INSPECTION CARD AND CERTIFICATE OF OCCUPANCY**
To schedule an inspection call or visit http:/twww.co.mason.wa.us/community-services/bid-inspection.php
Permit Number COM2023-00055 Date Issued 08/2312023 Issued By hr)1 Qi
Project NEW PUMP STATION AND ASSOCIATED PIPING
Site Address UNKNOWN
Applicant MASON COUNTY UTILITIES AND WASTE MANAGEMENT
Contractor PAPE&SONS CONSTRUCTION,INC
Contractor Phone 1.253.851.6040
Prima Code 2018 IBC,IRC,IFC,IEC,IMC,& Type
Primary UPC YP
Permit Type NEW COMMERCIAL PERMIT Occupancy
-APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS.
-DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED.
-THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION,FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY.
-ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION.
-OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION.
**THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED.—
PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET
Public Works Access/Driveway Other
Health Septic Well
Deptartment
Planning Site Inspection
Department
Fire Marshall Fire Apparatus Access Fire Sprinkler
Auto Fire Alarm Hood and Duct
Other Final
Building Building Official: Community Services Designee
Department
Concrete Setbacks Slab
Footing Perimeter Point load Footing
Footing Interior Footing Decks/Porches
Foundation Stem Walls Other
Rough-In Groundwork Plumbing Framing
Groundwork Mechanical Plumbing
Groundwork Gas Pipe Mechanical
Gas Piping Shear Wall Nailing
Underfloor
Other
Insulation Slab Ceiling
Floor Vaulted Ceiling
Walls Vapor Barrier
Other
Wallboard Interior Wall Brace Panels Fire Walls
Nailing
Other
Final Building
Manufactured Setbacks Setup
Home
Concrete Foot/Runners Final
Other
cv-a,k S=t3-gA J-D- Sc.t SFZ �e� euw�wc,K-f5.
r
Mason County
Mason County - Division of Community Development
615 W.Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
F
3-00055 NEW COMMERCIAL PERMIT
ESCRIPTION: NEW PUMP STATION AND ASSOCIATED ISSUED: 08/23/2023
ESS: UNKNOWN MASON COUNTY EXPIRES: 02/19/2024
PARCEL: 123214300130
APPLICANT: MASON COUNTY UTILITIES AND WASTE OWNER: MASON COUNTY UTILITIES AND WASTE
MANAGEMENT MANAGEMENT
100 W PUBLIC WORKS DR 100 W PUBLIC WORKS DR
SHELTON,WA 98584 SHELTON,WA 98584
1.360.427.9670 X 652
GENERAL CONTRACTOR'S LICENSE: PAPE&SONS CONSTRUCTION, INC License: PAPESI'204DE
9401 54TH AVE NWSUITE AGIG HARBOR,WA 98332 Expires: 04/08/2025
1,253,851.6040
VALUATIONS: FEES: Paid Due
U VB Utility, miscellaneous 689.00 $45,804.72 Technology Surcharge $21.53 $0.00
State Fee-Commercial $25.00 $0.00
Building Permit Fee $652.57 $0.00
Plan Check Fee $424.17 $0.00
Planning Commercial Review $380.00 $0.00
Fee
Total: $45,804.72 Totals : $1,503.27 $0.00
REQUIRED INSPECTIONS
Setback Inspection KNOX BOX VERIFICATION
Footing Inspection 3rd Party Inspection Report
Foundation Wall-Pre-Pour Inspection Special inspection final
Framing Inspection BLD-Final Inspection
CONDITIONS
Printed by:Annie Wilson on:08/23/2023 11:41 AM
Page 1 of 3
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
NEW COMMERCIAL PERMIT COM2023-00055
* The foundation/footing must be placed on undisturbed, firm-native soil. Proper frost depth shall be observed below grade
in undisturbed soils.
* All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
* Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
* When parcel development requires direct access to state road(s), a Road Access Permit or Approval must be granted and
approved by the Washington State Department of Transportation. For more information contact Washington State
Department of Transportation, at(206)357-2620, ext. 630.
* All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and
plans are not available on site, then approval will not be granted. In addition, a re-inspection fee(refer to current fee
schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections
being performed or approvals granted.
* All property lines shall be clearly identified at the time of foundation inspection.
* The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more
than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards
for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to
another fire apparatus access road which connects to a county maintained public road.
* Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and
MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either
private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an
existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance
contact the Mason County Public Works Department prior to construction at Ext 450
* All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted
classification. Any non-approved change of use or occupancy would result in permit revocation.
* All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building
Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration.
Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No
more than one extension may be granted.
* All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor
increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way.
* CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND THE ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All
construction must be in conformance with the international codes as amended and adopted by Mason County. Any
corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting
additional inspections.
* WIND LOADS- Roof coverings shall be designed and tested to withstand the maximum basic wind speed. The basic
wind speed for Mason County is 85 MPH.
* All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or
any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
Printed by:Annie Wilson on:08/23/2023 11:41 AM
Page 2 of 3
Mason County
Mason County - Division of Community Development
615 W.Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
NEW COMMERCIAL PERMIT COM2023-00055
* When parcel development requires direct access to county road(s), a Road Access Permit or Approval must be granted by
the Mason County Department of Public Works. For any construction which is proposed to be located within 25'of a Mason
County road right of way, it is suggested to contact that office to review future planned work which may affect your project.
For more information contact Public Works, at(360)427-9670, ext. 450 or 100 W Public Works Dr. Shelton. The building
permit will not be finaled until the permit holder can show proof that the access permit from Public Works has been finaled
and approved.
* Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance
with Mason County Title 14.28 and 14.17.
* Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the
structure.
* The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the
approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule,
minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being
performed or approvals granted.
* An inspection performed by a representative of the geologist, their authorized representative, or engineer of record, shall
be completed on-site prior to the footing pour to verify that earthwork and foundation installation activities comply with the
Geotechnical report or assessment recommendations.
In addition a final inspection report, prepared by a representative of the geologist, their authorized representative, or
engineer of record shall be required to verify that erosion control, drainage and final work is completed in accordance to the
Geotechnical report or assessment recommendations.
Reports shall be submitted to the Mason County Building Dept., 615 W Alder St, Shelton, WA 98584, prior to the footing and
final inspections and available for inspection.
* In addition to the inspections required in IBC, Section 110, the owner, the engineer or architect of record acting as the
owner's agent shall employ one or more special inspectors who shall provide inspections during construction on the types of
work listed under Chapter 17 and as specified by the design professional. The special inspectors duties & responsibilities
shall be as specified in Chapter 17.
Special inspection reports shall be submitted to the Mason County Building Department, 615 W Alder St, Shelton WA 98584
and available for inspection. Inspection reports shall be completed and submitted to the dept. in a timely manner and shall
be submitted prior to the framing and final occupancy inspections.
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of any other state/local law regulating construction or the performance of construction.
Issued By: Anal Wl DyI
Contractor or Authorized Agent: 2ittt�� 1/►1 G� 'u, Date:
Printed by:Annie Wilson on:08/23/2023 11:41 AM
Page 3 of 3