Vashon recessional outwash sands and gravels (Qvr). These soils are thin, typically less than four feet in thickness. Underlying the outwash soils is the Vashon subglacial till (Qvt). This is consistent with the soil exposures in the septic system design test pits excavated onto the south-facing slope at this site. The outwash sands and gravels were fluvially deposited onto the Vashon outwash plain as the Puget Lobe of the Cordilleran glacier retreated to the north during the Fraser glaciation in late Wisconsinan time. These soils were deposited onto the subglacial till. Subglacial till is a mixture of silt, sand, and small gravel. It was deposited at the base of the advancing ice 06092301 Page I of 3 V.. 10/02/2006 14: 26 3607053066 B AND G PROPERTIES PAGE 03 06092301 Page 2of3 sheet and overridden by the ice which is thought to have been between one-half to one mile thick in this area. The grain size distribution and loading by the ice sheet have created a soil unit that has many engineering properties similar to those of lean concrete. It can stand steeply with only slow erosion occurring. Subglacial till is for all practical purposes impermeable. Site excavation for the building pad that exposes subglacial till will require special drainage considerations to ensure a dry crawl space. You should expect flows of water to develop on the surface of the till during periods of heavy or prolonged rainfall. To aid in ensuring a dry crawl space and to protect the drain field that will be constructed downslope of the building site, we recommend that all roof rain leaders, catch basins, and trench drains be connected to a tightline disposal system. The collected water is to be conveyed below the drain field and infiltrated into the slope soils. To prevent localized saturation from developing, we recommend that the water be infiltrated by perforated pipes parallel with the slope contours. A footing drain system will also be required. Use of rigid plastic pipe for both system is recommended. Rigid pipe is more resistant to crushing and deflection during backfilling than flexible ADS type of pipe. The tightline storm water collection system should incorporate glued watertight joints. Use of flexible ADS pipe is acceptable for the infiltration system. This pipe must be staked to the slope. The footing drain may be connected to the common discharge line at an elevation such that backup into the footing zone cannot occur. Backfill against foundations must be placed in conformance with the International Building Code (IBC), Section 1803.2 Placement of Backfill. Site grading around the residence must be in conformance with the requirements of Section 1803.3 of the IBC to ensure positive drainage away from the structure and to prevent ponding against the foundation. We also recommend a minimum vertical separation between bottom of crawl space vents and top of landscape soils of three inches. This is to prevent the vents from becoming a conduit for water entry into the crawl space and to promote good ventilation. Geologic Map of the Shelton 1:100,000 Quadrangle, Washington by Robert L. Logan, 2003, and published by the Division of Geology and Earth Resources maps this area as Qgt, Till, late Wisconsinan. Plate I of Water-Supply Bulletin 29 Geology of Southeastern Mason County, Washing by John B. Noble and Dee Molenaar maps the project and genera areas as Qvt, Vashon subglacial till. This mapping is consistent with our field observations. With the slopes being underlain at shallow depth by subglacial till, deep rotational type r d i failures is not considered to be a risk at this site. Relative Stability a Sta Slop ty of the Southern Hood Canal Area, Washington by Mackey Smith and R. J. Carson and published by the 1.0/P2/2006 14:26 3607053066 B AND G PROPERTIES PAGE 04 06092301 Page 3 of 3 Division of Geology and Earth Resources 1977 presents an opini9on on area slope stability. In this mapping, which is at a scale that cannot be considered more than general, we find the project area mapped as a Class I. Class I areas are believed to be stable. This opinion is supported by our field observations. We find the small diameter Douglas firs growing on the slope to be vertical with no evidence of surface soil movement rotating the root mass. No geomorphic expression of recent or past mass wasting events were observed on this and adjacent slopes. Based on our site observations and research, we have no objections to the placement of a new single-family residence at the location indicated based on geotechnical considerations. We do not consider that the project site or surrounding slopes are at risk of mass wasting events that would adversely affect soil foundation support. Good site grading practices and water management will be required to ensure a dry crawl space and to protect the slopes from concentrated flows of storm water. We do not consider the preparation of a Geotechnical Report is warranted at this site due to the site being underlain at shallow depth by highly overconsolidated soils. If you have any questions, or if we may be of additional service to you on this project, please contact us at our Olympia office. Cordially, BRADLEY-NOBLE GEOTECHNICAL SERVICES o� 1Nashi� Ilk David C. Strong, L.E.G. 1129 �tiH used GeO C_."YID(;. S;k-ING MASON COUNTY PUBLIC WORKS WORK ORDER Permit#: ,� —O/5� RECEIVED �fD Date: �� a� OCT 0 4 2006 Requested by: /-/ NIASONCOUNTYP11RIIraw Authorized by: 17anl7,A Type of Work: Public Works employee in charge: ) J/, CHARGE TO: Name: Billing Address: Phone: 7� WORK PERFORMED: Employee: Date: i t ( o G i' 0(,0 Hours: Hourly Rate: Total: ACCOUNTS RECEIVABLE INFO: Billed Date: Invoice #: Amount Billed: Receipt # Date: Amount Paid: