HomeMy WebLinkAboutPAR2001-00056 - PAR Application - 8/1/2001 40
• '_o e�
<— Case Number: PARS/--Qtc35(d
MA,S0 COUNTY 'x.ve- SnAZ u
PRE-SUBMISSION CONFERENCE REQUEST FORM
The purpose of the pre-submission application is to identify,and/or eliminate as many potential problems
as possible in order for the project to be processes without delay. Representatives from the Building Department,
Fire Marshal's office,Environmental Health,Planning and Public Works Departments may attend the meeting to discuss rules and
regulations applicable to the proposed project. Topics covered during the meeting will include the comprehensive plan, shoreline
program,zoning,availability of sewer and potable water, development concepts, building construction,fire protection,and life safety
of the proposed project. Your pre-submission conference will be informative when you provide accurate and detailed information on
the Pre-Submission Conference Application Form and the site plan.
Pre-submission conferences are held every Wednesday and last approximately one-hour.To schedule a conference
complete the application on both sides and return seven(7)copies of the site plan to the Mason County Department of Community
Development,attn: Pre-Submission Conference Coordinator. P.O. Box 186, Shelton. WA 98584. Fax request forms to(360)427-
7798. If you have questions call (360)427-9670 ext. 281.
Date:
Site Plan
Applicant: Submit 7 copies
Name: L6'��/CZA
s � .
Address: Include the following
Daytime Telephone: ���� Zc 'C7 '`7 '�� information on the site plan:
✓ Property lines, easements, and right-of-
Representative: ways.
Name: e— ,In / — ✓ The location of all existing and proposed
Mailing Address: — � S ,cYOb�i structures. Include square footage of
Daytime Telephone:
existing and proposed structures.
✓ Setback distance, in feet, from all property
Parcel Number: (12 digits) lines and buildings.
.7//?-
Existing and proposed road access to and
from the site.
Description of Project:
Include square footage of structure, use of buildings (I.e. office, `� Parking sites
warehouse, restaurant, storage, etc.), occupancy classification per ,� Location of on-site sewage tanks and
U.B.C. table 3-A, and construction type. Provide one set of drainfields.
plans, if available. Use a separate sheet if necessary. ✓ Location of drinking water supply. Include
location on the proposed site and
surrounding parcels.
✓ Steep bluffs,wetlands, streams, and bodies
of water.
✓ Location of fire hydrants and emergency
vehicle access roads, including grade.
✓ Surface and storm water run-off routes.
Continued on reverse side
Has this project been discussed during a previous Pre-Submission Conference? If yes,please indicate date
Will the building have employees? If yes, how many? S
What is the water availability of the proposed project? If there is an existing well,what is the name of the system?
CJ.t4i?=�� cniJi Tt
What is planned for an on-site sewage system? If you are proposing a new on-site system provide detail on the required
site plan.
(motI' Q
ADDITIONAL COMMENTS: �1
1&k
r
�I
APPLICABLE BUILDING CODES:
1997 Uniform Building Code -WAC 5140
1997 Uniform Mechanical Code -WAC 5142
1997 Uniform Plumbing Code-WAC 51-46/5147
1994 Non-Residential Energy CodeNentilation and Indoor Air Quality Code
Mason County Ordinance
Date and Time Conference Scheduled:
Location: l� d nh k C���- �✓�'� 3&3
r
NON RESIDENTIAL DEVELOPMENT
INITIAL REVIEW QUESTIONNAIRE
In accordance with Washington State's Growth Management Act, the
Mason County Comprehensive Plan regulates the placement, expansion or
modification of commercial, industrial and public facilities to certain areas of the
county. In the interest of saving you time and money the Department of
Community Development requires this initial review check list to be completed and
reviewed by this department prior to the submission of any building permits.
Applicant Name 1 nn ���r�c Phone #
Mailing Address � �,����Cc� ��- �� �; �►Gc(i S c,�', ��� �
Site Address
Directions to Site C eyY\,=-,r v
Septic or Sewer
Water Supply
Tax Parcel # ?J,3 - 5 C_� - ECObJ'7 i 2
Legal Description
Type of Development -�- e-3
Applicant's Signature
OFFICIAL USE
IUGA Approved By
bdetlnp Convneroial Date
aoa+tt� n-u mr ars r!'7'1' �0 7l1..t39 ►------ - G--� '�11.ti�scn
Soh*<�Mi xmVsr 40o4
S�Sk*LL QoeM ( I '
Ttu�Crrtwe ''h't o� �nod 3-4 O�I/1 � I
r
�b o rn
7 cn
9' � 2 ,ot 6 �
rn
N \
TS"
zda►ty'ivJaN ':
l
8/29/01 Activities for Case #: PAR2001-00058
10:59:50 AM
Assigned Hold Updated
Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes
PARA10 Application Received 8/23/01 KMR No Hold KMR 8/23/01
PARA910 Meeting 8/29/01 KMR PEND No Hold KMR 8/23/01 Jim Forbes of Lamplighter Home
8/29/01 2:00/2:30pm
Building 1
Planning Conf.Room
Planner:Scott ext.363
PARB10 Planning Review 8/23/01 No Hold KMR 8/23/01
PARB20 Building Plan Review 8/23/01 No Hold KMR 8/23/01
PARB30 WSEC Compliance Review 8/23/01 8/28/01 DLC DONE No Hold DLC 8/28/01 Does not include site built
structures,therefore
Non-Residential Energy Code
compliance does not apply.-do
PARB40 Environ.Health Review 8/23/01 No Hold KMR 8/23/01
PARB50 Public Works Review 8/23/01 No Hold KMR 8/23/01
PARB60 Fire Marshal Review 8/23/01 8/24/01 DLS DONE No Hold DLS 8/24/01 -LA FIRE HYDRANT WILL BE
RF RED n 1H
BINDING SITE PAN,
REQUIRED FOR FMA
E /GIE IIGTION
2.MINIMUM 10'SEPARATION
REQUIRED BETWEEN
MODEL HOME UNITS.
3.A 2A 10BC RATED FIRE
EXTINGUISHER IS REQUIRED
ADJACENT TO THE EXIT
DOOR OF THE OFFICE.
Page 1 of 1
On
( 0
3 89'54'55"E 3 0
10.
SWEET WATER /�� ° .a - Km2
REHAB.
,0 AREA r
O "o
REHAB. •'v I r .; .
AREA '�• 100
lip
10
\ �
RETENTION y p o ., Z ' o
POND �4
12.5 f min.setback from property line.
i
General Requirements:
-Reduce impervious area to 40%of site
� S J p1• if
L t<< -Reduce parking to 2 spaces per dwelling unit-
SL' --- Z.7■x��.� 4a i�, / 40 spaces minimum required
47 spaces provided
o Q�J� 1 / �J� •20 units optimum usage-750sf average size
L 600 sf One-Bed Units
Z �" 750 sf Two-Bed Units -
t 900 sf Three-Bed Units
-General Purpose Building may be added C
-Buildings limited to 3000 sf max per floor l
3 89'56'58"L. Job.2000-27 2-7-2001
—75.43 / Schematic Site Plan 'lop
60.00 Scale: V = 50 ft •�� , Lan.gerr a�Gk�td
`�}�, r1r;ru��, nr•ultiu_�, ull--,:; „ .-, I
/ ttu5winJuAnt ww) nr
` lWnbd 1Nland,w89KLi(s
?�7�1Li'f
wT714ilangR-mackmm