HomeMy WebLinkAboutSEP2015-00017 - SEP Determinations - 5/29/2015 oN-STArF MASON COUNTY
o P� A o N DEPARTMENT OF COMMUNITY DEVELOPMENT
N Planning Division
° 426 W Cedar St, Shelton, WA 98584
0 � (360)427-9670
1864
DETERMINATION OF NONSIGNIFICANCE
(WAC 197-11-340)
SEP2015-00017
Description of Proposal: Redesignate three parcels, 2.10 acres in total size, in the Rural
Area from Rural Residential 5 zone to the Belfair Urban Growth
Area; and then zone these complete parcels as Mixed Use zone.
The applicant currently does not have certain plans for future
development of the property.
Proponent: RONALD P SZALAY
Location of Proposal: 22637 NE STATE ROUTE 3 BELFAIR
Parcel Number: 123325000094
Legal Description: SAM B. THELER'S HOME & GAR TRS TR 40 EX TRS 40-A TO
Directions to Site:
t9a-fe l%& 3 in Belfair, just north of Straub Hill on the left side.
Lead Agency: Mason County
The Lead Agency for this proposal has determined that it does not have a probable significant
adverse impact on the environment. An Environmental Impact Statement (EIS) is not required
under RCW 43.21 C.030(2)(c). This decision was made after review of a completed
Environmental Checklist and other information on file with the Lead Agency. This information is
available to the public upon request.
Please contact Allan Borden at ext. 365 with any questions. This DNS is issued under WAC
197-11-340(2). The Lead Agency will not act on this proposal for 14 days from the date shown
below, when the determination is final. Comments must be submitted to Dept. of Community
Development, P.O. Box 279, Shelton WA 98584 by 6/12/2015. Appeal of this determination
must be filed within a 14-day period following this final determination date, per Mason County
Code Chapter 15.11 Appeals.
Authorized Local Government Official Date
NOTICE OF APPLICATION
for Amendment to the Mason County Comprehensive Plan
and Request for Rezone (Case No. 15-01)
Notice is hereby given that the applicant, Ronald Szalay, has filed an
application for a request to redesignate three parcels, 2.10 acres in
total size and noted below, in the Rural Area from Rural Residential 5
zone to the Belfair Urban Growth Area; and then zone these complete
parcels as Mixed Use zone. The applicant currently does not have
certain plans for future development of the property.
Site address and Project Location: At 22635 NE State Route 3 within the
Belfair Urban Growth Area, Belfair, WA.
Parcel No: 12332-50-00094, 12332-50-00096, and 12332-50-90102
A complete legal description available at the County office listed below.
Date of Application: March 2015.
The proposed amendment to the Mason County Comprehensive Plan and
Request for Rezone is subject to the public review process under the Mason
County Development Code, Section 15.09.060. This application is evaluated
under the standards of the Mason County Development Regulations Section
1.05.080, Rezone Criteria.
A PUBLIC HEARING will be held by the Mason County Planning
Advisory Commission on the request on Monday June 22, 2015 at 6:00
p.m. in the County Commissioners Chambers, Bldg. 1, 411 N. 5t" Street,
Shelton, WA.
A public hearing by the Board of County Commissioners will be held in
November 2015, when a final decision will be made. If special
accommodations are needed, please contact the Planning Department
at (360) 427-9670 ext. 365.
Comments or questions on this request or the public review process may be sent
to Allan Borden, Department of Community Development, 426 West Cedar St.,
Shelton WA 98584, or (360) 427-9670 ext. 365.
BLVD �O I I [HE C4�.c'�z
z
(r1E Any o j
cyoR v , ?; I I l
z p f ' I
�p 0 ELF_AIR S T j
r NEVCOM
-- �— f
r
Y.ERLY DRY f
f
�O NE WJ WAY
i f
E Ste HL
' 1
NE SQUIRE04
6;
I
AD
Il � � J
T P� �O
1' E S 22 Y _...
_ ix
z I
N �� -[��
W . 1 inch = 1,000 feet
E (Irl l / C �a �
1 inch = 0 miles
Lam, l.�l� l.. 'U7"i
S
i
t
� Y
5 y�
n
a r �
y a
7P K+ v
tn j� • � fir{ P, f vR , "
g
„c F
pitx a
,
T23NRIW
40
ilk
m 2
't
W
_a
fir}+
t .•
"l a
M
y
w -M�
.a` a
•. Mm. r ... , ... by
4 i• -,
Ao
A
iP
it
t
ALSO�rceR��rh D`jitalGlobe G��Eye i cubed USD ,M,SGS, E�X, �
7-7
Get•mapping—Aerc,gri•; IGN, I'GPss o�po,and the GIS U er Con munity
N �e��- .e S�o I Sza ia,� ccv�duses c�I -1 i-�zt'r
1 inch = 200 feet tbf-54
W E
1 inch = 0 miles
I
123325000055
123325000092
123325000061
123325000060
123325000059
�� `�� 123325000056
1
w 123325000064 123325000063
123325000095 123325000098
�123325000097 123325000062 123325000065
123325000099
123325000096
123325000067
123325000094
32
123325000101 123325090101 123320060000 123325000066
123325000068
123325090102 NE S7RAU6 HL
123325000102 123325000076 123325000072 �123325000073
123325000074
123325000103
123325000075 123325000071
123325000104
123325000105 123325000079 123325000081
123325000107 NE SQUIRE LN
123325000106
123325000078
123325000977 123325000932
123325000108 � �'"•�
J 123325000080
�O
123325000110 �
�� 123325000912 123325000911 123325000913 123325000907
123325000908
123325000112 m ram-: E ri,DUMMK 5WEWkMw Lno,
Getm ppin.g, ergrid, IG , IGF,swi to the �I E i
1 inch =200 feet ,({��tr
1 inch = 0 miles
S
SEPA ENVIRONMENTAL CHECKLIST
RECEIVED
UPDATED 2014 MAR 0 6 2015
Purpose of checklist: 426 W. CEDAR ST.
Governmental agencies use this checklist to help determine whether the environmental impacts of your
proposal are significant. This information is also helpful to determine if available avoidance, minimization
or compensatory mitigation measures will address the probable significant impacts or if an environmental
impact statement will be prepared to further analyze the proposal.
Instructions for applicants: hf elpl
This environmental checklist asks you.to describe some basic information about your proposal. Please
answer each question accurately and carefully, to the best of your knowledge. You may need to consult
with an agency specialist or private consultant for some questions. You may use"not applicable" or
"does not apply" only when you can explain why it does not apply and not when the answer is unknown.
You may also attach or incorporate by reference additional studies reports. Complete and accurate
answers to these questions often avoid delays with the SEPA process as well as later in the decision-
making process.
The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of
time or on different parcels of land. Attach any additional information that will help describe your proposal
or its environmental effects. The agency to which you submit this checklist may ask you to explain your
answers or provide additional information reasonably related to determining if there may be significant
adverse impact.
Instructions for Lead Agencies:
Please adjust the format of this template as needed. Additional information may be necessary to
evaluate the existing environment, all interrelated aspects of the proposal and an analysis of adverse
impacts. The checklist is considered the first but not necessarily the only source of information needed to
make an adequate threshold determination. Once a threshold determination is made, the lead agency is
responsible for the completeness and accuracy of the checklist and other supporting documents.
Use of checklist for nonproject proposals:JLel
For nonproject proposals (such as ordinances, regulations, plans and programs), complete the applicable
parts of sections A and B plus the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part Q. Please
completely answer all questions that apply and note that the words "project," "applicant," and "property or
P Y q PP Y
site" should be read as "proposal," "proponent," and "affected geographic area," respectively.The lead
agency may exclude (for non-projects)questions in Part B- Environmental Elements—that do not
contribute meaningfully to the analysis of the proposal.
A. background 1helo
Name of proposed� project, if applicable: hel p�US j �%t-r/,I r�- A Dj 6��NsT5 Gau k4!9p 9--f � ti4 'fo mi c Loo , CNSi/�r gyp =
2. Name of applicant: hj e I� A
3. Address and phone number of applicant and contact person: 1hel
t , I I Id A vc ) c/�w►
0- 6420 - S 77+
SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 1 of 11
4. Date checklist prepared: hf eM 3 - (o - / t
5. Agency requesting checklist: hel r'I A S b AJ 6ovti "t
6. Proposed timing or schedule(including phasing, if applicable): Jhel 5 U / 5
7. Do you have any plans for future additions, expansion, or further activity related to or
connected with this proposal? If yes, explain. hf e
t3 y �NST>���-1 r),7u C T!- FA PV1 I L`t o US Nei
8. List any environmental information you know about that has been prepared, or will be
prepared, directly related to this proposal. Jhel j HAVC ti 6Nc5
9. Do you know whether applications are pending for governmental approvals of other
proposals directly affecting the property covered by your proposal? If yes, explain. hl elPl
A1J
10. List any government approvals or permits that will be needed for your proposal, if known.
11. Give brief, complete description of your proposal, including the proposed uses and the size
of the project and site. There are several questions later in this checklist that ask you to
describe certain aspects of your proposal. You do not need to repeat those answers on this
page. (Lead agencies may modify this form to include additional specific information on project
description.) hf elgl N& pl,—� F/N j rL c S L 6 (7 e PT
)1�4 1 s 1-1,v, C,
12. Location of the proposal. Give sufficient information for a person to understand the precise
location of your proposed project, including a street address, if any, and section, township, and
range, if known. If a proposal would occur over a range of area, provide the range or
boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic
map, if reasonably available. While you should submit any plans required by the agency, you
are not required to duplicate maps or detailed plans submitted with any permit applications
related to this checklist. hf elpl /L (p 2,j 22(�'� Z2� 3 /V
5 45 tf 3 (3&LFA 2 t>✓A S Z a
B. ENVIRONMENTAL ELEMENTS hf el
1. Earth
a. General description of the site hel
(circle one): Flat, roll 3/hilly, steep slopes, mountainous,
other
b. What is the steepest slope on the site (approximate percent slope)? hf elpl
SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 2 of 11
c. What general types of soils are found on the site (for example, clay, sand, gravel, peat,
muck)? If you know the classification of agricultural soils, specify them and note any
agricultural land of long-term commercial significance and w et hr the proposal results in
elpl removing any of these soils. hi PIK,
1 S � e/"
d. Are there surface indications or history of unstable soils in the immediate vicinity? If so,
describe. hj elpl iq 0
e. Describe the purpose, type, total area, and approximate quantities and total affected area of
any filling, excavation, and grading proposed. Indicate source of fill. hI elpl
NI&
f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe.
hf eU Lle 5
g. About what percent of the site will be covered with impervious surfaces after project
construction (for example, asphalt or buildings)? h� e 4-6%)
h. Proposed measures to reduce or control erosion, or other irppacts to the earth, if any: h( elpl
2. Air /
a. What types of emissions to the air would result from the proposal during construction,
operation, and maintenance when the project is completed? If any, generally describe a
give approximate quantities if known. h ��� eZO4*3 O(Q, 1440f-
b. Are there any off-site sources of emissions or odor that may affect your proposal? If so,
generally describe. JtgjpJ N/,/'
c. Proposed measures to reduce or control emissions or other impacts to air, if any: hel
3. Water
a. Surface Water: hf gj
1) Is there any surface water body on or in the immediate vicinity of the site (including
year-round and_, gasonal streams, saltwpter, lakes, ponds, wetlands)? If yes, describe
type S'1��f2 r�1 SC�U t� d- Pez 5,f'
and provide names. If appropriate, state what stream or river it tows into. h
2)Will the project require any work over, in, or adjacent to (within 200 feet)the described
waters? If yes, please describe and attach available plans. hI elpl
�J
SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 3 of 11
3) Estimate the amount of fill and dredge material that would be placed in or removed
from surface water or wetlands and indicate the area of the site that would be affected.
Indicate the source of fill material.
4) Will the proposal require surface water withdrawals or diversions? Give general
description, purpose, and approximate quantities if known. h� elpl t1d
5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan.
h� pl O""
6) Does the proposal involve any discharges of waste materials to surface waters? If so,
describe the type of waste and anticipated volumeof discharge. hel
�U
pj
b. Ground Water:
1)Will groundwater be withdrawn from a well for drinking water or other purposes? If so,
give a general description of the well, proposed uses and approximate quantities
withdrawn from the well. Will water be discharged to groundwater? GiPZ, rneal
description, purpose, and approximate quantities if known. h�gj 4C
2) Describe waste material that will be discharged into the ground from septic tanks or
other sources, if any (for example: Domestic sewage; industrial, containing the
following chemicals. . . ; agricultural; etc.). Describe the general size of the system, the
number of such systems, the number of houses to be served (if applicable), or the
number of animals or humans the system(s) arejexP ected to serve. 1hel
56f—fte- too-f Se"61f," L,$ "Vul ec
c. Water runoff(including stormwater):
1) Describe the source of runoff(including storm water) and method of collection
and disposal, if any (include quantities, if known). Where will this water flow?
Will this water flow into other waters? If so, describe. hl jp
pav area,J
2) Could waste materials enter ground or surface waters? If so, generally describe.no
hl elpl
3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If
so, describe. 46
d. Proposed measures to reduce or control surface, ground, and runoff water, and drainage
pattern impacts, if any: ews(m cfgAp"C r e�j� lQQ e EfJL{
4. Plants h( elpl
a. Check the types of vegetation found on the site: rhelpl
VC eciduous tree: alder, maple, aspen, other
vergreen tree: fir, cedar, pine, other
hrubs
--V-grass
SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 4 of 11
pasture
crop or grain
Orchards, vineyards or other permanent crops.
wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other
water plants. water lily, eelgrass, milfoil, other
other types of vegetation
b. What kind and amount'�f vegetation will be removed or altered? h( e
tq tatt L •,il- S 11(U ts
c. List threatened and endangered species known to be on or near the site.1hel
Van Mew"
d. Proposed landscaping, use of native plants, or other rpeasures to preserve or enhance
vegetation on the site, if any:
e. List all noxious weeds and invasive species known to be on or near the site.
5. Animals
a. List any birds and other animals which have been observed on or near the site or are known
to be on or near the site. Examples include: h� e
birds: 1Qh2wk,kheron, agle, o�birds, other:
mammals: se J, bear, elk, beaver, other:
fish: bass,k2pl on, trout, herring, shellfish, other
b. List any threatened and endangered species known to be on or near the site. h( elpl
c. Is the site part of a migration route? If so, explain. hf elpl
d. Proposed measures to preserve or enhance wildlife, if any: hI elpl f►'�
e. List any invasive animal species known to be on or near the site.
6. Energy and natural resources
a. What kinds of energy (electric, natural gas, oil, wood stove, solar)will be used to meet
the completed project's energy needs? Describe whether it will be used for heating,
manufacturing, etc.Lhel e lecf�l,� 1 Gas , w7b7,( S vveS
b. Would your project affect the potential use of solar energy by adjacent properties?
If so, generally describe. hel t4U
SEPA Environmental checklist(WAC 197-11-96D) May 2014 Page 5 of 11
c. What kinds of energy conservation features are included in the plans of this proposal?
List other proposed measures to reduce or control energy impacts, if any: hf elpl
7. Environmental health
a. Are there any environmental health hazards, including exposure to toxic chemicals, risk
of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal?
If so, describe. hel
Ci k-114WV�
1) Describe any known or possible contamination at the site from present or past uses.
2) Describe existing hazardous chemicals/conditions that might affect project development
and design. This includes underground hazardous liquid and gas transmission pipelines
located within the project area and in the vicinity. rwhI-&
3) Describe any toxic or hazardous chemicals that might be stored, used, or produced
during the project's development or construc ion, or at any time during the operating
life of the project. t J t
4) Describe special emergency services that might be required.
5) Proposed measures to reduce or control environ ental health hazards, if any:
b. Noise
1)What types of noise exist in the area which may affect your project(for example: ^
traffic, equipment, operation, other)? fhelpl "N-4,r G' elwj
2)What types and levels of noise would be created by or associated with the project on a
short-term or a long-term basis (for example: traffic, construction, o eration, other)? Indi-
cate what hours noise would come from the site.1hel -�
3) Proposed measures to reduce or control noise impacts, if any: 1hel
8. Land and shoreline use
a. What is the current use of the site and adjacent properties?Will the proposal affect current
land uses on nearby or adjacent properties? If so, describe. ItpIpI re5 +Lh,. .X
b. Has the project site been used as working farmlands or working forest lands? If so, describe.
How much agricultural or forest land of long-term commercial significance will be converted to
other uses as a result of the proposal, if any? If resource lands have not been designated,
how many acres in farmland or forest land tax status will be converted to nonfarm or
nonforest use? hel ;j
1)Will the proposal affect or be affected by surrounding working farm or forest land normal
business operations, such as oversize equipment access, the application of pesticides,
tilling, and harvesting? If so, how: pro 140AR e4e-c--6
SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 6 of 11
c. Describe any structures on the site.
d. Will any structures be demolished? If so, what? hel
e. What is the current zoning classification of the site? hj elpl I/�(�X�� o ' Or"A-f
Q�
f. What is the current comprehensive plan designation of the site? hf elpl Watt
g. If applicable, what is the current shoreline master program designation of the site? hI elpl N��A
h. Has any part of the site been classified as a critical area by the city or county? If so, specify.
hf elpl /V
i. Approximately how many people would reside or work in the completed project? hf e 2�6
j. Approximately how many people would the completed project displace?
k. Proposed measures to avoid or reduce displacement impacts, if any: 1hel I W-AIJ1M)f te4
L. Proposed measures to ensure the proposal is compatible wi h existing and projected�land
uses and plans, if any:
m. Proposed measures to ensure the proposal is compatible with nearby agricultural and forest
lands of long-term commercial significance, if any:
9. Housing
a. Approximately how many units would be provided, if any? Indicate whether high, mid-
dle, or low-income housing. [hel (5-4D 7_e
b. Approximately how many units, if any, would be eliminated? Indicate whether high,
middle, or low-income housing. hf elpl r471t
c. Proposed measures to reduce or control housing impacts, if any: h� elpl
10. Aesthetics
a. What is the tallest height of any proposed structure(s), not including antennas; what is
the principal exterior building material(s) proposed?1hel �i5 p--
b. What views in the immediate vicinity would be altered or obstructed? hel / �W4r� s L�d
&� X
c. Proposed measures to reduce or control aesthetic impacts, if any: hel ^^oo
11. Light and glare
a. What type of light or glare will the pro osal pr duce? What time of day would it mainly
occur? hel ��5(� ��% C
b. Could light or glare from the finished project be a safety hazard or interfere with views? h� elpl
SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 7 of 11
c. What existing off-site sources of light or glare may affect your proposal?1hel nont,,
d. Proposed measures to reduce or control light and glare impacts, if any: [help] <- jroods
12. Recreation I r I t1fS7
a. What designated and informal recreational opportunities are in the immediate vicinity? hl elpl
b. Would the proposed project displace any existing recreational uses? If so, describe. hf elpl
v t
c. Proposed measures to reduce or control impacts on recreation, including recreation
opportunities to be provided by the project or applicant, if any: 1hel
13. Historic and cultural preservation
a. Are there any buildings, structures, or sites, located on or near the site that are over 45 years
old listed in or eligible for listing in national, state, or local preservation registers located on or
near the site? If so, specifically describe. hel
b. Are there any landmarks, features, or other evidence of Indian or historic use or occupation?
This may include human burials or old cemeteries. Are there any material evidence, artifacts,
or areas of cultural importance on or near the site? Please list any professional studies
conducted at the site to identify such resources. Jhel W)
c. Describe the methods used to assess the potential impacts to cultural and historic resources
on or near the project site. Examples include consultation with tribes and the department of
archeology and historic presery tion, archaeolo ical surve s, Istoric m ps, GIS data, etc.
hf elpl �ti1V�il� (VO {,)archaeological surveys,
� ��i�
d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance
to resources. Please include plans for the above and any permits that may be required.
14. Transportation � !� ( , pn vale,
a. Identify public streets and highways:serving the site or affected geographic area and
describe proposed access to the existing street system. Show on site plans, if any. hf elpl
b. Is the site or affected geographic area currently served by pu I transit? If so, generally
describe. If not, what is the approximate distance to the nearest transit stop? hI g.!
c. How many additional parking spaces would the completed project or non-project proposal
have? How many would the project or proposal eliminate? hf e
SEPA Environmental checklist(WAC 197-11.960) May 2014 Page 8 of 11
d. Will the proposal require any new or improvements to existing roads, streets, pedestrian,
bicycle or state transportation facilities, not including driveways? If so, generally describe
(indicate whether public or private). hf elpl
e. Will the project or proposal use (or occur in the immediate vicinity of) water, rail, or air
transportation? If so, generally describe. hf gj
f. How many vehicular trips per day would be generated by the completed project or proposal?
If known, indicate when peak volumes would occur and what percentage of the volume would
be trucks (such as commercial and nonpassenger vehicles). What data or transportation
models were used to make these estimates?1hel q .5 (v� p0r5 L
g. Will the proposal interfere with, affect or be affected by the movement of agricultural and
forest products on roads or streets in the area? If so, generally describe.
h. Proposed measures to reduce or control transportation impacts, if any: h� e
15. Public services qt115-
a. Would the project result in an increased need for public services (for example:fire protection,
police protection, public transit, health care, schools, other)? If so, generally describe. hI e
b. Proposed measures to reduce or control direct impacts on publics rv'ces if any. hel
16. Utilities
a. Circle utilities currently available at the site: Jbfj2I
lectricity,rnatural gas, �ater, refuse service, tele_ phone, s nits ary sewer, s ptic sys ,
o
b. Describe the utilities that are proposed for the project, the utility providing the service,
and the general construction activities on the site or in the immediate vicinity which might
be needed. hl elpl Py)E,154
C. Si nature HELP
9 �1
The above answers are true and complete to the best of my knowledge. I understand that the
lead agency is relyin on them to ma a its decision.
Signature:
Name of signee
Position and Agency/Organization
Date Submitted: 3 Y 41 •- 1-
SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 9 of 11
D. supplemental sheet for nonproject actions IhLel
(IT IS NOT NECESSARY to use this sheet for project actions)
Because these questions are very general, it may be helpful to read them in conjunction
with the list of the elements of the environment.
When answering these questions, be aware of the extent the proposal, or the types of
activities likely to result from the proposal, would affect the item at a greater intensity or
at a faster rate than if the proposal were not implemented. Respond briefly and in
general
terms.
1. How would the proposal be likely to increase discharge to water; emissions to air; pro-
duction, storage, or release of toxic or hazardous substances; or production of noise?
�
��:; w v,.►� a�, ��,�Nis�;�:,� Tru Q(,1
(j.T)� �trc,5 NG oTJe(2 /.1(-'(��-1 S ►CNer..�, 1�i Tr+� S —1 ►'`"`"
Proposed measures to avoid or reduce such increases are:
2. How would the proposal be likely to affect plants, animals, fish, or marine life?
60 J-► ST4ve'll 6 N 106-K yr 1 TS
Proposed measures to protect or conserve plants, animals, fish, or marine life are:
3. How would the proposal be likely to deplete energy or natural resources?
A/0NL? , 6Trl&V— T)4f,3,j C-xlsi CAI-, vT/4.i r1 �S S
Proposed measures to protect or conserve energy and natural resources are:
4. How would the proposal be likely to use or affect environmentally sensitive areas or
areas designated (or eligible or under study)for governmental protection; such as parks,
wilderness, wild and scenic rivers, threatened or endangered species habitat, historic or
cultural sites, wetlands, floodplains, or prime farmlands?
N ° - AFFC'4-1'
Proposed measures to protect such resources or to avoid or reduce impacts are:
SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 10 of 11
5. How would the proposal be likely to affect land and shoreline use, including whether it
would allow or encourage land or shoreline uses incompatible with existing plans?
JV a N6-
Proposed measures to avoid or reduce shoreline and land use impacts are:
6. How would the proposal be likely to increase demands on transportation or public
services and utilities?
�I\!K C�1JS; (�G i ) yv d F- r'J,,v L T - (-'/QlV4 l t Y'�G�mrnC/ulA L
t�Vjt L, TILn Jai r, ('�,��ic �[LJ �ics S
Proposed measures to reduce or respond to such demand(s) are:
7. Identify, if possible, whether the proposal may conflict with local, state, or federal laws or
requirements for the protection of the environment.
"bN&
SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 11 of 11