Loading...
HomeMy WebLinkAboutPAR2017-00030 - PAR Application - 10/30/2017 MASON COUNTY ( � 3 L�? Oa� DEPARTMENT OF COMMUNITY DEVELOPMENT �l Building Division Mason County Bldg. 8, 615 West Alder Street, Shelton, WA 98584 www.co.mason.wa.us (360)427-9670 Belfair(360)275-4467 Elma (360)482-5269 MASON COUNTY PRE-SUBMISSION CONFERENCE NOTES • BUILDING DEPARTMENT REPRESENTATIVE: Tricia Woolett (360) 427-9670 ext. 281 E-Mail: tw@co.mason.wa.us • DATE: October 30, 2017 at 11:00 am FILE • PROJECT/ PROJECT TRACKING NUMBER: PAR2017-00030 COPY • PROJECT REPRESENTATIVE (S): Kimberly Studerus 360.850.8501 DESCRIPTION & SIZE OF PROJECT/OCCUPANCY CLASSIFICATION & USE: Change from a veterinarian clinic to a dentist clinic. Both of B occupancies. Project will require alterations, remodel in addition a 120 sq ft of new floor area for dentist office. Complete Building Permit Applications and construction plans must include the following information: • Code Analysis: Must be completed by a Washington State Licensed Design Professional for the scope of work. • SETBACKS TO PROPERTY LINES: Provide a site plan, drawn to scale. Clearly identify all structures, including fences, parking and other similar items, with setback dimensions on site the plan. The Building permit for the addition must include a scaled site plan showing all setbacks and development on the lot. • DISTANCES TO OTHER STRUCTURES: Site plan, drawn to scale shall clearly identify distances, where required include fire-resistive details, including continuity, &tested assembly details. • FIRE RESISTANCE FOR EXTERIOR WALLS: When applicable include fire-resistive details, including continuity, &tested assembly details. • IDENTIFY TYPE OF CONSTRUCTION & PROVIDE ALLOWABLE AREA CALCULATIONS WHERE NEEDED. See Chapter 5, IBC VB Type construction • FIRE-RESISTIVE RATED CONSTRUCTION &TYPE OF CONSTRUCTION: Where required demonstrate compliance. Identify the location of the assembly, compliance to continuity requirements and construction details: EXTERIOR WALL (IBC704), FIRE WALL (IBC705), FIRE BARRIER (IBC706), SHAFT ENCLOSURES (IBC 707), FIRE PARTITIONS (IBC 708), SMOKE BARRIERS (IBC 709), SMOKE PARTITIONS (IBC 710), HORIZONTAL ASSEMBLIES (IBC 711), PENETRATIONS (IBC 712), FIRE- RESISTANT JOINT SYSTEMS (IBC 713), FIRE-RESISTANCE RATING OF STRUCTUURAL MEMBERS (IBC 714), OPENING PROTECTION (IBC 715), DUCT & AIR TRANSFER OPENINGS (IBC 716), CONCEALED SPACES (IBC 717), ETC, • NUMBER OF EXITS REQUIRED/OCCUPANT LOAD:(IBC 1004): Table 1004 is used to determine occupant load used to evaluate the structure for exiting purposes, plumbing fixture requirements, Y and other code related concerns. Include design calculations, demonstrating how occupant loads were calculated, on building plans. • EXIT PLAN: Clearly identify the exit path and exit signage on construction plans. • ENGINEERING REQUIRED: Structures that do not comply with prescriptive specifications of the 2015 International Code(IBC) shall be designed in accordance with Chapter 16 of the IBC. Referencing Washington State RCW 18.08.410 -Structures 4000 sq. ft or more shall have all plan pages reviewed and stamped by a Washington State licensed design professional. The review shall include a code evaluation addressing life-safety, plumbing & mechanical evaluation, and structural analysis. (ref. RCW 18.08.410) ALL PLAN PAGES SHALL BE STAMPED AND SIGNED BY THE DESIGN PROFESSIONAL, including plumbing and mechanical pages. • ACCESSIBILITY REQUIRED: YES, include compliance information including design calculations demonstrating compliance to Chapter 11 and details demonstrating compliance to ANSI 117.1 in effect at the time of submittal. Include information demonstrating compliance for restrooms, employee work areas, parking spaces, accessibility to structure, drinking fountain, signage, etc. When required verify that building plans contain compliance information. The route and entrance to structure must meet of exceed requirements for accessible route and entrance. See attached information regarding Accessibility. Must have at least one restroom ADA compliant. Accessibility signage must be provided. • PLUMBING SYSTEMS (Chapter 29 Washington Amendment to IBC): Using IBC Chapter 10, determine occupant load. The number of plumbing fixtures is determined based upon the occupant load. Plumbing fixtures need not be provided for unoccupied buildings. Permitted building shall comply. On plans, include design calculations for the following: water closets (M/F), Lavatories, Drinking Fountains, etc. Occupant load= 25 Referencing IBCMAC 2902.2 separate plumbing fixtures shall be required for each sex, except when the calculated occupancy load is 15 or less, and then unisex fixtures shall be allowed. Plumbing fixture count can be for the entire facility, including all structures) for compliance purposes. Provide design calculations demonstrating how the fixture count was determined on construction plans. • LIGHTING: All non-residential structures shall comply with IECC/WSEC lighting requirements. Complete compliance forms and provide a lighting plan that includes switching locations. WSEC forms and information can be accessed at: All new or replacement lighting is subject to current code. Lighting: hftp://neec.net/sites/default/files/neec codes/forms15/LTG15-v1.xlsm • Ventilation and Indoor Air Quality Code compliance: Provide calculations and compliance documentation. • PROVIDE a SPACE FOR STORAGE OF RECYCLED MATERIAL & SOLID WASTE (WAC51-50-009)- Identify the location on site plan. • SPECIAL INSPECTION: Referencing IBC Chapter 17, Section 1704.1.1. When required a Statement of Special Inspections must be prepared by registered design professional in responsible charge. A completed Special Inspection authorization form must be submitted prior to permit issuance. • INTERIOR FINISHES: Include information demonstrating compliance to Interior finishes required in IBC Chapter 8. • STORAGE SPACES: Identify material stored, anticipated quantities, height, and if hazardous, include MSDS sheets for each product. • STORAGE RACKS: greater than 59" shall be permitted either with the proposed project or separate building permit. Where required documents shall include design information demonstrating stability for seismic conditions. Special inspection may be necessary, reference IBC Section 1707.6 and 1705.3 (4.5), storage racks, provide compliance information. • MECHANICAL EQUIPMENT: Identify the location and type of mechanical equipment located within, and outside the structure. Address foundation and support systems for equipment. Where any new or replacement equipment will be placed on site provide UL listing information and/or construction documents are required. If new heating and cooling systems are installed must provide calculation for system showing efficiency and code compliance. Where applicable include duct information and duct support compliance information. • FIRE MARSHAL REQUIREMENTS: Fire Marshal comments requirements including fire protection requirements and identify compliance information on the proposed building plans. Show the location of fire extinguishers and identify type. The following items must be completed for the project approval: • WATER SUPPLY & FIRE HYDRANT: Referencing IFC, Section 508; clearly identify fire hydrant location if one is located within 400 ft of the project. • FIRE FLOW: A copy of the approved method for determining fire flow is enclosed. Complete the Commercial fire-flow worksheet to identify fire flow and fire protection that may be necessary. Note that when fire flow is not available step 3 shall apply. See also requirements for IBC Table 503, allowable areas: 0-500 sq ft.: no protection (mitigation) needed. 501-5,999 sq ft.: Install a NFPA 72 addressable fire alarm system OR construct firewalls in accordance with IBC Section 706 to create maximum 2,000 sq ft fire areas. 6,000-12,000 sq ft.: Install NFPA 13 automatic fire sprinkler system OR install NFPA 72 addressable fire alarm system maximum 6,000 sq ft fire area with fire walls constructed in accordance with IBC Section 706, OR construct firewalls in accordance with IBC Section 706 to create maximum 2,000 ft fire areas. 12,000 sq ft. or more: Install NFPA 13 automatic fire sprinkler system. • EMERGENCY VEHICLE ACCESS: "Standards for Fire Apparatus Access Roads: adopted through Mason County Code Title 14 Section 14.17 is attached. Submit documents should clearly identify code compliance. • ADDRESSING: Referencing IFC, Section 505 and Mason County Code Chapter 14.28, all new buildings shall have an approved address. • AUTOMATIC FIRE ALARM: Referencing IFC, Section 907 and NFPA 72, when proposed provide information on plans that identifies your intent to install the alarm system. Automatic fire sprinkler system requires a separate permit. • SPRINKLER SYSTEM: Referencing IFC, Section 903 and NFPA 13, when proposed provide information on plans that identifies your intent to install the NFPA 13 fire sprinkler system. • KNOX BOX: Referencing IFC, Section 50( id access shall be required. Contact your local Fire District for detail to order your Knox box. • LAND MODIFICATION: Any grading, fillip. 3r excavation in combination that exceed 200 cu yards will require a Land Modification Permit. If the •oject exceeds 500 cu yards it will also need a SEPA. Depending on the scope of the project y may need an engineered Stormwater Plan and Geological report to accompany this application. • SPRINKLER SYSTEM: Verify that desigi ilculations include additional load attributed to required fire sprinkler system. Sprinkler systems _ .:quire a separate permit. • SUSPENDED CEILING SYSTEMS: Prow' details and specifications relating to suspended ceilings where applicable. Please note we are in 2 seismic region. Details shall be designed and approved for seismic loading in accordance to IBc ;lapter 16. Where required designate special inspection plan. • STORMWATER MANAGEMENT: A Plan i °st be submitted in accordance with Mason County Code Title 14.48, Stormwater Management pie.. :-nust meet WA State Department of Ecology's 2005 Stormwater Regulations. PERMITS REQUIRED FOR PROJECT: o BUILDING (each structure) o PLUMBING / MECHANICAL (each structure) o GRADING PERMIT (When greater than 200 cubic yards) o CHANGE OF USE/OCCUPANCY 'cNhen each Tenant is identified for use) o FIRE SUPPRESSION, See Fire Marshal comments (each structure) o SIGN (each business) o FENCE (Greater than 7'0" above grade) o RETAINING WALL(S) (one permit for all walls on parcel) ADDITIONAL NOTES: Current Code: 2P 5 IBC and 2015 IECC/WSEC. ADDITIONAL REQUIREMENT FOR PERMITING: WHEN YOU SUBMIT PERMITS YOU WILL NEED TWO (2) COPIES OF YOUR SITE/PLOT PLANS, DRAWN TO SCALE, 11X17 PAPER SIZE, ALL NECESSARY PERMIT APPLICATIONS INCLUDING THREE (3) COMPLETE SETS OF BUILDING PLANS WITH CALCULATIONS WHEN REQUIRED. (NOTE: ALL PLAN PAGES SHALL BE STAMPED BY THE DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE WHEN: (1)THE STRUCTURE EXCEEDS 4000 SQ. FT., (2)THE STRUCTURE IS ENGINEERED/DESIGNED. • CONSTRUCTION PLANS, drawn to scale. Include floor plan, elevations, cross section, cross section, construction details, etc. • MECHANICAL PLAN, (If a deferred submittal must be indicated on plans at submittal) • PLUMBING PLAN AND (If a deferred submittal must be indicated on plans at submittal) • NON-RESIDENTIAL ENERGY CODE/VENTILATION & INDOOR AIR QUALITY CODE INFORMATION. • A PLAN REVIEW FEE WILL BE COLLECTED WHEN THE BUILDING PERMIT IS SUBMITTED. VALUATIONS ARE BASED UPON THE MOST RECENT BUILDING STANDARDS VALUATION DATA RECOMMENDATIONS AND THE PERMIT FEE WILL BE DETERMINED BASED UPON TABLE 1-A OF THE 1997 UBC. DESIGN CRITERIA: SEISMIC ZONE: D2 WIND SPEED: 85 MPH basic 110 ultimate, Exp. (Unless proven otherwise) GROUND SNOW LOAD: PSF REFERENCE CODE EDITIONS: Effective August 9, 2016 2015 INTERNATIONAL BUILDING CODE(IBC), INCLUDING APPENDIX CHAPTERS C, E AND H, EXCLUDING H106; SECTIONS 101 THROUGH 107, PUBLISHED BYTHE INTERNATIONAL CODE COUNCIL, AND EXCLUDING APPENDIX CHAPTERS A, B, D, F, G, I, J AND K AND;ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51- 50. 2015 INTERNATIONAL EXISTING BUILDING CODE(IEBC) 2015 UNIFORM PLUMBING CODE(UPC), PUBLISHED BY THE INTERNATIONAL ASSN. OF PLUMBING AND MECHANICAL OFFICIALS(IAPMO)AND ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51-56 AND WAC 51-57, EXCLUDING SECTIONS 102.4 AND CHAPTERS 12, 15,AND 16, PART I. 2015 INTERNATIONAL MECHANICAL CODE(IMC), PUBLISHED BY THE INTERNATIONAL CODE COUNCIL,AND THE 2009 INTERNATIONAL FUEL GAS CODE AS ADOPTED THROUGH THE WASHINGTON STATE BUILDING CODE WAC 51-52. 2015 INTERNATIONAL FIRE CODE (IFC) PUBLISHED BY THE INTERNATIONAL CODE COUNCIL, EXCLUDING APPENDIX A, D,AND K AND ADOPTING APPENDICES B,C,E,F, G AND ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51-54. 2015 INTERNATIONAL ENERGY CONSERVATION CODE(IECC), AS AMENDED BY WASHINGTON STATE BUILDING CODE WAC 51-11 To view the Mason County Building and Construction Code and adopted amendments go to the Mason County website at: www.co.mason.wa.us PROPOSED CHANGES: 1. Remove partition wall that was added to original waiting room to divide it from Veterinary Clinic's X-Ray room. 2. Replace plywood on exterior wall of waiting room and put windows in that match the ones that were previously removed when the Veterinary Clinic created their X-Ray room. (2 small upper windows and 2 lower windows) 3. Wall off entrance to alcove in waiting room and change entry point to main hallway. This also requires the removal of a portion of the wall in the alcove that is on the hallway side. 4. Former doctor's office and manager's office- Add sink to existing counter/cabinet areas and make a 2ft. opening on the hallway wall to create 2 points of entry to each room. 5. Bathrooms remain the same unless sinks or toilets need to be replaced for functionality. 6. 4 exam rooms on rear side of building need 2 ft. openings on hallway side wall to create 2 points of entry to each room. 7. 02 system will be updated to place piping in wall instead of on the exterior of wall. 02 will be added to exam rooms#1-7 and removed from former X-Ray room. Nitrous will be plumbed into each exam and surgical room. 8. Wall will be extended from Reception area to exterior wall on south side of building so that waiting room is separated from new X-Ray area. 9. Former X-Ray developing room becomes alcove for Panoramic X-Ray machine and entry is made from hallway that runs to rear of the building. 10. Sterilization room will be enclosed with a wall adjacent to the hallway that will now contain a 3ft. door. 11. Exam room#7 current doorway will be enclosed and 4 ft. X 3ft. window will also be added to exterior wall of this exam room. 12. Wall between Exam rooms#7 and#8 will be removed to create a 3ft. door and 2 ft. opening into Exam room#7 and a 3ft. 4in.X 7ft. 6 in. hallway will be created between Exam rooms#7 and#8. The new hallway will also allow for a 3ft. door and 2 ft. opening for Exam room#8. 13. 12 ft. X loft. 3in(approximately 120 sq. ft.) addition to the rear of building will create space for a small doctor's office(with a 4ft.X3 ft. window) and extend the current hallway back so that the rear exit door will now be flush with the rear of the building. 14. Entrance to lab from surgical operatory will be walled off and you will now enter the lab from a 3ft. door on the left side of the extended hallway. 15. Former Kennel room now becomes employee break room and will have a 4ft. X 3ft. window added to rear wall. The sink in this room will be replaced. 1 16. Isolation area of former Kennel room will now become employee bathroom with a wall mount toilet and small sink. 17. STUDERUS DENTAL sign on top of existing sign's concrete base. RECEIVED —� GuT 0 9 ton MASON COUNTY 615 W. Alder Street COMMUNITY SERVICES Building,Planning,Environmental Health,Community Health PAR 20 - d 0- G 615 W.Alder St.—Bldg.8,Shelton,W(985)4 Phone: 360 427-9670 ext 352♦Fax: 360 427-7798 DATE I PRE-APPLICATION CONFERENCE REQUEST FORM The purpose of the pre-submission conference is to identify and/or eliminate as many potential problems regarding a proposal. Representatives from the Fire Marshal's Office, Building Department, Environmental Health, Planning, and Public Works Departments may attend the meeting to discuss rules and regulations applicable to the proposed project. Topics covered during the meeting may include the comprehensive plan, land divisions, shoreline program, zoning, availability of sewer and potable water, development concepts, building construction, fire protection and life safety concerns of the proposed project. The pre-submission conference is intended as an informative meeting. The intent is to provide detailed information to the applicant in regards to codes and process. Incomplete applications will not be accepted. If application is deemed incomplete it will be returned. All Conferences are on Mondays(except holidays) To schedule a meeting you must complete the requirements for submittal including the required six(6) copies of detailed site plan(max. size 11"x17"). To submit either by mail or in person at: Mason County Permit Assistance Center at 615 W Alder Street,Shelton WA 98584 by 3:00 PM on the Monday two weeks prior the proposed meeting. Please make check payable to: Mason County Treasurer Check amount: $610.00 Owner: ' _ C Name: MH R l CIrlb' Gf�lL L u 5es 1 Mailing Address: �5EI Li A 1�52S Daytime Telephone: � D•�y Net Email address: r 11)L� dS ��� 0 gi/yt 1. Fax number: Representative: Name: 1'1'I Mailing Address: 1,� Daytime Telephone: (k)9g)•kgo I Email address: f5S/AIJd 6-ttf Z &�tw.(om Fax number: Tax Parcel Number(12 dig Site Address:KIF 9V*, H�'pu l'� eliv,LkA Rev.August 2017 ♦Description of Project: kenamoLt U uml hen - VX( h ffi 1 wc ►'�L I C�tl'il(�'4 r �iY iOf' tSZ� C Il� ix,, Wv 6S r GiLti faddi hcn of - ���llka- W1(X?ftkMt of iwdal GLMcd Aitrow i ne, m add(Nj . L") ill, , rn�� 11Aj-1 ateCL d-CAIVQ I^i i�j).rion 1 tb pic�tC 1x�Ihllev '!,� repiU , 4 *Square footage of st ucture: ir� lo6h1 jiici- ly�d ¢re ,6( e a, Waked ilvr ximc0kk� j L(% of L"�QitKL 'CX( c�h l�j � t-(�LhU"Z W�1 C1� tS CiFF Its inu 1,Sn=S "4'- • Use of building and rooms (i.e., office, warehouse, restaurant, storage, etc): ,I)eM_ffi�e, *Occupancy classification per IBC, Section 302.1, and construction type:, ♦ Will grading or excavation be included in the project?ICJ If so what is an estimate the amount of grading: cut —Cy , fill cy ♦ Will Forest Practices be included in the project?!�) If so what is the estimated amount of logging: board feet ♦ Are there any historical stormwater and/or geo echnical reports (prepared for previous development)? Please Indicate Yes ❑ No o\ ♦ Has the project been discussed during a previous Pre-Application Conference? If yes, please indicate date. U ♦ Will the building have employees? YesX No ❑ If yes, how many?!0 12. ♦ What is the proposed source of water? (Please indicate): ❑ Proposed Individual Well, ❑ Existing ' dividuaI well, ❑ Proposed water system,XExisting Water System, Name of existing water system: Ar 1�kf b IJt -1Ck ♦ What is the proposed source of sewage disposal? (Please indicate): ❑ Existing onsite sewage system, ❑ Proposed onsite sewage system,�4xisting sewer connection, ❑ Proposed sewer connection, Name of Sewer System connected to: ♦ Will the project include signage? Yes Nq❑ If Yes, describe; size, material and location: e cF 151m, ,Sc i t I f2� •t-hew afrfaAtNlr_ 1 sar"Z gize will �,_ Pau- tor, ♦ Is there a fire hydrant located within 400 feet? YesA No ❑ If, yes include on site plan. The following items must be included (attached): ♦Provide two sets of proposal/plans including a floor plan. Max. paper size 11" x 17". ♦Provide Six (6) copies of the site plan including all items required uired (see page3 ) Provide specific comments or specific questions we can help you with: 2 1 Site Plan Requirements 6 copies are required at submittal Include the following information ❑ Indicate Scale and North Arrow ❑ Property line dimensions, easements, and right-of-ways. ❑ The location of all existing and proposed structures. Include square footage of existing and proposed structures. ❑ Setback distance, in feet from all property lines and structures. ❑ Existing and proposed road access to and from the site. ❑ Parking sites ❑ Location of on-site sewage tanks and drainfields. ❑ Location of drinking water supply. Include location on the proposed site and surrounding parcels. ❑ Steep slope, wetlands, streams, and bodies of water ❑ Location of fire hydrants and emergency vehicle access roads, including grade. ❑ Surface and storm water run-off routes. ❑ The site plan should be provided on letter (8.5" by 11"), legal (8.5" by 14"), or 11" by 17" (a larger one could be provided in addition to this). ❑ If there are several buildings on the site and/or proposed, to label each one A, B, C, D, ... ❑ Show EXISTING drainage features (infiltration ditches, retention ponds, etc). ❑ Show BOUNDARIES, area and volume of proposed site disturbance (this includes clearing and grading limits, proposed timber harvest activity/tree-cutting, landscaping. ❑ Show all the existing and proposed impervious surface areas (including gravel driveway, loading, parking etc) in square feet. APPLICABLE BUILDING CODES 2015 International Building Code/2015 International Residential Code 2015 International Fire Code-ANSI A117 2015 International Mechanical Code—WAC 51-42 2015 Uniform Plumbing Code—WAC 51-56/51-47 2015 International Energy Code/Washington State Energy Code—WAC 51-11 C & 51-11 R Mason County Ordinance Title 14 &Code changes are on a 3 year cycle; effective in July of that particular year. LDate of Conference: G'1'� G_)Cjt- 23 2c717 Time of Conference: for,-� Location of Conference: 415 N 6th St, Shelton WA Planner: ,>1 �. ext. 2 �: R E'C�� '�'�o / ;_ E VED T 0 9 2017 615 W. Alder Street C� 110POs6fl�•`t`1aN r (A p f Avk. 2 j5vz APPROXMAI'R-SITE SKETCH �= Hydrant Former Doctors Clinic in Belfair N�°�i RECEIVED STUDERUS DENTISTRY OCT 0 9 2017 615 W. Alder Street ADDRESS: NE 23240 Highway #3 Belfair, WA 98528 TAX PARCEL NO: 12332-50-00021 LEGAL DESCRIPTION: That portion of Tracts 9 and 11 of Sam Theler's Home and Garden Tracts, Volume 4 of Plats, page 20, described as follows: Beginning at the intersection of the South line of the North 10 feet of Lot 11 with the Easterly line of State Highway; thence Northeasterly along said Highway 160 feet; thence East parallel to the South line of the North 10 feet of said lot 11; 500 feet; thence South parallel to the East line of said lot 11 to the South line of the North 10 feet of said lot 11 to the true point of beginning, according to the records of Mason County, WA. OWNERSHIP: JH RIGGER ENTERPRISES, a limited liability corporation in the State of Washington. PRE-SUBMISSION MEETING FOR MONDAY OCTOBER 23" , 2017 PAR2017-00030 APPLICANT: JH Rigger Enterprises LLC MEETING DATE AND TME: October 23rd 2017, 10:45am/11:00am-12:OOpm PARCEL NUMBER: 12332-50-00021 SITE ADDRESS: 23240 NE SR 3,Belfair PROJECT DESCRIPTION: Approx. 120sgft addition to existing structure and modification of prior vet clinic to suit its new use as a dental office.Addition of two sinks,replacement of toilet/sinks as needed,adding nitrous lines to existing 02 system,adding 02 to exam rooms where needed, removing partition wall in lobby,adding window in former kennel area and converting isolation room to employee bathroom, replacing 4 windows in lobby that had previously been boarded up) LOCATION: 615 W Alder St Bldg 8 lower level conference room(Health Dept) PLANNER: Ron Buckholt Ext 287 PUBLIC HEALTH STAFF: Alex Paysse Ext 279 MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT FIRE MARSHAL Mason County Bldg. III, 426 West Cedar Street, Shelton, WA 98584 www.co.mason.waus Shelton(360)427-9670 Belfair(360)275-4467 Elma (360)482-5269 October 16,2017 Fire Marshal Notes: Permit:PAR2017-00030 Name:JH Rigger Enterprises LLC FILE Fire Marshal Review Notes: COPY • All exit doors must swing in the direction of travel to exit(outwards)if calculated occupant load is over 49. • Post illuminated exit signs on all exits. • Provide emergency lighting per IFC 1006 • Fire extinguishers(minimum rating of 2A:1 OBC)shall be mounted not more than 5' above the ground. Travel distance cannot exceed 75'. • Fire access provided as required Mason County Title 14(Attached). • NFPA 72 Fire Alarm System Required(separate permit)if o Ambulatory Care facility...Buildings or portions thereof used to provide medical, surgical, psychiatric, nursing or similar care on a less-than-24-hour basis to persons who are rendered incapable of self-preservation by the services provided.IFC 2017 202.1 • All electrical must be L&I approved and be approved prior to final inspection. • Provide Mason County Fire Marshal Fire Flow Worksheet. • Knox box key access provided to local Fire District. Contact Captain Jeromy Hicks at 360-275-6711x 214 for ordering information. • MSDS sheets to be posted in notebook for use/review. • Med Gas must conform with IFC Chapter 5304,5305,and 5306. • Posted signs above doors "THIS DOOR TO REMAIN UNLOCKED WHILE THE BUILDING IS OCCUPIED". Reviewed by:Jeromy Hicks FIRC RECEIVED A � r b3 OCT 0 9 2017 1e 616 W. Alder Street t= ffie _ � LAR SJ � w I -7 x, -i4 T bX , UL Li ® Imtt ri ^7-- Et- SINX+ S 3 �] � � 4 •dui; �� � � REA t Ze CON c or PAW J00 Y- J Y-RAY L�' -`-,7�11 7w�- ' r _ - - E P WAII-q E IL tF}