Loading...
HomeMy WebLinkAboutStormwater Plan Review for BLD98-01066 - PLN General - 4/29/1999 MASON COUNTY PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER Shelton,Washington 98584 DATE: April29, 1999 INTER-DEPARTMENTAL COMMUNICATIONS TO: Allan H. Borden, DCD-Planner FROM: Alan A. Tahja, P/W- Co. Hydr. Engr. DCD WO# 9847 SUBJ: Stormwater Plan Review NAME: North Mason Eagles BLD98-1066 Allan, A"PARKING LOT STORM DRAINAGE ANAL YSIS"prepared by Whiteley Engineering has been received and reviewed by Public Works for the proposed construction of a parking area intended to serve the developing North Mason Eagles Clubhouse. The plan also provides for the parking lot layout and geometry which complies with Mason County's Parking Ordinance standards, and is considered acceptable. The stormwater features promoted in the analysis fall short of meeting either Mason County's Parking Ordinance requirements, or Ecology's minimum standards for water quality treatment or discharge standards. Washington State's Department of Transportation has been contacted as the recipient of stormwater runoff generated from this site, and are requesting that any flows delivered to their right of way from commercial properties conform to Puget Sound Water Quality Authority's (PSWQA) downstream erosion control discharge rates. Mason County's Parking Ordinance requires retention of parking and loading area runoff onsite, or disposal of surface water as directed by the Public Works Director. In cases where infiltration of parking & loading area runoff is not feasible or is impractical, Public Works accepts discharges from developing sites which comply with PSWQA BMP standards. With this site draining to the State highway ditch,the applicable standard is PSWQA's downstream erosion control discharge rates. Retaining parking area runoff onsite by infiltrating it into the ground could relieve the proponent from WSDOT requirements, and also diminish the project's obligation to downstream receiving properties,but retention facilities typically need to address runoff treatment of the water quality design storm as defined by the PSWQA, before infiltration is allowed. In late 1997, Mason County adopted the Puget Sound Water Quality Authority's Technical Manual with the exception of Chapter I-2,the minimum stormwater control requirements. Chapter I-2 of the Manual was replaced with a very similar County version which was determined technically equivalent by Ecology. Either version of Chapter I-2 typically leads to the same results. File: H:\WP\STRMWTR\REVIEWS\NM-EAGLS. ID2 Besides providing for permanent runoff control,the Stormwater Site Plan(SSP as defined by Ecology) should contain provisions for temporary erosion and sediment control , and restabilization of disturbed soils during and after construction of the proposed parking facilities. I have discussed the proposed stromwater plan with the project engineer, who I'm sorry to say, was not informed of Mason County's adoption of Ecology's technical manual. The proposed stormwater control plan should be returned to the applicant for revision and compliance with PSWQA's minimum development/redevelopment standards as contained in their technical manual. Please feel free to contact me at County extension 461 if you or the applicant have any questions regarding this review. Sin erely, c7z r Al4n A. Tahj a File: H:\WP\STRMWTR\REVIEWS\NM-EAGLS.ID2 l