Loading...
HomeMy WebLinkAboutGeoTech Report Reviews for BLD2000-00785 - BLD Engineering / Geo-tech Reports - 8/1/2000 MASON COUNTY PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER Shelton,Washington 98584 DATE: Aug. 1", 2000 INTER-DEPARTMENTAL COMMUNICATIONS TO: Tammi Griffy, PAC —Building Official FROM: Alan A. Tahja, P/W- Co. Hydr. Engr. PAC WO#2K-0071 SUBJ: Geo-Tech Report Review NAME: James Francis @ Alder Crk Lane BLD2000-00785 Tammi, The geotechnical investigation and retaining wall design prepared for the proposed James Francis shoring design at Alder Creek Lane in Belfair has been received and reviewed by Public Works, prompting the following comments; 1) A minimum thickness of 12" for granular backfill behind the proposed retaining wall should be considered a minimum. Backfill material for the completed wall has not been specified, but should be required to meet the approval of the project engineer. 2) The Uniform Building Code (2306.11) requires wood used in retaining or crib walls to be treated. 3) Because of the height, it seems prudent to suggest that a fence or barrier should be incorporated into the top of the wall for protection against someone falling over it in the dark, or by accident. Please feel free to contact me at County extension 461 if you have any questions regarding these comments, or if you feel any features need further discussion or attention. S'ncerely, rPz_e11 'Akan A. Tahja File: H:\WP\GEO\REVIEWS\Francis-wall-IDC.doc WORK ORDER - PUBLIC WORKS DEPT. (A) Date: '7 A17-60 (E) Work Order - PERMIT#:- jLroge) Number. Requested by: Authorized by: i , Date: Type of Work: CHARGE TO: cI V-IV NAME C AGENCY/COMPANY lei Q ,���� Vol BILLING ADDRESS PHONE MASON COUNTY PUBLIC WORKS 7 (13) Pub. Works Person in Charge: (c) Project Time Line. (from-to dates) - TO Project Start date: $ I Estimated Finlsh Date: Approbmate hours: ESTIMATED TOTAL$'S: i _— _ _ COST ESTIMATE (D) ployee S Rate our to Em SubtotalFringe TOTAL -� y i • r UNIT BAIL TOTAL!'S EQUIPMENT USED: MATERIAL USED: ..........................:..... (F) Actual Cost $ BARS: PROJ ill: DATE Employee WORKED Name t Rate Hours Subtotal Erinue% TOTAL$ EQUIPMENT USED: Date UnS Rate TOTAL M MATERIAL USED: TOTAL ALL (G) BILLED DATE INV i PAID DATE REC.M CK# MASON COUNTY PUBLIC WORKS DIRECTOR/COUNTY.ROAD ENGINEER Shelton,Washington 98584 DATE: Aug- 2"d, 2000 INTER-DEPARTMENTAL COMMUNICATIONS 2 S 6, 7 n`U' TO: Allan Borden, DCD—Planner ;� (� FROM: Alan A. Tahja, P/W - Co. Hydr. Engr. DCD WO#2K-0073 SUBJ: Geo-Tech Report Review NAME: James Francis &Alder Crk Lane BLD2000-00785 Allan, Attached Please find a copy of my review comments prepared for this project at PAC's request. The material submitted by you contained the geotechnical report missing in PAC's materials, but about the only comment I feel was answered by the additional material was the specification/recommendation for the wall backfill material. The geotechnical report and retaining wall designs appear to conform to standards of good engineering and geotechnical practices for this time and place, and recommendations made in the geotechnical report should be made conditions for project permitting. Please feel free to contact me at County extension 461 if you have any questions regarding these comments,or if you feel any features need further discussion or attention. Si cerely, A16 A. Tahja Encl: IDC review comments to PAC dated Aug. 1 S`, 2000 File: H:\WP\GEO\REVIEWS\Francis-wall-ID2.doc 1 vvumf\ UKUtK — PUBLIC WORKS DEPT. c� oats: �( 2 `�avtitSs Fra�ticcs (E) work Order PERMIT P 00 �i� 24 k A< Number. Requested by: Authorized by: Ji_ Date: Type of Work: , CHARGE TO: NAME @�(GfiG!/L rt- // AGENCY/COMPANY BILLING ADDRESS PHONE k y7 2 Pub. Works Person In Charge: ,A0p J / E ::. , .. . . (C) Project Time Line: (from -to dates TO Projed Start date Z Estimated Fhtsh Date: Apffo*iate hours: ESTIMATED TOTAL$S: COST ESTIMATE (D) �L4 Empbyse Rate Hours SuMotal Frince% TOTAL$ 8 z/a0 `32.M / 47 3z l9 BAIIi f'S EQUIPMENT USED: TOTAL MATERIAL USED: w:�e�V:c6:�Jea�Od�ea....ncc<ez-.xlfi;:::..:.::::::::..:...-..-:..:«..>o-:::::::.-:,:::::.�. : •. :.a.-,.�,..,..,...,...ea.R•`2�:A�..m.-.:�v?s�?^A%b«i::�«`.':i:.:�.,geneo^.o-i;-;o^a�'mufkoo�aii ::::� r«::%;off x«r (F) Actual Cost $ BARS: PROJ#-. DATE Employee YKXWED Name aAi4 Hours Subtotal Frinoe% TOTAL$ EQUIPMENT USED: Date Unit ate JOTAL MATERIAL USED: TOTAL ALL (G) BILLED DATE INV# PAID DATE REC.# CK#