Loading...
HomeMy WebLinkAboutGRD94-0030 Final - GRD Permit / Conditions - 5/25/2007 -0? (o exc MASON COUNTY Mason County Bldg. 111 426 W. Cedar R0. Box 186 Shelton, Washington 98584 6RD94 -0030 I-im?f 1 1 1 0 0 M I t I I- I 1 1: 11 P, �,;?1 HWY 3 . . . . . . . . . . HE L FAIR 111N� i: AACK ACIIHNSON A I W' JACK JOHNSON CONS INIC 27li—S464 M N I H Y It it f; I ;.PAttf- I) AN 1 01 1 t l 1 fir' = 1,1: I 1 11,41, G- t I I 1 14,If 1 1 NNI I it i 1 1-1 1 t o t I N, f i A I 1 1111 il 1.4 1 I omrfl N( i o f I j J=,I, I Wd,I r4jIt 14 1 I)f 6 Fit I,' I 'W 0 f I H',5 It h A I ANY I I NI! AI I 1 11, Hiw (11 m H If 1 V 4 1 f"I t I f414 I I toHl" I 'It, (I I A I t I WO'f I itH 1A I I H I N I III I R 0 1 P,Y I,[ I,, 1 (10 IiRIf p COMPI VANCIF 10 ATTACHFI) CONIII-I 10N% 1% Rt\QUYpF-1) MASON COUNTY Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, Washington 98584 CONCRETE MECHANICAL MOBILE HOME Footings-Setback date by Ribbons date by Gas Piping date b Foundation Walls date by Set Up date by INSULATION date by BG/SLAB Insulation Floors Final date by date by date by FRAMING Walls FIRE DEPT. date by date by date by PLUMBING OTHER Groundwork Attic date b date by D.W.V. WALLBOARD NAILING date by date by Water Line FINAL INSPECTION date by date , by date by c--J o 1 1 Or S V WILLIAM BYERLY ETAL SHORT PLAT NO: EAST 532.46 DATE APPROVED: 250.00 a � � ^v DIRECTOR OF SERVICES � z 3 250.o0 o M Y M ti� " 250.00 Q o) Q co ti z ��D 190. 96 IAC,, 250.00 ~ �O� 440. 86 �O JACK JOHNSON a EXCEPTIONco om EAST 395. 10 I °= 100 SHORT PLAT OF A PORTION OF LOT 10 OF SAM B . THELER HOME AND GARDEN TRACTS , AS RECORDED IN VOLUME 4 OF o PLATS , PAGE 20. _ F V OWNERS: JACK E. 5 KATHY JOHNSON P . O. BOX 1119 N BELFAIR , WA 98528 �+ LJr ►J PARCEL Flo: l 2 3 32 -S O -OO D L Z 4 (� Q a �Q GRD_ _ A PR 2 8 1994 MASON COUNTY LAND MODIFICATION PERMIT �- Grading, Excavation, Fill, Slopes, Drainage �`� Department of General Services 426 W. Cedar/P.O. Box 186, Shelton, WA 98584 427-9670/1-800-562-5628 PLEASE PRINT #1 Owner ,�f ac V _ _ _ In�n6�,n _ _ _Phone# _ __ Fire District# Site Address ---.----City- 13,ekzp,,- St­JAJ 5 _Zip Owner Address_ PO, RU�c--ll��--- - - --. CitY—A.y b •1r _St ld.16 __Zip q495120 Describe Work_ �.-r.;<4, (! _ - -- 6.oao- -._ An 4',- C6, A -A y iA 15 Ca rump_._ . .-- �--- p�—y - '-' Contractor Reg#�i4Us��t i� �t Contractor Name �K�� A�� .—� Address �V, P,o x t<< dt _ Expiration Date g City — ---- --- St [� Zvi—Zip 43 5 Phone# '17 i i #3 Engineer's Name —._ Phone# Address City SL—Zi - I #4 Parcel No. Legal Description �,)JC-S t Lc f ( 0 Of Sa #5 Number of cubic yards to be excavated: Number of cubic yards to be filled: n 12 6 Number of cubic yards to be graded: #6 Will this be a balanced cut and fill entirely within the site? Yes No__�-_____ If No: Will fill be brought on site? Yes ��- —No Where does imported fill originate from? i k A S 'Tu p lr). 0 c-+ n Does fill contain any potentially hazardous materials? Yes No - #7 Will excavated materials be taken off site?Yes ___ No— If Yes: Where will excavated materials be taken? 118 Briefly describe existing terrain,vegetation, and improvements on subject site? #9 Total size of area to be cleared Z __ _____acres/sq ft Size of area to be cleared on slopes over i 0%_ - --AC/SF #10 Hasa soils report been completed on the subject site? If yes, include copy with application. #11 Is the subject site within 200 feet of a designated shoreline #12 Does the subject site contain any of the following features? River Lake Wetlands Saltwater Slope greater than 150/*- — Soft compressible soils--._- Seasonal Runoff None #13 Will the proposed land surface modification change the points where storm water or groundwater enters or exits the site?___ No #14 Will the proposed land surface modification change the quality, quantity, or velocity of storm water/groundwater?_ Np #15 What methods, if any, will be utilized to minimize erosion and Possible sedimentation into nearby waters during and after construction? _ eQ ��_--- _1�,,aC>✓ _ 5' ruA OS P lc, iA #16 Will this land modification result in the redirection of any surface water runoff onto adjacent properties? /l/n #17 Will surface or subsurface runoff be collected or controlled by Interceptors, curtain drains, or other water collection devices once this land modification has been completed? _ _ ./LSO #18 Will the land be replanted upon completion? _ �p of c,t;, If yes, with what types of plants? _ ^_ — — #19 Will this modification result in slopes steeper than those currently No on the site? If so, how steep?_ Show following on the site plan Lot Dimensions ` - Flood Zones Existing Structures Fences Structure Setbacks Driveways Water Lines Shorelines Drainage Plan Topography Septic Systems Wells Proposed Improvements Easements indicate Directional by (N, S,. E, W) Name of Flanking Street in relation to plot plan Name of Fronting Street APPLICANT TO DRAW SITE PLAN BELOW — APPLICANT TO DRAW TOPOGRAPHY PROFILE BELOW I { NOTICE:THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 D SPECTION. AYS AT ANYTIME AFTER WORK IS COMMENCED. PROOF OF CONTINUATION OF WORK IS BY MEANS OF A PROGRESS IN- OWNERS AFFIDAVIT CONTRACTORS AFFIDAVIT I CERTIFY THAT I AM EXEMPT FROM THE REQUIRE- I CERTIFY THAT I AM A CURRENTLY REGISTERED MEATS OF THE CONTRACTORS REGISTRATION LAW CONTRACTOR IN THE STATE OF WASHINGTON AND I RCW 18.27,AND AM AWARE OF THE MASON COUNTY AM AWARE OF THE ORDINANCE REQUIREMENTS REGU- ORDINANCE REQUIREMENTS FOR WHICH THIS PER- LATING THE WORK FOR WHICH THE PERMIT IS ISSUED MIT IS ISSUED AND THAT ALL WORK DONE WILL BE IN AND ALL WORK DONE WILL BE IN CONFORMANCE CONFORMANCE THEREWITH.NO CHANGES SHALL BE THEREWITH. NO CHANGES SHALL BE MADE WITHOUT MADE WITHOUT FIRST OBTAINING APPROVAL FROM FIRST OBTAINING APPROVAL FROM THE BUILDING THE BUIL!;A PART DEPART T. X OWNER X BY _ DATE - 277 DATE .� LFOR OFFICIAL USE ONLY:Accepted by. Date: DEPARTMENTAL REVIEW Planning _— _ APP COND APP HOLD Building Apb R —ZIL_ F Special Conditions fry_ 6 FEES - 0 CL` ft( Ic m -- Grading Permit OFSiOn/ C SC �rntu? _��n�T2�C�� SReview7'0 _ ~T I/v / c i N a Inspection -- �N ,4 Z=i. NCTIC,N//.I6. "fiAN (A*y I_j,,L Violation Fee Other TOTAL FEES $ �L' 00 MASON COUNTY PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER Shelton, Washington 98584 June 28, 1994 INTER-DEPARTMENTAL COMMUNICATIONS DATE TO.. amisTINE HER H, Building Department FROM: ALAN A. TAHJA, P/W Hydraulic Engineer SUBJ: JACK JOHNSON grading review comments (Legal P# 12332-50-00022) Christine, The one comment I would like to make regarding the Jack Johnson grading project, is that the Erosion and Sediment control measures should be left in place and maintained in a functioning manner until the permanent vegetation is established and the E&S measures are no longer needed. It will also be the proponents' responsibility to remove the E&S measures when they are no longer needed. Sp sere y, U AIAtq A. TARIA File: H:\WP\LETTERS\JJ6000.IDC I ✓<y1�.« 010 z� s_ 3tq� rc Is � f3 to- 5— 4 . t � NF t 3