Loading...
HomeMy WebLinkAboutPAR2019-00056 - PAR Application - 10/14/2019 • MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT Building Division Mason County Bldg. 8, 615 West Alder Street, Shelton, WA 98584 www.co.mason.wa.us (360)427-9670 Belfair(360)275-4467 Elma (360)482-5269 MASON COUNTY PRE-SUBMISSION CONFERENCE NOTES • BUILDING DEPARTMENT REPRESENTATIVE: Tricia Woolett (360) 427-9670 ext. 281 E-Mail: tw@co.mason.wa.us • DATE: October 14, 2019 • PROJECT/ PROJECT TRACKING NUMBER: PAR2019-00056 Q1GY.i • PARCEL NUMBER: 12332-50-00087 �^ 1 Yn• SITE ADDRESS: 691 NE Roessel Rd, BelfairS • PROJECT REPRESENTATIVE (S): Mendy Harlow @ 360.507.3150 DESCRIPTION & SIZE OF PROJECT/OCCUPANCY CLASSIFICATION & USE: Change a barn previously used for agricultural and equipment to an assembly occupancy. ALL COMMERCIAL SUBMITTALS ARE BY APPOINTMENT. PLEASE CALL 360.427.9670 EXT. 352 TO SCHEDULE A APPOINTMENT. COMMENTS: Scope of work unknown. Will there be renovations to the structures suck as heating, plumbing and structural work? The application appears to be using the assembly unconcentrated calculation of 3500/15 equal to 233-person occupancy. THE FOLLOWING MUST BE INCLUDED ON THE PLANS: • Code Analysis: Must be supplied in the construction plans and completed by a Washington State Licensed Design Professional for the scope of work. • SETBACKS TO PROPERTY LINES: Provide a site plan, drawn to scale. Clearly identify all structures including fences, parking and other similar items, with setback dimensions on site the plan. • DISTANCES TO OTHER STRUCTURES: Site plan, drawn to scale shall clearly identify distances, where required include fire-resistive details, including continuity, & tested assembly details. • FIRE RESISTANCE FOR EXTERIOR WALLS: When applicable include fire-resistive details, including continuity, &tested assembly details. • IDENTIFY TYPE OF CONSTRUCTION & PROVIDE ALLOWABLE AREA CALCULATIONS WHERE NEEDED. See Chapter 5, IBC • FIRE-RESISTIVE RATED CONSTRUCTION & TYPE OF CONSTRUCTION: Where required demonstrate compliance. Identify the location of the assembly, compliance to continuity requirements and construction details: Exterior Wall (IBC704), Fire Wall (IBC705), Fire Barrier (IBC706), Shaft Enclosures (IBC 707), Fire Partitions (IBC 708), Smoke Barriers (IBC 709), Smoke Partitions (IBC 710), Horizontal Assemblies (IBC 711), Penetrations (IBC 712), Fire Resistant Joint Systems (IBC 713), Fire- Resistance Rating of Structural Members (IBC 714), Opening Protection (IBC 715), Duct and Air Transfer Openings (IBC 716), Concealed Spaces (IBC 717), ETC, • NUMBER OF EXITS REQUIRED/OCCUPANT LOAD:(IBC 1004): Table 1004 is used to determine occupant load used to evaluate the structure for exiting purposes, plumbing fixture requirements, and other code related concerns. Include design calculations, demonstrating how occupant loads were calculated, on building plans. • EXIT PLAN: Clearly identify the exit path and exit signage on construction plans. • ENGINEERING REQUIRED: Structures that do not comply with prescriptive specifications of the 2015 International Code (IBC) shall be designed in accordance with Chapter 16 of the IBC. Referencing Washington State RCW 18.08.410 - Structures 4000 sq. ft or more shall have all plan pages reviewed and stamped by a Washington State licensed design professional. The review shall include a code evaluation addressing life-safety, plumbing & mechanical evaluation, and structural analysis. (ref. RCW 18.08.410) ALL PLAN PAGES SHALL BE STAMPED AND SIGNED BY THE DESIGN PROFESSIONAL, including plumbing and mechanical pages. • ACCESSIBILITY REQUIRED: YES, must include compliance information and plan details including design details and analysis demonstrating compliance to Chapter 11 and details demonstrating compliance to ANSI 117.1, in effect at the time of submittal. Include information demonstrating compliance for restrooms, employee work areas, parking spaces, accessibility to structure, drinking fountain, signage, etc. Construction plans will NOT be accepted without compliance details include on the plans. • PLUMBING SYSTEMS (Chapter 29 Washington Amendment to IBC): Using IBC Chapter 10, determine occupant load. The number of plumbing fixtures is determined based upon the occupant load. Plumbing fixtures need not be provided for unoccupied buildings. Permitted building shall comply. On plans include design calculations for the following: water closets (M/F), Lavatories, Drinking Fountains, etc. Referencing IBC/WAC 2902.2 separate plumbing fixtures shall be required for each sex, except when the calculated occupancy load is 15 or less, and then unisex fixtures shall be allowed. Plumbing fixture count can be for the entire facility, including all structures) for compliance purposes. Provide design calculations demonstrating how the fixture count was determined on construction plans. Preliminary numbers show the following for 233 persons; 2 drinking fountains, 2 male water closets with lavatory and 4 female water closets with 1 lavatory • NON-RESIDENTIAL ENERGY CODE (IECC/WSEC): Provide completed compliance forms. Forms (Envelope, Mechanical and Lighting are available at: https://wseccompliancedMlments.com/ • VENTILATION CODE COMPLIANCE: Must provide calculations and compliance documentation. • AIR BARRIER: Air Barrier requirement per the WSEC must be shown on the construction documents. Plans must include testing criteria. • COMMERCIAL KITCHEN: Show compliance to Chapter 5 of the International Mechanical Code when a kitchen is included in the project. • GEOTECH SOILS REPORT REQUIRED? YES_/ NO_X_ If footing work is added it would be required. • PROVIDE A SPACE FOR STORAGE OF RECYCLED MATERIAL & SOLID WASTE (WAC51-50-009): Identify the location on site plan. • SPECIAL INSPECTION: Referencing IBC Chapter 17, Section 1704.1.1. When required a Statement of Special Inspections must be prepared by registered design professional in responsible charge. A completed Special Inspection Agreement form must be submitted prior to permit issuance. • INTERIOR FINISHES: Include information demonstrating compliance to Interior finishes required in IBC Chapter 8. • STORAGE SPACES: Identify material stored, anticipated quantities, height, and if hazardous, include MSDS sheets for each product. • STORAGE RACKS: greater than 59" shall be permitted either with the proposed project or separate building permit. Where required documents shall include design information demonstrating stability for seismic conditions. Special inspection may be necessary, reference IBC Section 1707.6 and 1705.3 (4.5), storage racks, provide compliance information. • MECHANICAL EQUIPMENT: Identify the location and type of mechanical equipment located within, and outside the structure. Address foundation and support systems for equipment. Where new equipment will be placed on site provide UL listing information and/or construction details shall be stamped by a Washington State licensed design professional. Where applicable include duct information and duct support compliance information. • FIRE MARSHAL REQUIREMENTS: Fire Marshal comments requirements including fire protection requirements and identify compliance information on the proposed building plans. Show the location of fire extinguishers and identify type. The following items must be completed for the project approval: • WATER SUPPLY & FIRE HYDRANT: Referencing IFC, Section 508; clearly identify fire hydrant location if one is located within 400 ft of the project. • FIRE FLOW: A copy of the approved method for determining fire flow is enclosed. Complete the Commercial fire-flow worksheet to identify fire flow and fire protection that may be necessary. Note that when fire flow is not available step 3 shall apply. See also requirements for IBC Table 503, allowable areas: 0-500 sq ft.: no protection (mitigation) needed. 501-5,999 sq ft.: Install a NFPA 72 addressable fire alarm system OR construct firewalls in accordance with IBC Section 706 to create maximum 2,000 sq ft fire areas. 6,000-12,000 sq ft.: Install NFPA 13 automatic fire sprinkler system OR install NFPA 72 addressable fire alarm system maximum 6,000 sq ft fire area with fire walls constructed in accordance with IBC Section 706, OR construct firewalls in accordance with IBC Section 706 to create maximum 2,000 ft fire areas. 12,000 sq ft. or more: Install NFPA 13 automatic fire sprinkler system. • EMERGENCY VEHICLE ACCESS: "Standards for Fire Apparatus Access Roads: adopted through Mason County Code Title 14 Section 14.17 is attached. Submit documents should clearly identify code compliance. • ADDRESSING: Referencing IFC, Section 505 and Mason County Code Chapter 14.28, all new buildings shall have an approved address. • AUTOMATIC FIRE ALARM: Referencing IFC, Section 907 and NFPA 72, when proposed provide information on plans that identifies your intent to install the alarm system. Automatic fire sprinkler system requires a separate permit. • SPRINKLER SYSTEM: Referencing IFC, Section 903 and NFPA 13, (separate permit) when proposed provide information on plans that identifies your intent to install the NFPA 13 fire sprinkler system. Verify that design calculations include additional load attributed to required fire sprinkler system. • KNOX BOX: Referencing IFC, Section 506 and access shall be required. Contact your local Fire District for detail to order your Knox box. • LAND MODIFICATION: Any grading, filling or excavation in combination that exceed 200 cu yards will require a Land Modification Permit. If the project exceeds 500 cu yards it will also need a SEPA. Depending on the scope of the project you may need an engineered Stormwater Plan and Geological report to accompany this application. • SUSPENDED CEILING SYSTEMS: Provide details and specifications relating to suspended ceilings where applicable. Please note we are in a D2 seismic region. Details shall be designed and approved for seismic loading in accordance to IBC Chapter 16. Where required designate special inspection plan. • STORMWATER MANAGEMENT: A Plan must be submitted in accordance with Mason County Code Title 14.48, Stormwater Management plans must meet WA State Department of Ecology's 2012 Stormwater Regulations. PERMITS REQUIRED FOR PROJECT: o BUILDING (each structure) o PLUMBING / MECHANICAL (each structure) o GRADING PERMIT (When greater than 200 cubic yards) o CHANGE OF USE/OCCUPANCY (When each Tenant is identified for use) o FIRE SUPPRESSION, See Fire Marshal comments (each structure) o SIGN (each business) o FENCE (Greater than 7'0" above grade) o RETAINING WALL(S) (one permit for all walls on parcel) ADDITIONAL NOTES: 2018 Codes effective July 2020 ADDITIONAL REQUIREMENT FOR PERMITING: WHEN YOU SUBMIT PERMITS, YOU WILL NEED TWO (2) COPIES OF YOUR SITE/PLOT PLANS, DRAWN TO SCALE, 11X17 PAPER SIZE, ALL NECESSARY PERMIT APPLICATIONS INCLUDING THREE (3) COMPLETE SETS OF BUILDING PLANS WITH CALCULATIONS WHEN REQUIRED. (NOTE: ALL PLAN PAGES SHALL BE STAMPED BY THE DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE WHEN: (1)THE STRUCTURE EXCEEDS 4000 SQ. FT., (2) THE STRUCTURE IS ENGINEERED/DESIGNED. • CONSTRUCTION PLANS, drawn to scale. Include floor plan, elevations, cross section, cross section, construction details, etc. • MECHANICAL PLAN, (If a deferred submittal must be indicated on plans at submittal) • PLUMBING PLAN AND (If a deferred submittal must be indicated on plans at submittal) • NON-RESIDENTIAL ENERGY CODE/VENTILATION & INDOOR AIR QUALITY CODE INFORMATION. • A PLAN REVIEW FEE WILL BE COLLECTED WHEN THE BUILDING PERMIT IS SUBMITTED. VALUATIONS ARE BASED UPON THE MOST RECENT BUILDING STANDARDS VALUATION DATA. DESIGN CRITERIA: SEISMIC ZONE: D-2 WIND SPEED: 85 MPH basic 110 ultimate, Exp. (Unless proven otherwise) GROUND SNOW LOAD: PSF REFERENCE CODE EDITIONS (current code): Effective August 9, 2016 2015 INTERNATIONAL BUILDING CODE(IBC), INCLUDING APPENDIX CHAPTERS C, E AND H, EXCLUDING H106; SECTIONS 101 THROUGH 107, PUBLISHED BY THE INTERNATIONAL CODE COUNCIL,AND EXCLUDING APPENDIX CHAPTERS A, B, D, F, G, I, J AND K AND;ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51- 50. 2015 INTERNATIONAL EXISTING BUILDING CODE(IEBC) 2015 UNIFORM PLUMBING CODE(UPC), PUBLISHED BY THE INTERNATIONAL ASSN. OF PLUMBING AND MECHANICAL OFFICIALS(IAPMO)AND ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51-56 AND WAC 51-57, EXCLUDING SECTIONS 102.4 AND CHAPTERS 12, 15, AND 16, PART I. 2015 INTERNATIONAL MECHANICAL CODE(IMC), PUBLISHED BY THE INTERNATIONAL CODE COUNCIL, AND THE 2009 INTERNATIONAL FUEL GAS CODE AS ADOPTED THROUGH THE WASHINGTON STATE BUILDING CODE WAC 51-52. 2015 INTERNATIONAL FIRE CODE (IFC) PUBLISHED BY THE INTERNATIONAL CODE COUNCIL, EXCLUDING APPENDIX A, D,AND K AND ADOPTING APPENDICES B,C,E,F, G AND ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51-54. 2015 INTERNATIONAL ENERGY CONSERVATION CODE(IECC), AS AMENDED BY WASHINGTON STATE BUILDING CODE WAC 51-11 To view the Mason County Building and Construction Code and adopted amendments go to the Mason County website at: www.co.mason.wa.us e�/� / y�� '/� MASON COUNTY COMMUNITY SERVICES PAR Building,Planning,Environmental Health,Community Health 615 W.Alder St.—Bldg.8,Shelton,Wa 98584 DATE Phone:(360)427-9670 ext.352♦ Fax:(360)427-7798 PRE-APPLICATION CONFERENCE REQUEST FORM The purpose of the pre-submission conference is to identify and/or eliminate as many potential problems regarding a proposal. Representatives from the Fire Marshal's Office, Building Department, Environmental Health, Planning, and Public Works Departments Ma_attend the meeting to discuss rules and regulations applicable to the proposed project. Topics covered during the meeting may include the comprehensive plan, land divisions, shoreline program, zoning, availability of sewer and potable water, development concepts, building construction, fire protection and life safety concerns of the proposed project. The pre-submission conference is intended as an informative meeting. The intent is to provide detailed information to the applicant in regards to codes and process. Incomplete applications will not be accepted. If application is deemed incomplete it will be returned. All Conferences are on Mondays (except holidays) To schedule a meeting you must complete the requirements for submittal including the required one (1)copy of the detailed site plan(max. size 11"xl7"). To submit either by mail or in person at: Mason County Permit Assistance Center at 615 W Alder Street, Shelton WA 98584 by 3:00 PM on the Monday two weeks prior the proposed meeting. Please make check Raavable to: Macon County Treasurer Check amount: $620.00 Owner: Name: Hood Canal Salmon Enhancement Group Mailing Address: PO Box 2169 Belfair, WA 98528 Daytime Telephone: 360-275-3575 Email address: mendy -pnwsalmoncenter.org Fax number: 360-275-0648 Representative: Name: Mende Harlow Mailing Address: PO Box 2169 Belfair, WA 98584 Daytime Telephone: 360-507-3150 Email address: mendy(ZD_pnwsaImon center.org Fax number: 360-275-0648 Tax Parcel Number(12 digits): 123325o00087_Site Address: Rev.January 2019 ♦Description of Project: Change of use of the barn from Agriculture to Assembly? to allow for occupancy of up to 233 people. ♦Square footage of structure: 3500 ♦ Use of building and rooms (i.e., office, warehouse, restaurant, storage, etc): Currently, the building serves as a place for storage of research equipment and vehicles. ♦Occupancy classification per IBC, Section 302.1, and construction type: Storage ♦ Will grading or excavation be included in the project? No If so what is an estimate the amount of grading: cut cy ,, fill cy ♦ Will Forest Practices be included in the project? No If so what is the estimated amount of logging: board feet ♦ Are there any historical stormwater and/or geotechnical reports (prepared for previous development)? Please Indicate Yes ❑ No X ♦ Has the project been discussed during a previous Pre-Application Conference? If yes, please indicate date. No ♦ Will the building have employees? Yes ❑ No X If yes, how many? ♦ What is the proposed source of water? (Please indicate): ❑ Proposed Individual Well, ❑ Existing individual well, ❑ Proposed water system, X Existing Water System, Name of existing water system:_Pacific NW Salmon Center Water System ♦ What is the proposed source of sewage disposal? (Please indicate): X Existing onsite sewage system, ❑ Proposed onsite sewage system, ❑ Existing sewer connection, ❑ Proposed sewer connection, Name of Sewer System connected to: ♦ Will the project include signage? Yes ❑ No X If Yes, describe; size, material and location: ♦ Is there a fire hydrant located within 400 feet? Yes ❑ No X If, yes include on site plan. The following items must be included (attached ♦Provide two sets of proposal/plans including a floor plan. Max. paper size 11" x 17". ♦Provide ONE (1) copy of the site plan including all items required (see page 3) Provide specific comments or specific questions we can help you with: 2 Site Plan Requirements 1 coAv is required at submittal Include the following information ❑ Indicate Scale and North Arrow ❑ Property line dimensions, easements, and right-of-ways. ❑ 1pacgggon of all existing and proposed structures. Include square footage of existing and proposed ❑ Setback distance, in feet from all property lines and structures. ❑ Existing and proposed road access to and from the site. ❑ Parking sites ❑ Location of on-site sewage tanks and drainfields. ❑ Location of drinking water supply. Include location on the proposed site and surrounding parcels. Steep e wetl❑ p slope, ands, streams, and bodies of water ❑ Location of fire hydrants and emergency vehicle access roads, including grade. ❑ Surface and storm water run-off routes. ❑ The site plan should be provided on letter(8.5" by 11"), legal (8.5" by 14"), or 11" by 17" (a larger one could be provided in addition to this). ❑ If there are several buildings on the site and/or proposed, to label each one A, B, C, D, ... ❑ Show EXISTING drainage features (infiltration ditches, retention ponds, etc). ❑ Show BOUNDARIES, area and volume of proposed site disturbance (this includes clearing and rading limits, proposed timber harvest activity/tree-cutting, landscaping. o ow all th existm and ro osed impervious surface areas (including gravel driveway, ❑ g, parr ing etc,in sq�are feet. APPLICABLE BUILDING CODES 2015 International Building Code/2015 International Residential Code 2015 International Fire Code-ANSI A117 2015 International Mechanical Code—WAC 51-42 2015 Uniform Plumbing Code—WAC 51-56/51-47 2015 International Energy Code/Washington State Energy Code—WAC 51-11 C&51-11 R Mason County Ordinance Title 14&Code changes are on a 3 year cycle; effective in July of that particular year. Date of Conference: Time of Conference: Location of Conference: 415 N 6th Streets, Shelton WA Planner: ext. 3 t MASON COUNTY COMMUNITY SERVICES Building,Planning,Environmental Health,Community Health October 29, 2019 Hood Canal Salmon Enhancement Group Attention: Mendy Harlow PO Box 2169 Belfair, WA 98528 Re: Change of Occupancy of a barn to an assembly use. A letter was provided at the Pre-Application Meeting on October 14, 2019, this letter discusses the submittal requirements on behalf of the Building Department.After our discussion at the pre-application meeting, I wish to refine the information needed and code compliance required for this project. The following items must be included and addressed in the project submittal: 1. Application for a Building Permit to Change the Occupancy from a "U"to a "A-2" occupancy. 2. A scaled site plan of the location including setbacks to property lines and other structures, parking spaces(identify ADA parking) and all utilities. 3. A floor plan of the structure with all areas labeled for intended use and dimension of rooms. 4. In accordance with International Building Code WAC Section 1204.2.2 Primary Heating Source. Primary heating sources in all new and substantially remodeled building in designated areas shall not be dependent upon wood stoves. Therefore, wood can not be used as a primary heat source. 5. However,the structure must be compliant to the Washington State Energy Code. In accordance with the International Building Code WAC Section Equipment and systems. Interior spaces intended for human occupancy shall be provided with active or passive space-heating system capable of maintaining a minimum indoor temperature of not less than 68 degrees at a point 3 feet above the floor on the design heating day. Exceptions:1. Interior spaces where the primary purpose is not associated with human comfort. 2. Group F, H,S or U occupancies 3. Group R-1 occupancies not more than 500 square feet. The scope of this project does not meet these exceptions. Additionally, the structure must be provided with ventilation air in accordance with the Washington State Energy Code Section C403.2.6 and the International Mechanical Code Chapter 4.WSEC HVAC Compliance Worksheet must be provided.Any mechanical units must be included on the floor plan and site plan. A Mason County Mechanical Permit is required. 6. When a structure is converted from unconditioned (unheated)to conditioned (heated) space.The envelope is subject to the requirement of Washington State Energy Code.These requirements have insulation values and methods from the ceiling,walls and floor/slab. Reference Washington State OF 7. Energy Code Section C505 Change of Use or Occupancy.A WSEC Envelope/project worksheets are required for submittal. 8. A Lighting Plan and lighting specifications must be submitted.This can be the information on the existing lights.A WSEC Lighting worksheet must be completed and submitted. 9. Plumbing is required in accordance with Chapter 29 of the International Building Code. On behalf of this project I reached out the Washington State Building Code Council by email. I have attached my email and their response.There is not an exemption to the required plumbing.The calculation of occupant load is derived from Chapter 10 of the IBC. When determining occupant load there are three variables: standing only, chairs only and chair and tables. Each with its own factor for computation. If no chairs or tables are provided the factor is 5,this number is divided into 3500 providing an occupant load of 700. If it is chairs only to be provided the factor is 7, divided into 3500 SQ FT providing an occupant load of 500. If table and chair are provided the factor is 15, divided into the 3500 SQ FT providing an occupant load of 234(round up). Plumbing fixture requirements are based on the occupant load,this load will be the approved occupancy and must be posted within the building. My review of your notes indicates an occupancy of 233 indicating the will be table and chairs. Using this information, the following plumbing fixture must be installed, permitted, inspected and shown on your floor plan.You are required to have a Male and Female restroom,two water closets (toilets) and lavatory in each restroom.The restrooms must provide complete accessibility to one stall, entrance and lavatory.Additionally,two drinking fountains are required, however if you install one with a bottle filler and meets accessibility it would be acceptable. 10. The property is identified in a FEMA Special Flood Hazard Area. It has been identified in an AE Zone with a Base Flood Elevation of 13 ft. In a Special Flood Hazard Area,the requirements place limits on the amount of improvement done to a structure.The International Building Code Section 1612.4 and 1612.5.The limitation under the definition of Substantial Improvement;Any repair, reconstruction, alteration, addition or other improvement of a building or structure, the cost of which equals or exceeds 50 percent of the market value of the structure before the improvement or repair is started. If the structure has sustained substantial damage, any repairs are considered substantial improvement regardless of the actual repair work performed... The following items are required to verify the project is not a Substantial Improvement. 1. Application for Flood development Permit(see attached) 2.To establish the value of the structure you must submit either a Mason County Assessor Parcel Detail Report OR an appraisal from a Washington Licensed Appraiser for the structure ONLY. 3. Provide a detailed bid from a Washington State Licensed Contractor for the required improvements and any additional work.At that time a determination of Substantial Improvement with documented. If the it is determined to be a Substantial Improvement additional requirement apply to the project. 11. The structure must meet accessibility in accordance with the International Existing Building Codes Section 1012.8.2 Change in occupancy. Where an entire building undergoes a change of occupancy, it shall comply with Section 1012.8.1 and shall have all the following accessible features: 1. At least one accessible building entrance 2.At least on accessible route from an accessible building entrance to primary function areas. 3. Signage complying with Section 1111 of the International Building Code. 4. Accessible parking, where parking is provided 5.At least one accessible passenger loading zone, where loading zones are provided. 6.At least one accessible route connecting accessible parking and accessible passenger loading zone to an accessible entrance. Where it is technically infeasible to comply with the new construction standards for any of these requirements for a change of group or occupancy, the above items shall conform to the requirements to the maximum extent technically feasible. I understand there is a lot of information within this document. If you wish to meet and discuss the items, please contact me via email at tw@co.mason.wa.us. Thank you, Tricia Woolett (360)427-9670 ext. 281 tw@co.mason.wa.us Parking ■ Roessel Road HCSEG Property (emergency vehicle access) 58' 0% Grade T 2� Brick Hearth 4, ( I I I I 6' 6' Storage Total Building Square Footage: 3,500' Fireplace 1-10.5--1 316' wen/ 1 Pump House 33.5' 0 0 0 61' �� Drain East 978' Property Line Garage Door 90� HCSEG's Rental Property Mindy 125' 0 0 0 Creek 61' Hose Garage Door Garage Door Garage Door Garage Door gib )k A k Q 63' 757 Drain WDFW Property �---- Parking