HomeMy WebLinkAboutBLD2024-00532 Addition - BLD Inspections - 11/12/2024 MASON COUNTY 615 W.Alder St.Bldg 8,SHELTON,WA 98584
SHELTON:360-427-9670,EXT 352
COMMUNITY SERVICES
BELFAIR:360-275-4467,EXT 352
Building,Planning,Environmental He ltk Community lle lth ELMA:360-482-5269,EXT 352
www.co.mason.wa.us
INSPECTION CARD AND CERTIFICATE OF OCCUPANCY**
To schedule an inspection call or visit http://www.co.mason.wa.us/community-services/bid-inspection. hp
Permit Number BLD2024-00532 Date Issued 07/22/2024 Issued By
Project 256 SQ FT ADDITION
Site Address 211 N Potlatch Dr
Applicant KAUFMAN II ET AL EDMUND G
Contractor TOELLNER CONSTRUCTION
Contractor Phone 253.380.2004
Primary Code UPC IBC,IRC,IFC,IEC,IMC,& Type
Permit Type ADDITION OR REMODEL- Occupancy
RESIDENTIAL
-APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS.
-DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED.
-THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION,FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY.
-ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION.
-OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION.
**THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED.**
PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET
Public Works Access/Driveway Other
Health Septic Well
Deptartment
Planning Site Inspection
Department
Fire Marshall Fire Apparatus Access Fire Sprinkler
Auto Fire Alarm Hood and Duct
Other Final
Building Building Official: Community Services Designee
Department
Concrete Setbacks 7 IZS-- JTk Slab 7/2 ZY J
Footing Perimeter Point load Footing
Footing Interior 7 ?5_ zq Footing Decks/Porches
Foundation Stem Walls Other Eeo>etl 7 ZS Z'( JZk
Rough-In Groundwork Plumbing Framing ZZ ?ZK 3T2
Groundwork Mechanical Plumbing
Groundwork Gas Pipe Mechanical rVt'V-w
Gas Piping Shear Wall Nailing
Underfloor
Other
Insulation Slab 7 1 2S/2c/ Ceiling
Floor Vaulted Ceiling Z'f ZV
Walls 9 17,41 -LK Vapor Barrier 23' Zq J3k
A&Other R.Oo - Tn%,A L 10., $ 7/a'! bV$#_ R.ftA R to 7/25 21 -A
Wallboard Interior Wall Brace Panels Fire Walls
Nailing
Other
Final Building
Manufactured Setbacks Setup
Home
Concrete Foot/Runners Final
Other
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
lip Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
BLD2024-00532 ADDITION OR REMODEL-
RESIDENTIAL
PROJECT DESCRIPTION: 256 SQ FT ADDITION ISSUED: 07/22/2024
SITE ADDRESS: 211 N POTLATCH DR HOODSPORT
EXPIRES: 01/18/2025
PARCEL: 423185000002
APPLICANT: KAUFMAN II ET AL EDMUND G OWNER: KAUFMAN II ET AL EDMUND G
KATHERINE T SING KATHERINE T SING
BAINBRIDGE ISL,WA 98110 BAINBRIDGE ISL,WA 98110
206-313-4920
CONTRACTOR: TOELLNER CONSTRUCTION
2205 S 252ND ST
SEATTLE,WA 98198
253.380.2004
GENERAL CONTRACTOR'S LICENSE: TOELLNER CONSTRUCTION License: TOELLC'8560M
2205 S 252ND ST Expires: 09/19/2025
SEATTLE,WA 98198
253.380.2004
VALUATIONS: FEES: Paid Due
R-3 VB Residential, one- 256.00 $42,516.48 Change in Tenant-Minor EH $135.00 $0.00
and two-family Plan Review
Technology Surcharge $21.42 $0.00
Mechanical Base Fee $30.00 $0.00
Building Permit Fee $619.24 $0.00
Plan Check Fee $402.51 $0.00
State Fee-Residential $6.50 $0.00
Mechanical Fees $19.00 $0.00
Planning Review Fee $240.00 $0.00
Total: $42,516.48 Totals : $1,473.67 $0.00
FIXTURES
City Mechanical Fixtures
1.0000 Ductless Heat Pump
Printed by:Amber Selby on:07/22/2024 03:11 PM
Page 1 of 6
Ad
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
ADDITION OR REMODEL- RESIDENTIAL BLD2024-00532
REQUIRED INSPECTIONS
Setback Inspection Framing Inspection
Footing Inspection Mechanical Inspection
Foundation Wall-Pre-Pour Inspection Insulation Inspection
Slab Insulation BLD-Final Inspection
CONDITIONS
' Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly
corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of
pressure treated material.
* Concrete encased grounding electrodes must be installed and used at each new building or structure that is built upon a
permanent concrete foundation. In Mason County the electrical code is regulated by Washington State Department of Labor
& Industries(L&I).
For more information contact L&I for additional information. In Olympia call (360)902-6350 and in Bremerton call (360)415-
4000.
* The foundation/footing must be placed on undisturbed,firm-native soil. Proper frost depth, minimum 12 inches, shall be
observed below grade in undisturbed soils.
* Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather,
garage floor slabs and other vertical concrete work exposed to the weather shall have a minimum compressive strength of
3000 psi (IRC Table R402.2).
* A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit
application. Design, sizing, placement, inspection and maintenance of stormwater management systems shall be the
responsibility of the owner/agent of the developed parcel. It is the owner/agent/contractor's responsibility to ensure that
Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement
of any development activities. *NOTE if Stormwater Management option "A"was selected on the Small Parcel Stormwater
Management Application/Worksheet the document entitled "Managing Storm Drainage on Small Lots, The Small Parcel
Stormwater Site Plan" constitutes an approved plan based on the criteria listed on the application/worksheet. If the
development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of
Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other,
parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final
inspection of the building permit the owner/agent/contractor is acknowledging that all components of the stormwater
management system have been installed as approved on the stormwater site plan. Under the requirements of Mason County
Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior
approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose.
Printed by:Amber Selby on:07/22/2024 03:11 PM
Page 2 of 6
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
ADDITION OR REMODEL- RESIDENTIAL BLD2024-00532
* Adopted Washington State Energy Code Compliance has been approved as follows:
Heat Type: Electric or other than electric, Compliance Method: Prescriptive option Marine-4C, Window(Max U-
Factor):0.30, Skylight(Max U-Factor):0.50, Doors (Type/Max U-Factor):0.30 or less,Wall insulation R-21, Floor insulation
R-30, Ceiling Insulation min. R-49,Vault Insulation R-38, and Slab Insulation R-10.
Fuel Normalization Credits: Table 406.2
4 DHP with zonal electric resistance per option 3.4
Table 406.3—Energy Credits(Single Family)
3.4 Ductless mini-split heat pump system,zonal control: In homes where the primary space heating system is zonal electric
heating, a ductless mini-split heat pump system with a minimum HSPF of 10.0 shall be installed and provide heating to the
largest zone of the housing unit.
* All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted
classification. Any non-approved change of use or occupancy would result in permit revocation.
* Before renovating or remodeling activities in pre-1978 residential buildings or child occupied facilities and to ensure your
compliance with applicable Washington lead regulations, contact the WA State Department of Commerce Lead Paint
Program at; (360) 586-5323 or email lbpinfo@commerce.wa.gov.Visit www.commerce.wa.gov/lead for further information.
* Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and
MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either
private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an
existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance
contact the Mason County Public Works Department prior to construction at Ext 450
* A permanent certificate, completed by the builder or registered design professional, shall be posted on a wall in the space
where the furnace is located, a utility room, or an approved location inside the building. When located on the elctrical panel,
the certificate shall not cover or obstruct the visibility of the circuit directory label, service disconnect labek, or toher reqyired
Iabels.The certificate shall list the predominant R-values of insulation installed in or on ceiling/roof,walls,foundation (slab,
basement wall, crawlspace wall and/or floor), and ducts outside the conditioned spaces; U-factors for fenestration; and the
solar heat gain coefficient(SHGC)of fenestration.Where there is more than one value for each component, the certificate
shall list the value covering the largest area.The certificate shall list the type and efficiency of heating, cooling, and service
water heating equipment, duct leakage rates including test conditions as specified in WSEC Chapter 4, and air leakage
results if a blower door test was conducted.
Building envelope air leakage control shall be considered acceptable when tested to have an air leakage less than 5 air
changes per hour when tested with a blower door in accordanve with WSEC Section R402.4.1.2.
The blower door test results shall be recorded on the permanent certificate required located near the electrical distribution
panel. Air leakage testing is not required for additions less than 500 square feet. Reference WSEC R402.4.1.2.
Compliance certificates are available online at the WSU Energy program website titled, "WSEC 2015 Certificate"and are
available in or'/z sheets.
* The use, handling and storage of hazardous materials or flammable and combustible liquids is not allowed without the
approval of the Mason County Fire Marshal.
* All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed.The Building
Official may grant one or more extension of 180 days, upon the receipt of a written extension request prior to permit
expiration. Letter must indicate that circumstances beyond the control of the permit holder prevented action from being
taken.
Printed by:Amber Selby on:07/22/2024 03:11 PM
Page 3 of 6
Mason County
Mason County - Division of Community Development
615 W.Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
ADDITION OR REMODEL- RESIDENTIAL BLD2024-00532
* OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit
revocation.Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or
contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained
permission from all the necessary parties, including any easement holder or parties of interest regarding this project.The
owner or authorized agent represents that the information provided is accurate and grants employees of Mason County
access to the above described property and structure(s)for review and inspection. This permit/application becomes null&
void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of
180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT
APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION UNLESS OTHERWISE APPROVED.
* Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site
plan. Please check your"Approved Site Plan"to ensure these structures are shown and meet the setback conditions listed.
* Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance
with Mason County Code 14.28 and 14.17.
* All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor
increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way.
* Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division.There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
* The plan review check list and corrections are part of the approved plans and must remain attached. It is the responsibility
of the applicant, owner or contractor to make the required corrections indicated on the plans. Once the plans are marked
"APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is
responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or
removal of approved documents will result in failure of required building inspections.
* CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND THE ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All
construction must be in conformance with the international codes as amended and adopted by Mason County. Any
corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting
additional inspections.
* All property lines shall be clearly identified at the time of foundation inspection.
Printed by:Amber Selby on:07/22/2024 03:11 PM
Page 4 of 6
r t
Mason County
I.1>
Mason County - Division of Community Development
615 W.Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
ADDITION OR REMODEL- RESIDENTIAL BLD2024-00532
* Installation of heating equipment in a single-family residence shall meet the requirements of the current WSEC R403,
applicable sections of the IRC, and IMC.
Heating equipment shall be sized in accordance to ICC/WSEC, Section R403.7. Heating and design load calculations for the
purpose of sizing HVAC systems are required and shall be calculated in accordance with accepted practice, including
infiltration and ventilation. Design calculations shall be available for inspection during inspection.
Referencing IRC M1601.4, all ducts, air handlers,filter boxes, and building cavities shall be sealed. All joints of duct
systems and seams shall be made substantially air tight by means of tapes, mastics, liquid sealants, gasketing or other
approved closure systems. Closure systems used with rigid fibrous glass ducts shall comply with UL181A and shall be
marked 181A-P for pressure-sensitive tape, 181A-M for mastic or 181 A-H for heat-sensitive tape. Closure systems used
with flexible air ducts and flexible air connectors shall comply with UL181 B and shall be marked 181 B-FX for pressure-
sensitive tape or 181 B-M for mastic. Duct connections to flanges of air distribution system equipment or sheet metal fittings
shall be mechanically fastened. Mechanical fasteners for use with flexible nonmetallic air ducts shall comply with UL 181 B
and shall be marked 181 B-C. Crimp joints for round metal ducts shall have a contact lap of at least 1-1/2 inches (38 mm)
and shall be mechanically fastened by means of at least three sheet-metal screws or rivets equally spaced around the joint.
Closure systems used to seal metal ductwork shall be installed in accordance with the manufacturer's installation
instructions.
Duct tape is NOT permitted as a sealant on any ducts.When ducts are located in unheated spaces the ducts hall be
insulated to R-8
DUCT TIGHTNESS TESTING shall be conducted by person(s)trained to perform such testing. A signed affidavit
documenting test results in accordance to IECC/WSEC Section R403.3.3 shall be provided to the Mason County Building
Department prior to the final occupancy inspection. Affidavit forms are available on at the WSU-Energy Program website
titles, "Duct Leakage Affidavit"or"Duct Leakage Testing Results (Existing Construction)." Duct tightness testing is not
required if the air handler and all ducts are located within the heated space.
* By definition, propane tanks and heatpumps are structures,which must meet setback conditions. Please check your
"Approved Site Plan"to ensure these structures meet the setback conditions listed.
* The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the
approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule,
minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being
performed or approvals granted.
* All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
* Carbon monoxide alarms, listed as complying with UL 2075 shall be installed in accordance with manufacturer
specifications and in accordance with IRC Section R315.
Alarms shall be installed outside of each separate sleeping area in the immediate vicinity of the bedrooms and on each level
of the dwelling.
EXISTING DWELLINGS shall be equipped with carbon monoxide alarms when alterations (including addition or alteration of
fuel burning appliances), repairs, or additions requiring a permit occur, or when one or more sleeping rooms are added or
created.
* REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable
provisions of the current code and the manufacturer's installation instructions.
A drip edge shall be provided at eaves and gables of shingle roofs.
Printed by:Amber Selby on:07/22/2024 03:11 PM
Page 5 of 6
Mason County
Mason County - Division of Community Development
615 W.Alder St.
Building 8
Shelton,WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
ADDITION OR REMODEL- RESIDENTIAL BLD2024-00532
* WIND LOADS- Roof coverings shall be designed and tested to withstand the maximum basic wind speed. The basic wind
speed for Mason County is 85 mph with 110 mph gust factor.
* Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the
structure.
* The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more
than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards
for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to
another fire apparatus access road which connects to a county maintained public road.
* All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and
plans are not available on site,then approval will not be granted. In addition, a re-inspection fee (refer to current fee
schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections
being performed or approvals granted.
* A minimum of 90 percent of all permanently installed lamps in lighting fixtures shall be high efficacy lamps in accordance
with IECC/WSEC Section R404.1.
* All changes to"approved"building plans that effect compliance with the international codes as amended and adopted, or
any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
* PLANNING SETBACKS
Measured from furthest projection.
Front: 25'
Rear: 10'
Side: 20'
*Subject to EH setbacks
* Applicant/Owner assumes all responsibility if On-site Sewage Components are encumbered.
A.) Drainfield/Reserve requires a 1 Oft setback from all footing/foundations.
B.)Septic tank(s) requires 5ft setback from all footing/foundations.
C.) No foundation/Perimeter Drains within 30ft, down gradient of Drainfield/Reserve area.
D.)No Cut Bank(s)(greater than 5ft and over 45 degrees)within 50ft, down gradient of Drainfield/Reserve area.
* Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to
the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of
the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In
addition, a re-inspection fee(refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the
Building Department prior to any further inspections being performed or approvals granted.
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or no . The granting f a permit does not presume to give authority to violate or cancel
the provisions ny ther st to/lo law regulating construction or the performance of construction.
Issued B .
1 /A�,J L
Contractor or Authorized Agent: Date:
Printed by:Amber Selby on:07/22/2024 03:11 PM
Page 6 of 6