Loading...
HomeMy WebLinkAboutSEP88 - SEP Determinations - 2/1/1988 DETERMINATION OF NONSIGNIFICANCE Description of Proposal : BELFAIR MOTEL - 28 RENTAL UNITS, TWO-BEDROOM MANAGERS APARTMENT, LAUNDRY/SERVICE AREA, OFFICE/LOBBY AREA AND 35-CAR PARKING LOT Proponent: RICHARD DONDERO Location of Proposal , including street address, if any: BEHIND THE CHINA PALACE; TRACT 5, SAM B. THELER'S HOME AND GARDEN TRACTS; SECTION 32, TOWNSHIP 23 NORTH, RANGE 1 WWM Leady Agency: MASON COUNTY DEPARTMENT OF GENERAL SERVICES The lead agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43. 21C.030(2) (c) . This decision was made after review of a completed Environmental Checklist and other information on file with the lead agency. This information is available to the public on request. There is no comment period for this DNS. X This DNS is issued under 197-11-340(2); the lead agency will not act on tFiis proposal for 15 days from the date below. Comments must be submitted by FEBRUARY 21 , 1988 Responsible Official : MIKE BYRNE 206-427-9670 Position/Title: DIRECTOR, DEPT OF GENERAL SERVICES Telephone: EXT. 366 Address: P.O. BOX 186, SHELTON, WA 98584 Date: FEBRUARY 1 , 1988 Signature: XC : DOT DOE HACCC APPLICANT i J - MASON COUNTY DEPARTMENT of GENERAL SERVICES Courthouse Annex I N. Fourth & W. Cedar P.O. Box 186 Shelton, Washington 98584 (206) 427-9670 building environmental health maintenance landfill parks&recreation fair/convention center planning sewer&water January 26, 1988 Robert Benedicto 4048 South 262nd Kent, WA 98032 Dear Mr. Benedicto: Enclosed is the Environmental Checklist which was submitted with the Belfair Motel Building Permit Application. For the most part, the checklist looks very good . However, some additional information needs to be added prior to Mason County making a determination on this proposal . In Mason County we are required to publish legal notice of any determinations for commercial projects and will review this proposal with the Board prior to making a determination. If you wish to expedite this matter please return the checklist and plans by 1:00 p.m., on Monday, February 1st, at the latest. My deadline for publication in the Belfair Herald legal section is Monday afternoon. The following sections need further information: Page 2, No. A.11 - Will there be 32 or 28 units? The blueprints show 32 units but the septic system is designed for 28 single units. Along this line, the use of single units for drainfield calculations one assumes only r motel room. If the motel rooms are person pe intended for double (or more) occupancy, the drainfield is currently r e indicate proposed number of occupants unders� zed. P1 Plans should p poP unit. Page 4, No. B.1.(h) - Needs additional language on methods used to minimize erosion wring construction ( i .e., work during dry period, stabilization of any cut and fill , etc .) . Page 4, No. B.3.(a) - Distance to Hood Canal? Page 8, No. 8(1 ) - The Comprehensive Plan designates this area as UrShow how the proposal is consistent with the urban setting and how it ties in with adjacent existing and projected land uses. Page 9, No. 9.(a) - Isn' t there one unit to be provided for a manager' s residence? How many units will be available for short term housing? Will there be any rental by the month? What income level is the motel aimed at? L Page 11 , No. 14 .(f) - Need projection of vehicular trips per day assuming "worst case" scenario. Projections should be based on full room. occupancy with several trips per day for each Page 11, No. 15 .(a) - The proposal has potential to increase the local demand on fire, police and medical services at least marginally. This should at least be acknowledged . In the next question you should outline any plans you have which would offset these impacts ( i .e., fire flow provided, security lighting, managers on site, etc .) . Finally, I will need a copy of the drainage plans. Thank you for your cooperation. Sincerely, Patti Miler-Crowley, Planner DEPT OF GENERAL SERVICES PMC/jw Encl . -2- ENVIRONMENTAL CHECKLIST Purpose of Checklist The State Environmental Policy Act (SEPA) , Chapter 43.21C RCM, requires all governmental agencies to consider the environmental impacts of a proposal before making decisions. An Environmental Impact Statement (EIS) must be prepared for all proposals with probable significant adverse impacts on the quality of the environment. The purpose of this checklist is to provide information to help you and the agency identify impacts from your proposal (and to reduce or avoid Impacts from the proposal , if it can be done) and to help the agency decide whether an EIS is required. Instructions for Applicants This Environmental Checklist asks you to describe some basic information about your proposal . Governmental agencies use this checklist to determine whether environmental Impacts of your proposal are significant, requiring preparation of an EIS. Answer the questions briefly , with the most precise Information known, or give the best description you can. You must answer each question accurately and carefully , to the best of your knowledge. In most cases, you should be able to answer the questions from your own observations or project plans without the need to hire experts. if you really do not know the answer, or if a question does not apply to your proposal , write "do not know" or "does not apply". Complete answers to the questions now may avoid unnecessary delays later. Some questions ask about governmental regulations, such as zoning, shoreline, and landmark designations. Answer these questions if you can. If you have problems, the governmental agencies can assist you. The checklist questions apply to all parts of your proposal , even If you plan to do them over a period of time or on different parcels of land. Attach any additional Information that will describe your proposal or Its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional Information reasonably related to determining If there may be significant adverse impact. Use of Checklist for Nonproject Proposals Complete this checklist for nonproJect proposals, even though questions may be answered "does not apply." IN ADDITION, complete the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (Part D). For nonproJect actions, the references in the checklist to the words "project, " "applicant, " and "property or site" should be read as "proposal ," "proposer," and "affected geographic area," respectively. A. BACKGROUND Q 1 . Name of proposed project, if applicable: - 11- ENVIRONMENTAL CHECKLIST 2. Name of applicant: D & D Builders Lompany 3. Address and telephone number of applicant and contact person: 36930 - 8th Avenue S. Federal }]ay, Washington 98003 2o6/874-2424 Contact: Robert Benedicto, 206/854-2145 4. Date checklist prepared: January 7, 1987 5. Agency requesting checklist: Mason County Department of General Services. 6. Proposed timing or schedule ( Including phasing, if applicable) : Construction scheduled to begin upon approval of building permit application. AnDlica.tion to be made, week of 11 Jan 88. No Phasing. 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. No 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. None 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? if yes, explain. None 10. List any government approvals or permits that will be needed for your proposal , if known. Building permit, .Sewage system permit, State Highway R.O.W. access permit, , Plumbing & mechanical _permit, sign permit, D.O.T. approval for storm water control system. _ 11. Give brief, complete description of your proposal , including the proposed uses and size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal . You do not need to repeat those answers on this page. Construction of two story wood frame, thirty-two unit motel, (8088 G.S.F. on 2.47 Acres site. -2- ENVIRONMENTAL CHECKLIST 12. Location of the proposal . Give sufflclent information for a person to understand the precise location of your proposed project, including a street address, If any, and section, township, and range. If a proposal would occur over a range of area, provide the range or boundaries of the site(s) . Provide a legal description, site plan, vicinity map. No street address assigned at this time. Section 32-T.23 N R. 1 W. - W.M. described as follows: Tract 5 of Sam B. Theler's Home & Garden Tracts, excepting the North 140 feet, as measured along the East line of said plat, as recorded in Volume 4 of plats, Page 20, Records of Mason County, WA (site plan attached) TO BE COMPLETED BY APPLICANT B. ENVIRONMENTAL ELEMENTS 1 . Earth (a) General description of the site (circle one) : flat, rolling, hilly , steep slopes, mountainous, other N.A. (b) What is the steepest slope on the site (approximate percent slope) ? 15% (c) What general types of soils are found on the site (for example, clay, sand, gravel , peat, muck)? If you know the classification of agricultural soils, specify them and note any prime farmland. Sand and gravel to depth of eight feet or more. (d) Are there surface indLcations or history of unstable soils In the immediate vicinity? If so, describe. No indications of unstable soil in immediate vicinity. (e) Describe the purpose, type, and approximate quantities of any filling or grading proposed. Indicate source of fill. Approximately 250CY of grading will be required to accomplish parking area grade. All fill (if required) will originate from site grading. ( f) Could erosion occur as a result of clearing, construction, or use? If so, generally describe. Yes. Some erosion could occur during initial clearing and foundation excavation, after which the disturbed areas would be stablized, and no further erosion is anticipated. ( g) About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? Faving and building impervious area will cover approximately 22,000 S.F. or 21%. of site area. -3- ENVIRONMENTAL CHECKLIST (h) Proposed measures to reduce or control erosion, or other impacts to the earth, If any: Site grading and clearing will be confined to the footprint area of building and parking, with the remainder of the site (approx. 2 Acres) - remaining undisturbed. Storm water'will. be controlled on site. . 2. Air (a) What types of emissions to the air would result from the proposal ( i .a., dust, automobile, odors, industrial wood smoke) during construction and when the project Is completed? If any, generally describe and give approximate quantities if known. Internal combustion engine emissions will occur from grading equipment during the clearing phase. After this and during the femainder of construction crew transportation vehicles and delivery vehicles will be _entering and leaving. UDon,cgmpletion, emmisions from custome3z automobiles will exist. - (b) Are-there any off_-site sources of emmissions or odor that may, affact:-,-• your proposal? . If so, generally describe. None (c) Proposed measures to reduce or control emissions or other Impacts to air, if any: None 3. Water ^ (a) Surface - 1 ) is there any surface water body on or in the immediate vicinity of the .-,- site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? if yes, describe type and provide names. if appropriate, state.-_ - what stream or river It flows into. None 2) Will the project require any work over, in, or adjacent to (withn 200 feet) the described waters? If yes, please describe and attach available plans. No 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and Indicate the area of the site that would be affected. indicate the source of fill material . None -4- ENVIRONMENTAL CHECKLIST 4 ) WIII the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. No surface water withdrawals will be required by this proposal. Surface water diversion will occur .at parking area, .where run off water will be 'collected in the narking lot drainage system. 5) Does the proposal lie within a 100-year floodplain? If so, note - location on the site plan. No 6) Does the proposal involve any discharges of waste materials to surface waters? if so, describe the type of waste and anticipated volume of discharge. - t No ( b) Ground 1 ) Will ground water be withdrawn, or will water be discharged to ground water? Give general descriPtion, purpose, and aPProximate quantities If known. Po groind water will be withdrawn. water will be discharged to ground water, rom storm water collection. 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any ( for example: domestic sewage; industrial , containing the following chemicals ...; agricultural ; etc. ) . Describe the general size of the system, the number of such systems , the number of houses to be served ( if applicable) , or the number of animals or humans the system(s) are expected to serve. 1 Domestic sewage. One system w/ two 1000 Gal. septic tanks plus pump,chamber and 216' of drain field- line. (c) Water Runoff ( including storm water) 1 ) Describe the source of runoff ( including storm water) and method of collection and disposal , if any ( include quantities, if known) . Where will this water flow? Will this water flow into other water? If so, describe. Run off from stem water will be collected at parking area and channeled to dry well system for on site discharge into ground. No run off water will be discharged into other water. 2) Could waste materials enter ground or surface waters? If so, generally describe. No waste materials to be on site other than from sewage system. -5- ENVIRONMENTAL CHECKLIST (d) Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: 4. Plants (a) Check or circle types of vegetation found on the site: X deciduous tree: alder, maple, aspen, other X evergreen tree: fir, cedar, pine, other shrubs X grass crop or grain wet soil plants: cattail , buttercup, bullrush, skunk cabbage, other water plants: water Illy, eeigrass, milfoll , other other types of vegetation (b) What kind and amount of vegetation will be removed or altered? Grass and brush from building- and narking area footprint area. (c) List threatened or endangered species known to be on or near the site. None (d) Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: None S. Animals (a) Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: birds: hawk, heron, eagle, songbirds, other: black birds mammals: deer, bear, elk, beaver, other: none fish: bass, salmon, trout, herring, shellfish, other: none (b) List any threatened or endangered species known! to be on or near the site. None (c) Is the site part of a migration route? If so explain. No (d) Proposed measures to preserve or enhance w( Idiffe, if any: None -6- ENVIRONMENTAL CHECKLIST 6. Energy and Natural Resources (a) What kinds of energy (electric, natural gas, oil , wood stove, solar) will be used to meet the completed project' s energy needs? Describe whether it will be used for heating, manufacturing, etc. Electric, heating & lighting. ( b) Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. No (c) What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy i f an : Impacts, y Design meets or exceeds Washington State energy code for R-value requirements. 7. Environmental Health (a) Are there any environmental health hazards , Including exposure to toxic chemicals, risk of fire and explosion, spill , or hazardous waste, that could occur as a result of this proposal ? If so, describe. No 1 ) Describe special emergency services that might be required. Fire protection service. 2) Proposed measures to reduce or control environmental health hazards, If any: Not applicable (b) Noise 1 ) What types of noise exist in the area which may affect your project ( for example: traffic, equipment, operation, other)? None 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis ( for example: traffic construction, operation, other) ? Indicate what hours noise would come from the site. On short term basis: construction noises, excavation equipment noises during initial work 8:OOA.M. - 4:OOP.M. during work week. Upon completion of project, noise will originate from traffic entering motel site, and should be no greater than that which exists from traffic on Highway 3 at present. -7- ENVIRONMENTAL CHECKLIST 3) Proposed measures to reduce or control nolse impacts, if any: None a. Land and Shoreline Use (a) What is the current use of the site and adjacent properties? Site is currently undeveloped with cleared area overgrown with weeds and brush where previously a structure existed. To the North and East are undeveloped parcels. Adjacent to the South is a church building. 'nest is a restaurant and parking lot. (b) Has the site been used for agriculture? If so, describe. No (c) Describe any structures on the site. 1 None . (d) Will any structures be demolished? If so, what? No (s) What is the current zoning classification of the site? None (f) What is the current comprehensive plan designation of the site? (g) if applicable, what Is the current shoreline master program designation of the site? Not applicable (h) Has any part -of the site been classified as an "environmentally sensitive' area? 14 so, specify. No ( i ) Approximately how many people would reside or work to the completed project? Two to four. (j) Approximately how many people would the completed project displace? None (k) Proposed measures to avoid or reduce displacement impacts, if any: Not applicable ( 1 ) Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, If any: Not applicable -4 -8- ENVIRONMENTAL CHECKLIST 9. Housing (a) Approximately how many units. would be provided, if any? Indicate whether high, middle, or low-income housing. Not applicable (b) Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-Income housing. Not applicable (c) Proposed measures to reduce or control housing impacts, if any: Not applicable t 10, Aesthetics " (a) What Is the tallest height of any proposed structure( s ) , not including- antennas; what . Is the prl'nclpal exterior building material (s) proposed? Maximum height of proposed building 22' APA Texture 1-11 plywood siding panels. (b) What views in the immediate vicinity would be altered or obstructed? None (c) Proposed measures to reduce or control aesthetic impact, if any: None i1. Light and Glare (a) What type of light or glare will the proposal produce? What time of day would It mainly occur? Walkway lamps are bracket type and low intensity incandescant. . Parking-area will be lighted by quartz spotlights directed towards stairs and parking area. - All are night lighting. (b) Could light or glare from the finished project be a safety hazard or Interfere with views? No (c) What existing off-site sources of light or glare may affect your proposal? None (d) Proposed measures to reduce -or control light and glare impacts, if any: No measures required. Location on site and undeveloped area-around proposal leaves nothing to impact. 12. Recreation (a) What designated and informal recreational opportunities are in the immediate vicinity? State nark, Puget Sound. -9- ENVIRONMENTAL CHECKLIST (b) Would the proposed project displace any existing recreational uses? If so, describe. No (c) Proposed measures to reduce or control impacts on recreation , including recreation opportunities to be provided by the project or applicant, if any: None 13. Historic and Cultural Preservation (a) Are there any places or objects listed on, or proposed for, national, state, or local preservation registers known to be on or next to the site? If so, generally describe. None (b) Generally describe any landmarks or evidence of historic, archaeological , scientific, or cultural importance known to be on or next to the site. None (c) Proposed measures to reduce or control impacts, if any: None 14. Transportation (a) Identify public streets and highways serving the site, and describe proposed access to the existing street system. Show on site plans, if any' State highway 3 - Proposed access will be paved access road from highway to proposed building - Approx. 150' (b) Is site currently served by public transit? If not, what is the approximate distance to the nearest transit stop? Do not know. (c) How many parking spaces would the completed project have? How many would the project eliminate? On site narking for 35 cars will be developed. No narking eliminated. -10- ` ENVIRONMENTAL CHECKLIST (d) Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe ( indicate whether public or private). No (e) Mill the project use (or occur in the immediate vicinity of ) water, rail , or air transportation? If so, generally describe. No ( f) How many vehicular trips per day would be generated by the completed project? if known, indicate when peak volumes would occur. Not known. (g) Proposed measures to reduce or control transportation impacts, If any: None 15. Public Services (a) Mould the project result in an increased need for public services ( for example: fire protection, police protection, health care, schools, other) ? If so, generally describe. No (b) Proposed measures to- reduce or control direct impacts on public services, if any. None 16. Utilities (a) Circle utilities currently available at the site: -electricity , natural gas, water, refuse services, telephone, sanitary sewer, septic system, other. (b) Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. Electricity, water and phone service. Utilities providing service not known. Underground power and water installation. C. Signature The above answers a true and complete to the best of my knowledge. I understand that he ead agenc s relying on them to make its decision. Signature: Date Submitted: J -)Ck\rS4 —tl— NOTICE OF ISSUANCE DETERMINATION OF NONSIGNIFICANCE (DNS) BELFAIR MOTEL Notice is given that on February 4, 1988, Mason County Department of General Services issued a Determination of Nonsignificance on the proposed construction of the Belfair Motel which would consist of 28 rentable units, manager' s apartment, laundry service area, office/lobby area and 35-car parking lot. The proposed motel would be located behind the China Palace; Tract 5 of Sam B. Theler' s Home and Garden Tracts; Section 32, Township 23 North, Range 1 WWM. Copies of the DNS and Environmental Checklist are available at the Mason County Planning Department, Annex I building, Fourth and Cedar, Shelton, Washington. Comments will be accepted on the proposal until February 21, 1988. Proponent: Richard Dondero Date of Issuance : February 4, 1988 End of Comment Period : February 21, 1988 BILL: RICHARD DONDERO E17691 HIGHWAY 106 BELFAIR, WA 98528