Loading...
HomeMy WebLinkAboutCOM2024-00097 Tents - COM Inspections - 11/14/2024 tQ MASUN COUNTY 615 W.Alder St Bldg 8,SHELTON,WA 98584 � COMMUNITY SERVICES SHELTON:360�27-9670,EXT 352 BELFAIR:360-275-"67,EXT 352 Building,Pimumig,Envirasmental He 10%Community Health ELMA:360-482-5269,EXT 352 `- www.co.mason.wa.us INSPECTION CARD AND CERTIFICATE OF OCCUPANCY** To schedule an inspection call or visit http:/twww.co.mason.wa.us/community-services/bid-inspection.php Permit Number COM2024-00037 Date Issued 07129/2024 Issued By Project 3 TENT STRUCTURES(600 SQ FT EACH)SET UP YEAR ROUND Site Address 1111 SE STATE ROUTE 3 Applicant SALAZAR RENE Contractor Contractor Phone Primary Code UPC IBC,IRC,IFC,IEC,IMC,& Type Permit Type NEW COMMERCIAL PERMIT Occupancy -APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS. -DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED. -THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION,FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY. -ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION. -OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION. **THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED.** PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET Public Works Access/Driveway Other Health Septic Well Deptartment Planning Site Inspection Department Fire Marshall Fire Apparatus Access Fire Sprinkler Auto Fire Alarm Hood and Duct Other Final Building Building Official: Community Services Designee Department Concrete Setbacks ff.IS-2 DEL Slab Footing Perimeter Point load Footing Footing Interior Footing Decks/Porches Foundation Stem Walls Other Rough-In Groundwork Plumbing Framing Groundwork Mechanical Plumbing Groundwork Gas Pipe Mechanical Gas Piping Shear Wall Nailing Underfloor Other Insulation Slab Ceiling Floor Vaulted Ceiling Walls Vapor Barrier Other Wallboard Interior Wall Brace Panels Fire Walls Nailing Other Final Building D Manufactured Setbacks Setup Home Concrete Foot/Runners Final Other .G b S,rsz y I � INSPECTION RESULTS Pagel MASON Department of Community Development 000MMUNITY SE 615 W Alder St,Shelton,WA 98584 COMMUNITY SERVICES "^n^ (360)427-9670 Application# COM2024-00037 Application NEW COMMERCIAL PERMIT Application# COM2024-00037 Ty Parcel# 320301400020 Site Address 1111 SE STATE ROUTE 3 SHELTON,WA 98584 8-13-24 DEC PROVIDE DOCUMENTATION THAT TARP MATERIAL MEETS NFPA701 TESTING REQUIREMENTS Drew Carlson BLD-FINAL INSPECTION FAIL PROVIDE 2-A10BC FIRE EXTINGUISHER NO FARTHER \ THAN 57 FEET APART INSTALL ANCHOR BOLTS IN ALL BASE PLATES AND FILL ALL HOLES WITH ANCHOR BOLTS MAKE CORRECTIONS AND CALL FOR REINSPECTION GENERAL OBSERVATIONS AWAITING INSPECTION Description ;Status Status Date K w INSPECTION RESULTS Page MASON Department of Community Development COMMU MSE 615 W Alder St,Shelton,WA 98584 COMMUNIIYSE�RVICES (360)427-9670 Application# COM2024-00037 Type cation NEW COMMERCIAL PERMIT Application# COM2024-00037 Parcel# 320301400020 Site Address 1111 SE STATE ROUTE 3 SHELTON,WA 98584 8-15-24 DEC ANCHOR BOLTS AND FIRE EXTINGUISHERS PRESENT THIS DATE PROVIDE DOCUMENTATION THAT TARP MATERIAL MEETS NFPA701 TESTING REQUIREMENTS Drew Carlson BLD-FINAL INSPECTION FAIL 8-13-24 DEC PROVIDE DOCUMENTATION THAT TARP MATERIAL MEETS NFPA701 TESTING REQUIREMENTS PROVIDE 2-A10BC FIRE EXTINGUISHER NO FARTHER THAN 57 FEET APART INSTALL ANCHOR BOLTS IN ALL BASE PLATES AND FILL ALL HOLES WITH ANCHOR BOLTS MAKE CORRECTIONS AND CALL FOR REINSPECTION GENERAL OBSERVATIONS AWAITING INSPECTION Description Status Status Date t v CERTIFICATE OF OCCUPANCY Mason County, WA OWNERS NAME: SALAZAR, RENE OWNER'S ADDRESS: 1045 SE STATE ROUTE 3 SHELTON WA, 98584 SITE ADDRESS: 1111 SE STATE ROUTE 3, SHELTON 98584 BUILDING PERMIT NUMBER: COM2024-00037 DESCRIPTION: 3 TENTS FOR MATERIAL STORAGE BUILDING OFFICIAL: KELL ROWEN TELEPHONE NUMBER: (360) 427-9670 ext. 352 CODE/EDITTION: 2018 IBC, IRC, IFC, IEC, ►MC USE OF STRUCTURE: STORAGE OCCUPANCY: s-1 OCCUPANT LOAD: TYPE OF CONSTRUCTION: ►v SPRINKLER SYSTEM REQUIRED: NO This structure has been inspected for compliance with the requirements of this code for occupancy and the use for which the proposed occupancy is classified. CONDITIONS OR STIPULATIONS: MUST CONTINUE TO COMPLY WITH PERMIT CONDITIONS, FIRE CONDITIONS AND STORM WATER CONDITIONS w Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov E 4-00037 NEW COMMERCIAL PERMIT ESCRIPTION: 3 TENT STRUCTURES (600 SQ FT EACH) ISSUED: 07/29/2024 AR ROUND ESS: 1111 SE STATE ROUTE 3 SHELTON EXPIRES: 01/25/2025 PARCEL: 320301400020 APPLICANT: SALAZAR RENE OWNER: SALAZAR RENE 1045 SE STATE ROUTE 3 1045 SE STATE ROUTE 3 SHELTON,WA 98584 SHELTON,WA 98584 1.360.742.6951 VALUATIONS: FEES: Paid Due S-1 IV Storage, moderate 1800.00 $27,000.00 State Fee-Commercial $25.00 $0.00 hazard Planning Commercial Review $380.00 $0.00 Fee Plan Check Fee $286.96 $0.00 Building Permit Fee $441.48 $0.00 Technology Surcharge $14.57 $0.00 IFC Plan Check Fee $143.48 $0.00 Total: $27,000.00 Totals : $1,291.49 $0.00 REQUIRED INSPECTIONS Setback Inspection BLD-Final Inspection CONDITIONS * All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. * All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may grant one or more extension of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicate that circumstances beyond the control of the permit holder prevented action from being taken. Printed by:Anna Schaffran on:07/29/2024 09:40 AM Page 1 of 3 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 lip Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov NEW COMMERCIAL PERMIT COM2024-00037 * The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. * All property lines shall be clearly identified at the time of foundation inspection. * Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. * When parcel development requires direct access to state road(s), a Road Access Permit or Approval must be granted and approved by the Washington State Department of Transportation. For more information contact Washington State Department of Transportation, at(206)357-2620, ext. 630. * The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road. * All other necessary permits from Mason County, Washington State, Federal Agencies, and/or other agencies/groups that are required for this proposed development and construction must be obtained PRIOR TO DEVELOPMENT AND CONSTRUCTION. * Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. * All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. * Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Code 14.28 and 14.17. * All changes to"approved"building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. * CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. * All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. * The tenting connection to slab or ground shall be such that the connections are stable and meeting the requirements for wind loading. * Prohibited uses-storage of materials not for retail sale. (Including but not limited to vehicles, trailers, pallets, etc.) * Landscaping and planting areas shall be maintained in a healthy growing condition. Dead or dying trees or shrubs shall be replaced within thirty days of written notification from the county, and the planting area shall be maintained reasonably free of weeds and trash. Printed by:Anna Schaffran on:07/29/2024 09:40 AM Page 2 of 3 tF Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov NEW COMMERCIAL PERMIT COM2024-00037 I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By: Contractor or Authorized Agent: G{ Date: Printed by:Anna Schaffran on:07/29/2024 09:40 AM Page 3 of 3