Loading...
HomeMy WebLinkAboutGrading and Stormwater Plan Review - GRD Engineering / Geo-Tech Reports - 10/13/2003 i MASON COUNTY PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER Shelton,Washington 98584 DATE: October I P, 2003 INTER-DEPARTMENTAL COMMUNICATIONS TO: Tami Griffey, PAC—Building Inspector FROM: Alan A. Tahja, P/W- Co. Hydr. Engr. Work Order: BLD-03 SUBJ: -Gradiniz& Stormwater Plan Review NAME: J Bar D/Jesse Wallace _ Belfair GRD2003-00020 Tami, The engineered grading plan, and Stormwater Site Plan(SSP)prepared for the proposed expansion of the J Bar D Mini-Storage facility in Belfair have been received and reviewed by Public Works. The LMP Application indicates that approximately 9000 cubic yards of soil is proposed to be graded in preparing the site to accommodate the expansion of the existing storage facilities. Inspection of the plan sheets and contours generally supports the declared grading quantity. A major element of the proposed property development is the construction of temporary and permanent water quality protection features. The proposed stormwater management features plans conform with Ecology and Mason County's stormwater management requirements. An Operation and Maintenance(O&M)Covenant is still needed to cover the existing and proposed stormwater management features. The applicant delivered a copy of an acceptable O&M Covenant,but it had not been recorded, so was returned to the applicant for recording. Once the covenant has been recorded with the County Auditor's office, a copy of the recorded covenant needs to be delivered to Public Works for monitoring and administration. Public Works requests to be notified when the project is near completion, so that conformity of the work with the proposed plans can be verified. Please feel free to contact me at County extension 461 if you have any questions regarding these comments,or if you feel additional concerns deserve further attention. Si ely, I t � Ala A. Tahja - File:H.IWMGradinglJ Bar D R&R.doc WORK ORDE R - PUBLIC WORKS DEPT. (p work order Vq Date: D--c1—L Number. PERMITOQC��� Requested by: _ eL.l Date: Authorize 1 G"V� r jype 0j ate. O C TCMgRT,o: NAME J MAS:'N COUNTY PUBLIC C�+ CY/COMPANY BILLING ADDRESS . PHONE (B) Pub.Works Person in Charge: .� TO o ProJed Time Line. (from to dat esEsdmated Fldsh Date: ( ) Project start Gate: ,,,L c 7 ESTIMATED TOTAL VS: 78 — AQprmdmate haxs: COST ESTIMATE TOTAL$ Frirta f (D) p314 EmQloYee £Sa14 Z� ou IMMW e � �Q •�� G�- l� BAIE TOTALn EQUIPMENT USED: MATERIAL USED: ............::-----`.----A...:.7.✓.:.,. .. .....^:.-•v"x•.,^:-:..::•:y.:::::•..:.. .>r-., AeZFD`cJJ aaf�aw"'Ncia.. (Fl Actual Cost $ BARS: PROD : DATE " Hours IMMW TOTAL$ Name ;Rate �S Rate O A *r EQUIPMENT USED: urfft �Ji MATERIAL USED: TOTAL ALL i REC.� _ CiC* (G) BILLED DATE INV i PAID DATE =o— - � September 17'', 2003 Jesse B. Wallace President JBar D Mini Storage PO Box 2967 NE 23270 Hwy 3 Belfair, WA 98528 Re: Operation and Maintenance(O&M)Covenant Dear Jesse, Enclosed please find the O&M Covenant you dropped off at the County last week. The covenant is in proper form,and appears to contain appropriate information.Unfortunately,Public Works requires these covenants to be recorded before their delivery to Public Works. The County Auditor's office will charge a recording fee in the neighborhood of $9.00 for the recording.The Public Works Director has required unrecorded covenants to be delivered back to the applicant for recording. I've copied the following comments from the Pre-Application meeting we held,and I've made every effort to make this requirement clear; Access is under State control,and does not appear to raise any new issues(existing).A"storm drainage report"prepared for the property when developed as"J Bar D"has been reviewed,and raises the following issues:(1)the original plans provide for infiltration of roof runoff with infiltration trenches-the designs appear applicable to the current proposal.(2)Erosion and Sediment Control measures need to be implemented during construction.(3)An Operation and Maintenance(O&M)Covenant was requested to be created for the property in 1998,but no record of the covenant can be found.An O&M Covenant will be required to be created,recorded with the County Auditor's office,and a copy delivered to Public Works.O&M Covenant forms can be provided by Public Works on request. Contact Alan Tahja at County extension 461 (email: alant@co.mason.wa.us)regarding access and stormwater management issues. Please record the covenant,and deliver a copy of the recorded document to Public Works to complete this requirement.I'm sorry for the inconvenience,and appreciate your cooperation. Sincerely, ALAN A. TAHJA,PE County Hydraulic Engineer