Loading...
HomeMy WebLinkAboutCOM2009- 00029 Final Heat Source - COM Permit / Conditions - 4/19/2010 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line(360)427-7262 Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Phone: (360)427-9670,ext. 352 Shelton, WA 98584 i iol$ COMMERCIAL BUILDING PERMIT COM2009-00029 • OWNER: BELFAIR COMMUNITY BAPTIST CHURCH RECEIVED: 3/26/2009 CONTRACTOR: LICENSE: EXP: ISSUED: 3/30/2009 SITE ADDRESS: 23300 NE STATE ROUTE 3 BELFAIR EXPIRES: 9/30/2009 PARCEL NUMBER: 123325000016 LEGAL DESCRIPTION: SAM B. THELER'S HOME & GAR TRS TR 7-A DOR#4656-001 PROJECT DESCRIPTION: DIRECTIONS TO SITE: REPLACING CURRENT HEAT SOURCE WITH TWO NEW HEAT PUMPS AND FURNANCES General Information Construction&Occupancy Information Type of Use: Insp.Area: No. of Units: Type of Constr., No.of Bathrooms: Occ. Group: Type of Work: MEC Fire Dist.: 2 No. of Stories: Occ. Load: Valuation: $ $ 500.00 Building Height: Pre-Manufactured Unit Information Square Footage Information Make: Length: Lot Size: Model: Width: Building: Year: Serial No.: Basement: Parking Spaces: Setback Information Shoreline&Planning Information Front: Ft. Shoreline: Ft. Rear: Ft. Slope: Ft. Water Body: Shoreline Desig.: Side 1: Ft. SEPA?: Comp.Plan Desg.: Side 2: Ft. Fire Protection System Information Auto Fire Alarm System?: Emergency Key Box?: Standpipe?: Auto Fire Sprinkler System?: Access Road?: Fire Extinguishers?: Fixed Fire Suppression System?: Fire Hydrants?: Fire Lanes?: COM2009-00029 Please refer to the following pages for conditions of this permit. 1 of 4 ., Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Furnace>100K 2 Plan Check Fee ARr '4197nnna -tinR 71 gggnnann Heat Pump 2 Building State Fee ARr. Rn7/9nna U rn gggnnann Building Permit Fee ARr. '1i97/9nn4 It1a7 9R ,,99nnQnn 81 Total $280.46 CASE NOTES FOR COM2009-00029 CONDITIONS FOR COM2009-00029 1) Owner/Agent is responsibleto post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 28 X 2) ALL CONSTRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND THE INTERNATIONAL CODE REQUIREMENTS AND OCCUPANCY IS LIMITED TO THE PERMITTED AND APPROVED CLASSIFICATION. ANY CHANGE OF US $ CCUPANCY WOULD RESULT IN PERMIT REVOCATION. CHANGE OF USE MUST BE APPROVED PRIOR TO CHANGE. x �L 3) Changes to approved building plans that affect compliance to the current Washington State Energy Code (WSEC), ventilation and Indoor Air Quality Cod Building/Plumbing/Mechanical Codes and/or Mason County Regulations shall be approved prior to construction. 4) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason Coun�l Building Inspector shall be made prior to requesting additional inspections. X 14 5) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant, Mason County ordinances and building regulations. X 6) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control X the per der have prevented action from being taken. No more than one extension may be granted. COM2009-00029 2 of 4 7) All approved plans are required to be on-site for inspection purposes. If inspection is called for and plans are not on site, Approval WILL NOT be granted. In addition, a reinspection fee, based on the current fee schedule, minimum one-hour will �Q g r ed and collected by the Mason County Building Department prior to any further inspections being performed or approvals granted. XV 8) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X 9) PROVIDE COMBUSTION AWrTO MANUFACTURE SPECS, BTU'S, 2006 IMC CODES. X This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection. OWNER OR AGENT: DATE: 3� — COM2009-00029 3 of 4 n ' O CONCRETE MECHANICAL MANUFACTURED HOME M. 0 co Footings /Setbacks Date By Ribbons Gas Piping o Interior Date By interior-Date By bale By 55 Fxter"Date BY Exterior-Date By 0 Point Load I Isolated Footings INSULATION pate By 9 Date By BG!SLAB INSULATION Data By FIRE DEPARTMENT Z Foundation Wails Floors Date By Date By Data By DECKS FRAMING walls Date By W D Date By Data By PROPANE TANKS Vault -I PLUMBING Date By CA Date By OTHER __4 Groundwork Attic n Type m Date By Data By Data By D.W.v DRYWALL Type. n Int.Brace Wall 0 Date By Date By Date _ By ic c Water Line Fire separation FINAL INSPECTION Dale By Date By Date J �����d By f p O Pass or Request Inspect. to Type of Insp. Fail Date Date Done By Comments 0