Loading...
HomeMy WebLinkAboutDIS2011-00003 Structure Fire - FIR Inspections - 3/28/2011FFFwP­ Inspection Request R taken b Time Date of Inspection equest yL Today's Date A �� Date inspection re ested Name on permit 4-0 Site address Permit number of Telephone contact number& name Type of Inspection: Footing Wallboard Holes Foundation/Stem Final Other Slab insulation ME footing detail: Slab rough-in plumbing MH set-up Framing/plumb/mech/pen ME final Insulation Woodstove/Gas stove Confirm call back by Date Contacted Time t A , Inspection Request -mars Request taken by ime Date of Inspection -3 Today's Date _::5,, —1 l 1 Date inspection requested_ Name on permit_ �Dhn / orjmv� Site address -7�50 NE Permit number dJ 15 201 1 D00,3 Type of permit Telephone contact number& name �O� YGi�Y1 S �� `,)v n Imo►' X ?�� Type of Inspection: Footing Wallboard Holes Foundation/Stem Final Other Slab insulation ME footing ,y�- detail: Slab rough-in plumbing ME set-up ��C �' ex lumb/mech/pen ME final �p �'� Framin Insulation Woodstove/Gas stove *XhA'� Confirm call back by Date Contacted Time nn NGFR V DIS2011-00003,taken 3.31.2011 by LAW,#1 of 8.jpg DIS2011-00003,taken 3.31.2011 by LAW,#2 of S.jpg 03/30/2011 03/30/2011 d _ V r 1 DIS2011-00003,taken 3.31.2011 by LAW,#3 of 8.jpg DIS2011-00003,taken 3.31.2011 by LAW,#4 of 8.jpg 03/30/2011 03/30/2011 DIS2011-00003,taken 3.31.2011 by LAW,#5 of 8.jpg DIS2011-00003,taken 3.31,2011 by LAW,#6 of 8.jpg O 03/30/2011 03/30/2011 ' j vc'�' � �• ^riJ DIS2011-00003,taken 3.31.2011 by LAW,#7 of 8.1pg DIS2011-00003,taken 3.31.2011 by LAW,#8 of 8.jpg 03/30/2011 03/30/2011 1 5/201 Case Activity Listing 9:2 3/2:1201 Case #: DIS2011-00003 Assigned Done Activity Description Date 1 Date 2 B ,&- t idated Updated Bv, , S 1 Y� 1 _� 1 D1SA100 Case Initiated 3/21/2011 None DONE 1)LC 3/21/2011 DI c Contractor request to evaluate existing structure.Scheduled LAW for a site inspection for Thursday 3.24.2011. Parcel file not available. do 3.21.2011 DISB100 Site Invest./Inspection 3/25/2011 None DONE LAW 3/25/2011 LAW A met with Bob Robinson with Trans N.W.Construction on site to evaluate the damage to the building and to see what it would take to rebuild the structures. The garage and breeze way is a total lose,both burned to the ground and the foundation system is split and cracked in several places indicating the fire was hot enough to damage the concrete. The house was extensively damaged,the section next to the breezeway is atotal lose,the roof has collapsed and the top of the walls are burned down about halfway down.The roof will need to be redone many of the rafters are to damaged to re-build on.Most of the rest of the damage is from water,the house will need to be completely gutted.Note:the foundation system for the house is failing,ifs old CMU block and there are numerous cracks,also there does not appear to be a footing under the walls,I could see in the crawl space section of the house and it does not appear to have a footing,the basement section is un-known but the walls are cracked and apprear to be letting in water.There is standing water in the basement and there is mold growing on the ceiling. Page 1 of 1 CaseActivity-rpt