Loading...
HomeMy WebLinkAboutGRD96-0030 BLD96-1161 - GRD Application - 10/1/1996 MASON COUNTY PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER Shehm WeeWVon 99584 DATE: October 1, 1996 INTER-DEPARTMENTAL COMMUNICATIONS TO: Warren Colvin, Gen. Services -Plan Checker FROM: Alan A. Tahja, P/W- Co. Hydr. Engr. SUBJ: Stormwater Report Review NAME: North Mason Library Building__ GRD96-0030 BLD96-1161 Warren, Public Works review of the plans and specifications for the proposed North Mason Library Building in Belfair raises no concerns relating to either grading or stormwater features. The grading quantity estimate appears to be reasonable, and compaction and material specifications are adequately addressed. The Stormwater Control features, though not accompanied with calculations or supporting data, appear to be developed to meet Puget Sound Water Quality Authority standards, providing for both quantity and quality control of stormwater discharges. As part of Public Works acceptance of Stormwater Site Plans, Operation and Maintenance Covenants are required to be created to cover the maintenance and operation of privately owned stormwater control facilities. Attached please find a copy of the covenant form Mason County is using to satisfy this requirement. The covenant form should be completed by the applicant, their signature notarized, the document then filed with the Mason County Auditor's office, and a copy of the recorded instrument delivered to Public Works for monitoring and administration. The set of plans submitted to Public Works is being returned with this IDC. For future reference, the stormwater plan that is being approved is being kept with the bulk/set of plans by your department. If I can be of further assistance, please feel free to contact me at County extension 461. S' cerely, I L � Alan A. Tahj File: H:\WP\STRMWTR\REVIEWS\NMLB.RVW 90�1 v3,_+1MvrUsis y"�Y �l v4wmU7C7 9).O;pl 111,2 P. 04 140.1110E: THIS PERMIT B COMES NULL AND VOID IF WORK OR CONSTRUCTION AUT'HOFYZEQ IS NOT COAM1::: d'Jl,CHIN 180 DAYS OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR C I4 A PERIOD OF 180 DAY:, AN 0I2` E AFTER WORK IS COMMENCED. PROOF OF CONTINUATION OF WORK IS BY MEANS OF A IRChaRESS IV SPCCTION. ' ►. OWNERS AFFIDAVIT CONTRACTORS AFFIDAVIT CERTIFY-THAT I AM EXEMPT FROM THE REQUIRE- I CERTIFY THAT I AM A CURRENTLY REGISTER: M NTS OF THE CONTRACTORS REGISTRATION LAW CONTRACTOR IN THE STATE OF WASHINGTON Ai f1CW 1&27, AND AM AWARE OF THE MASON COUNTY AM AWARE OF THE ORDINANCE REQUIREMENTSRF.';. 10FIDINANCE REQUIREMENTS FOR WHICH THIS PER LATING THE WORK FOR WHICHTHE PERMITIS 1SS! MIT IS ISSUED AND THAT ALL WORK DONE WILL BE IN AND ALL WORK DONE WILL BE IN CONFORMA- ((CONFORMANCE THEREWITH. NO CHANGES SHALL BE THEREWITH. NO CHANGES SHALL BE MADE WITI+ 1 MADE: WITHOUT FIRST OBTAINING APPROVAL FROM FIRST OBTAINING APPROVAL FROM THE BUILD.:,� ITHE BUILDING DEPARTMENT. DEPARTMENT. t IX OWNER---.--- -.---.. __ -- — X BY . .c J - w-- ------------ ---__..- __ C?2 !"'C7;`t OFFICIA>: US�`aNCY. Ar.�ep�ed�y ,�,;.,w,;,.�` :.;:,�.. �° <.° �$> . ;;� � -Date • . • °_. • _____ __. DEPARTMENTAL REVIEW "fanning _.__... .__. APP COND APP HOI L: iuilding_---- -— — Erivironmental_M_� _ pc,cial Conditions _ FEES _..._.....,_.__.. - Grading Permit - - --. Plan Review s Site Inspection . Violation Fee Other ----_— --- -_— --- GRD-�torr , M30 \ r MASON COUNTY �1 \ LAND MODIFICATION PERMIT Grading, Excavation, Fill, Slopes, Drainage \ Department of General Services 426 W. Cedar/P.O. Box 186, Shelton, WA ;98584 427-9670/1-800-562-5628 PLEASE PRINT #1 , OwtlerT/1'IP�IZ� Abl/5a_/,�L Llf3, gay Phone # 3&0 4¢3.5b6l Fire DisnTict#Be- `Site Addreaez-3 tt �� _' City St (,tJl Zip 17'S.5-za Owner Address 41S {R60 �- WA� it�. —City �vhpl� St 1� __Zip q8�0 Describe Work 5 b S u6awu l 6( sP �s Ar-F s C v L Atg. #2 Contractor Name "IA • li a- fly f?;'U MM— Contractor Reg # Address Expiration Date City St Zip Phone # #3 Engineer's Name �u5y 11r'TC#�5, /IV6. Phone # 20& Address '2�5 MU.Ll2 AVC. BAST City- 5it�ATTCU- St 60. Zip qn0Z #4 Parcel No. 00038 l 2 33 2 - 5d-C0035 Legal Description {FLA11 F D #5 Number of cubic yards to be excavated: 24 SM cy qw, Number of cubic yards to be filled: q CU 4d, Number of cubic yards to be graded: '�.( (,�Gl�CS �� C(el x #6 Will this be a balanced cut and fill entirely,+within the site? Yes No t/ If No: Will fill be brought on site? Yes No qkc�:S vmx—sraLS (tW1fAt1TC Where does imported fill originate from? T)ePC703 GXJ �CrlOA� Does fill contain any potentially hazardous materials? Yes No X 64-ZAKVOG45 PU— #7 Will excavated materials be taken off site?Yes 1/ No If Yes: Where will excavated materials be taken? i5VPOO- M�ll1(. GtEL #8 Briefly describe existing terrain, vegetation, and improvements on subject site? S/Tv SCpers @ STd(S`D W d12 � M60 ./Al MM6 UMN 4P4 P4Es(M:t-'s&� 60' V aJ 7� SIZE. #9 Total size of area to be cleared `.( acres/sq ft Size of area to be cleared on slopes over 10%fie AC/SF . 410 Has a soils report been completed on the subject site? UPS. If yes, include copy with application. #11 Is the'subject site within 200 feet of a designated shoreline_ USl7.A"S #12 Does the subject site contain any of the following features? River Lake Wetlands Saltwater Slope greater than 150/0415�5 Soft compressible soils Seasonal Runoff None #13 Will the proposed land surface modification change the point's �� where storm water or groundwater enters or exits the site?T�� vv,� � �M M4W r[o) 4y c #14 Will the proposed land surface modification change the quality, quantity, or velocity of storm water/groundwater? L/�S a #15 What methods, if any, will be utilized to minimize erosion and �.. possible sedimentation into nearby waters during and after construction? TOE )FESt' %CTVArC, 65CP O'1/6y<A� 1N&UV(M6 44a EMAE . 64MN r AkT-2,ewCZ--' WIL(-GEC- UC4�W EXAC S'OR l,�,t'(-C lk,r_Z Ufa �7=-Qc rMMAk/('RMA2 RQ -c1&X C C- #16 Will this land modification result in the redirection of any surface water runoff onto adjacent properties? 1�v0 #17 Will surface or subsurface runoff be collected or controlled by interceptors, curtain drains, or other water collection devices once this land modification has been completed? #18 Will the land be replanted upon completion? 5 If yes, with what types of plants? 5 - (;$CAPE PLAW #19 Will this modification result in slopes steeper than those currently on the site? A/4 If so, how steep? Show following on the site plan Lot Dimensions Flood Zones Existing Structures Fences Structure Setbacks Driveways Water Lines Shorelines Drainage Plan Topography Septic Systems Wells Proposed Improvements Easements Indicate Directional by (N, S, E, W) Name of Flanking Street in relation to plot plan Name of Fronting Street APPLICANT TO DRAW SITE PLAN BELOW APPLICANT TO DRAW TOPOGRAPHY PROFILE BELOW NOTICE: THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANYTIME AFTER WORK IS COMMENCED. PROOF OF CONTINUATION OF WORK IS BY MEANS OF A PROGRESS IN- SPECTION. OWNERS AFFIDAVIT CONTRACTORS AFFIDAVIT I CERTIFY THAT I AM EXEMPT FROM THE REQUIRE- I CERTIFY THAT I AM A CURRENTLY REGISTERED MENTS OF THE CONTRACTORS REGISTRATION LAW CONTRACTOR IN THE STATE OF WASHINGTON AND I RCW 18.27, AND AM AWARE OF THE MASON COUNTY AM AWARE OFTHE ORDINANCE REQUIREMENTS REGU- ORDINANCE REQUIREMENTS FOR WHICH THIS PER- LATING THE WORK FOR WHICH THE PERMIT IS ISSUED MIT IS ISSUED AND THAT ALL WORK DONE WILL BE IN AND ALL WORK DONE WILL BE IN CONFORMANCE CONFORMANCE THEREWITH. NO CHANGES SHALL BE THEREWITH. NO CHANGES SHALL BE MADE WITHOUT MADE WITHOUT FIRST OBTAINING APPROVAL FROM FIRST OBTAINING APPROVAL FROM THE BUILDING THE BUILDING DEPARTMENT. DEPARTMENT. X OWNER X BY DATE DATE I , FOR OFFICIAL USE ONLY:Accepted by: Date: DEPARTMENTAL REVIEW Planning APP COND APP HOLD xxh Building L-C- Q I C>- Environmental Other Special Conditions FEES 3, 23d Y(zPS Ta7 cc) rr Grading Permit $ �� 0 117 4pv25T !o o a Plan Review -- 7 Site Inspection Violation Fee Other TOTALFEES $