HomeMy WebLinkAboutSEP99-0150 Access to Existing Office - SEP Determinations - 10/20/1999 OPT-20-99 WED 09:57 AM SWRO FAX NO, 3604076305 P. 01/02
r
��Q,5'fAY'A•fey
o y
rew D
STATE OF WASHINGTON
DEPARTMENT Of ECOLOGY
P.O. Box 47775 • olympis, Washington 98504-7775 • (360) 407-6.300
October 20, 1999
Post-it"Fax Note 7671 Da Pages►
To From
Co,/Dept. co,
Mr. Randy Neff Phone# Phone u
Mason County Dcpartment of
Community DeveloptncnL FaX�� h�x a
PO Boa 578
Shelton, WA 98584
Dear Mr,Neff.
Thank you for the opportunity to comment on the mitigated determination of nonsignifica.ncc for a grading
project to provide access to an existing office includes clearing, grading,drainage and paving, excavation of 225
cubic yards and importing;3,750 for phase 11, on 1.52 acres (Case No, SEP99-01.50) located on the Fast Side of
SR-3 in Belf'air, .3 mile south of the intersection with SR-300 at the intersection with Canal Heights Drive as
proposed by Lester Krueger. We reviewed the environmental checklist and have the following comments:
The Highway 3 ditch is considered "Waters of the State". Any discharge of pollutants would be in violation of
Chapter 90,48,Water Pollution Control,and WAC 173-201A,Water Quality Standards for Surface Waters of
the State of Washington, and is subject to enforcement action.
Erosion and sediment control is it key to preserving habitat and preventing denudation of a developing;arc t. The
following;practices are recommended:
a. Soil in stockpiles should be stabilized or protected with sediment trapping measures to prevent soil
loss. All exposed areas at final grade, or areas that are not scheduled for work for more than 30 days
should be stabilized within 10 days during the period from April 1 to October 31 or immediately during
the period running from November 1 to March 31.
b. Clearing; limits and/or any casements or required baffers shotild be staked and!lagged in the field_
c. Provision should be made to minimize the tracking of sediment by construction vehicles onto paved
public roads. lfsedimcnt is deposited, it should be cleaned every day by shoveling or sweeping, Water
cleaning;should only be done after the area has been shoveled out or swept.
d. Paint and wall finishing equipment wash water should be disposed of in a way, which will not
zdvorsely impact the water quality of the state.
e. Source control best management practices such as plastic covering, mulch,temporary seeding, and
phased clearing should be used to control erosion during;construction-
Oil/water separators should, at a minimum,be designed,operated, and maintained in accordance with Ecology's
"Stormwater Management:Manual for the Puget Sound Basin" February 1992. This includes routine inspection
and maintenance of the separator,nd establishing a written log of such activity. Discharge from all oil/water
separator should not exceed the state guidelines established for discharges containing;oil and grease of mineral
origin.
OOT-20-99 WED 09:58 AM SWRO FAX NO. 3604076305 P. 02/02
W. Randy Neff
October 20, 1999
Page 2
Routine inspection and maintenance of all sediment vid erosion control devices is recommended both during
and after development of the site.
Dumpsters and rcfusQ collection containers must be leak free with close fitting covers. The drainage for refiise
containers and dumpster areas adjacent to or over the water trust be connected to the sanitary sewer or otherwise
designed to prevent leachate from being discharged to surface waters.
The owner must ensure that any prospective commercial or industrial tenant of a facility served by an on-site
septic tank and drainficld system has obtained till necessary approvals acid permits from the Dcpartment of
Ecology or the local health departinent before assurances of occupancy or permission to modify the terms of
occupancy can be given.
The on-site sewage system and reserve system must be installed at least 100 feet from surface waters.
1f you have any questions or would like to respond to these comments, please call Ms. Kerry Carroll (Water
Quality)at(360) 407-6294 or with any other questions regarding this proposal Ms. Kari Rokstad(SEPA
Coordinator)at(360)407-6787.
� 'nccrely,
Abbe White
SWRO Administration
AW: (99-6648)
cc: Kerry Carroll, SWRO/WQ
Kari Rokstad, SWRO/SEA
SEP99-0150
MASON COUNTY TAI
DEPARTMENT OF COMMUNITY DEVELOPMENT
Planning-Landfill-Utilities
MITIGATED
DETERMINATION OF NONSIGNIFICANCE
(WAC 197-11-350)
Description of Proposal :
Grading project to provide access to existing office, this project also
includes clearing, grading, drainage and paving. The applicant has
indicated that 225 cubic yards will be excavated and will be importing
3750 for phase II.
Proponent : LESTER KRUEGER
Location of Proposal : .Ba.�3O? .yQ.',0006-7
PARCEL#: 123325000002
SAM B THELER' S HOME & GAR TRS S 100 ' TR 1
The site is located in a portion of the NW 1/4 of the NE 1/4 of Section
32, Township 23 N. , Range 1 W. W.M. Mason County.
Lead Agency: MASON COUNTY
The Lead Agency for this proposal has determined that it does not have a
probable significant adverse impact on the environment . An Environmental
Impact Statement (EIS) is not required under RCW 43 .21C. 030 (2) (c) . This
decision was made after review of a completed Environmental Checklist and
other information on file with the Lead Agency. This information is
available to the public upon request . MITIGATION MEASURES ARE
ATTACHED.
Please contact PA/ at ext . �3 with any
questions .
This DNS is issued under 197-11-350 (2) , the Lead Agency will not act on
this proposal for 14 days from the date below. Comments must be
submitted by 10/20/99 .
DATE: 10/06/99
Signature of Ve onsible official Date
Responsible Official : Gary Yando
Director of Community Development
426 W. Cedar,
PO BOX 578 SKOKOM]SH TRIBE k21
Shelton, WA 98584 DOE FPD #
(360) 427-9670 WDF&W NICPW
MIT_DNS, rev: 08/23/96 DNR APPLICANT
Conditions of this Case are listed below:
Case No.:SEP99-0150
1 ) MITIGATED CONDITION #1 : The buffers that are shown on the plot
plan for this grading are on the south property line 10 foot,
which has been reduced by 1/2 with double the plantings. On the
east side of this lot the buffer is 10 foot with a wood stockade
fence 260 feet long and 8 foot high. The west property line
buffer is 20 foot buffer and the north line buffer is 10 foot with
a wood stockade fence 296 feet long and 8 foot high. The proposed
use for the parcel to the south of this site has been identified
as commercial TypelV per Ordinance # 82-96. If there is any
changes of uses on this site or to the parcel to the South of the
road then the buffers on this site will need to be adjusted to
meet the Mason County Development Regulations (Ord.# 82-96).
2) MITIGATED CONDITION #2: All future development of the proposed
site will be subject to the conditions that are listed. However,
this does not exempt future proposals from further review through
the SEPA process.
3) MITIGATED CONDITION #3: A Stormwater Site Plan (SSP) will be
created and implemented for this site. The Stormwater Site Plan
must meet the requirements of both Mason County Public Works and
the Washington State Department of Transportation.
X-----------------------
4) MITIGATED CONDITION #4: The applicant must record an instrument
to protect the infiltration pond for Hood Canal Heights. The
recorded instrument must be submitted to either Pam
Bennett-Cumming or Randy Neff prior to the issuance of Grading
Permit (#99-0020). The grading permit will not be issued until
the protective easement has been recorded.
5) MITIGATED CONDITION #5: Emergency vehicle apparatus access roads
shall conform with the requirements of the Uniform Fire Code and
Mason County Title 16. If the access road cannot conform, special
conditions will be placed on any building permit issued on
property that is served by a non-conforming access road. Contact
the Mason County Fire Marshal for details.
6) INFORMATIONAL ONLY: Residential developers and individuals shall
be required to control erosion during construction. Removal of
vegetation should be minimized and any areas disturbed should be
restored to prevent erosion and other environmental impacts.
X
7) INFORMATIONAL ONLY: Water quality is not to be degraded to the
detriment of the aquatic environment as a result of this project.
i
,:a :'um,',�v.?' +3! i4.,, ::N M4MV77cWrP ,• %;R�',x^ W,'T.
Michael F. Wnek, P.E. ,
u
Consulting Civil Engineer
1665 NW Sherwood Drive Bremerton WA 9831 360'-692-3802
LETTER OF TRANSMITTAL
TO: RANDY NEFF DATE: 09-30-99
MASON COUNTY
DEPT. OF COMMUNITY DEV. PROD. NO 235 (PARCEL-B / PHASE-2)
P.O. BOX 578
SHELTON, WA 98584 RE CLIFTON RIDGE B.P.
The following attached drawings are submitted for your use.
COPIES DATE NO. DESCRIPTION
10 09-30-99 - CONSTRUCTION DRAWINGS B-1, B-2 11"x17"
1 - - Plan view showing changes
1 - - Buffer Table showing changes
COMMENTS:
The attached 8.5" X 11" snapshots of drawing B-1 show the changes in
the plan and the buffer yard table, for the attached drawings.
The most significant change is that the east buffer yard has been changed
to "vacant" requiring a buffer yard "D".
The south parcel (Parcel-A / Phase-1) will remain as Category IV for
buffer yard calculations. Even though the south parcel is perceived to be
retail, it will be less than 10,000 square feet.
BY: 10
MICOLAL F.WNEK, P.E.
BUFFER YARD TABLE: PROPOSED LAND USE = CATEGORY IV (COMMERCIAL TYPE I)
<----PLANTINGS PER 100 ' (d) ----
BUFFER STD. PROPOSED UNDER-
ADJACENT ADJ. PROP. ADJ. PROP. YARD BUFFER BUFFER CANOPY STORY
PROPERTY USE USE CLASS TYPE WIDTH WIDTH FENCING TREES TREES SHRUBS EVERGREEN
NORTH COMMERCIAL V D 20 ' 10 . 0 ' (a) 8 ' STCKDE 0.00 6.00 9.00 3.00
--> EAST VACANT II D 20 ' 10 . 0 ' (a) 8 ' STCKDE 3. 00 6.00 9.00 0.00
SOUTH FUT. COM. IV B 10 ' 5.01 (b) NONE 2 . 00 4 . 00 6. 00 0.00
WEST COMMERCIALl IV B 10 ' 20 . 0 ' c NONE 0.75 2 .25 3. 75 0.00
NOTES:
(a) STANDARD BUFFER REDUCED 50o, FENCE INCREASED TO 8 '
(b) STANDARD BUFFER REDUCED 50a, MINIMUM PLANTINGS INCRESED 1000
(c) STANDARD BUFFER INCREASED >500, MINIMUM PLANTINGS REDUCED 250
(d) PLANTING RATES SHOWN TAKE INTO ACCOUNT THE INCREASE OR DECREASE DUE TO BUFFER VARIANCES
CLIFTON RIDGE BUSINESS PARK, PHASE 2
SEPA
07-29-99
MASON COUNTY
DEPARTMENT OF PLANNING
ENVIRONMENTAL CHECKLIST
To the Applicant:
The State Environmental Policy Act (SEPA), chapter 43.21 C RCW, requires
agencies to consider the environmental impacts of a proposal before making decisions.
This environmental checklist asks you to describe some basic information about
your proposal. Agencies use this checklist to determine whether the environmental
impacts of your proposal are significant, requiring preparation of an Environmental
Impact Statement (EIS). Please answer each question accurately and carefully, to the
best of your knowledge. In most cases, you should be able to answer the questions
from your own observations or project plans without the need to hire experts. If you
really do not know the answer, or if a question does not apply to your proposal, write
"do not know" or "does not apply". Complete answers to the questions now may avoid
unnecessary delays later.
The checklist questions apply to all parts of your proposal, even if you plan to do
them over a period of time or on different parcels of land. Attach any additional
information that will help describe your proposal or its environmental effects. The
agency to which you submit this checklist may ask you to explain your answers or
provide additional information reasonably related to determining if there may be
significant adverse impact.
1
A. BACKGROUND
1. Name of proposed project, if applicable.
CLIFTON RIDGE BUSINESS PARK
PHASE 1
2. Name of applicant.-
RICK KRUEGER
3. Address and phone number of applicant and contact person:
APPLICANT:
RICK KRUEGER
P.O. BOX 548
BELFAIR, WA 98528
360-275-9415
AGENT:
MICHAEL F. WNEK, P.E.
CONSULTING CIVIL ENGINEER
1665 NW SHERWOOD DRIVE
BREMERTON, WA 98311
360-692-3802
4. Date checklist prepared:
09-21-99
5. Agency requesting checklist:
MASON COUNTY
6. Proposed timing or schedule (including phasing, if applicable):
1999
7. Do you have any plans for future additions, expansion, or further
activity related to or connected with this proposal? If yes, explain.
YES, IT IS ANTICIPATED THAT THE OTHER PROPERTIES
INCLUDED IN THE BOUNDARY LINE ADJUSTMENT WILL
BE DEVELOPED INTO COMMERCIAL PROPERTY IN THE
FUTURE.
2
8. List any environmental information you know about that has been
prepared, or will be prepared, directly related to this proposal.
A SEPA CHECKLIST, FOR STREAM RESTORATION WORK
ALONG CANAL HEIGHTS DRIVE ON THE NORTH END OF
PROJECT PARCEL, HAS BEEN SUBMITTED RECENTLY.
9. Do you know whether applications are pending for government
approvals or other proposals directly affecting the property covered by
your proposal? If yes, explain.
YES, JARPA APPLICATION. SEE ITEM #8 ABOVE.
10. List any applications for permits or authorizations which have been,
or will be, submitted to local, state or federal agencies for the project or
project area.
GRADING PERMIT
(MASON COUNTY PUBLIC WORKS)
FOREST PRACTICES APPLICATION
(WASHINGTON STATE DEPT. OF NATURAL RESOURCES)
11. Give brief, complete description of your proposal, including the
proposed uses and the size of the project and site. There are several
questions later in this checklist that ask you to describe certain aspects
of your proposal. You do not need to repeat those answers on this
page. (Lead agencies may modify this form to include additional
specific information on project description.)
THE PROJECT PROPOSES TO CONSTRUCT A
COMMERCIAL PAD FOR FUTURE DEVELOPMENT. THE
PROJECT INCLUDES A BOUNDARY LINE ADJUSTMENT
BY MODIFYING THREE EXISTING ASSESSOR'S TAX
PARCELS. ONLY GRADING, DRAINAGE, AND PAVING
WORK IS CURRENTLY PROPOSED. HOWEVER THE
DRAINAGE SYSTEM IS CALCULATED FOR THE
INCLUSION OF A FUTURE BUILDING.
12. Location of the proposal. Give sufficient information for a person to
understand the precise location of your proposed project, including a
street address, if any, and section, township, and range, if known. If a
proposal would occur over a range of area, provide the range or
boundaries of the site(s). Provide a legal description, site plan, vicinity
map, and topographic map, if reasonably available. While you should
3
submit any plans required by the agency, you are not required to
duplicate maps or detailed plans submitted with any permit applications
related to this checklist.
THE PROJECT IS LOCATED ON THE EAST SIDE OF
STATE ROUTE 3 (SR-3) IN BELFAIR; 0.3 MILES SOUTH OF
THE INTERSECTION WITH STATE ROUTE 300. THE
PROJECT IS AT THE SOUTHEAST QUADRANT OF THE
INTERSECTION WITH CANAL HEIGHTS DRIVE. A
VICINITY MAP IS ATTACHED ON THE CONSTRUCTION
DRAWINGS.
Legal Description NW4, NE4, Section 32, T 23 N, R 1 W
Project Parcel Area 3.33 acres
Project Development Area 1.49 acres
ASSESSORS PARCEL NUMBER: 12332 50 00002
12332 50 00007
12332 50 00012
ACCESS TO THE PARCEL IS FROM CANAL HEIGHTS
DRIVE.
4
TO BE COMPLETED BY APPLICANT
B. ENVIRONMENTAL ELEMENTS
1. Earth
a. General description of the site (circle one): Flat, rolling, hilly, steep
slopes, mountainous other
WEST END: FLAT
EAST END: ROLLING
b. What is the steepest slope on the site (approximate percent
slope)?
25% IN EASTERN "ROLLING" TERRAIN.
+100% IN PORTIONS OF WESTERN PORTION USED
PREVIOUSLY AS A GRAVEL BORROW SOURCE.
c. What general types of soils are found on the site (for example,
clay, sand, gravel, peat, muck)? If you know the classification of
agricultural soils, specify them and note any prime farmland.
EVERETT SAND AND GRAVEL, GLACIAL OUTWASH.
d. Are there surface indications or history of unstable soils in the
immediate vicinity? if so, describe.
NO
e. Describe the purpose, type, and approximate quantities of any
filling or grading proposed. Indicate source of fill.
APPROXIMATELY 9,600 CUBIC YARDS MATERIAL WILL
BE EXCAVATED. 2,400 CY WILL BE PLACED AS FILL
WITHIN THE SITE. THERE WILL BE 7,200 CY OF EXCESS
MATERIAL THAT WILL BE HAULED FROM THE SITE.
f. Could erosion occur as a result of clearing, construction, or use?
If so, generally describe.
NOT SIGNIFICANTLY DUE TO SANDY SOILS. THE
CONSTRUCTION DRAWINGS INCLUDED STANDARD
EROSION CONTROL PRATICES.
5
g. About what percent of the site will be covered with impervious
surfaces after project construction (for example, asphalt or buildings)?
TOTAL SITE = 3.33 acres
TOTAL IMPERVIOUS = 0.88 acres
26% IMPERVIOUS
h. Proposed measures to reduce or control erosion, or other impacts
to the earth, if any:
DURING CONSTRUCTION, TEMPORARY EROSION
CONTROL MEASURES WILL BE IMPLEMENTED. AFTER
CONSTRUCTION ALL NON-PAVED AREAS WILL BE
REPLANTED TO GRASSES OR LANDSCAPING.
2. Air
a. What types of emissions to the air would result from the proposal
(i.e., dust, automobile, odors, industrial wood smoke) during
construction and when the project is completed? If any, generally
describe and give approximate quantities if known.
During construction:
EXHAUST EMISSIONS - CONST. & LOGGING EQUIPMENT
SMOKE - CONSTRUCTION & LOGGING DEBRIS FIRES
DUST - EARTHWORK
After construction:
TYPICAL PASSENGER VEHICLE ACCESS
b. Are there any off-site sources of emissions or odor that may affect
your proposal? If so, generally describe.
NO
c. Proposed measures to reduce or control emissions or other
impacts to air, if any:
WATER FOR DUST CONTROL
DEBRIS BURNING WITHIN PERMITTED TIME FRAMES
6
3. Water
a. Surface:
1) Is there any surface water body on or in the immediate vicinity
of the site (including year-round and seasonal streams, saltwater,
lakes, ponds, wetlands)? If yes, describe type and provide names.
If appropriate, state what stream or river it flows into.
YES, SEASONAL STREAM, TYPE V, UNNAMED.
2) Will the project require any work over, in, or adjacent to (within
200 feet) the described waters? If yes, please describe and attach
available plans.
THE STREAM RUNS ALONG THE NORTH SIDE OF THE
PROJECT SITE. THE WILL BE NO WORK WITHIN THE
STREAM BUFFER FOR THE SUBJECT PROJECT. THE
STREAM CORRIDOR ADJACENT TO THE SITE WILL BE
REHABILITATED BY A SEPARATE PROJECT.
3) Estimate the amount of fill and dredge material that would be
placed in or removed from surface water or wetlands and indicate
the area of the site that would be affected. Indicate the source of
fill material.
NONE.
4) Will the proposal require surface water withdrawals or
diversions? Give general description, purpose, and approximate
quantities if known.
NO
5) Does the proposal lie within a 100-year floodplain? If so note
location on the site plan.
NO
6) Does the proposal involve any discharge of waste materials to
surface waters? If so, describe the type of waste and anticipated
volume of discharge.
NO
7
b. Ground:
1) Will ground water be withdrawn, or will water be discharged to
ground water? Give general description, purpose, and
approximate quantities if known.
STORM RUNOFF WILL BE INFILTRATED BACK INTO THE
SOIL VIA AN INFILTRATION TRENCH.
2) Describe waste material that will be discharged into the ground
water from septic tanks or other sources, if any (for example..
domestic sewerage; industrial, containing the following
chemicals...: agricultural; etc.). Describe the general size of the
system, the number of such systems, the number of houses to
be served (if applicable), or the number of animals or humans
the system(s) are expected to serve.
NONE
c. Water Runoff (including storm water):
1) Describe the source of runoff (including storm water) and
method of collection and disposal, if any (including quantities, if
known). Where will this water flow? Will this water flow into other
waters? If so, describe.
RUNOFF SOURCE - PARKING LOT, BUILDING.
RUNOFF COLLECTION — CATCHBASINS AND STORM
PIPING.
RUNOFF ATTENUATION — INFILTRATION TRENCH.
RUNOFF VOLUME — INFILTRATION TRENCH IS
DESIGNED UP TO THE 100-YEAR EVENT, 0.65 ACRE-
FEET.
2) Could waste materials enter ground or surface waters? If so
generally describe.
YES: DEBRIS, SEDIMENTS, AND OIL DRIPPINGS FROM
PARKING AREAS.
8
d. Proposed measures to reduce or control surface, ground, and
runoff water impacts, if any:
RUNOFF QUANTITY CONTROLS: INFILTRATION
TRENCH
RUNOFF QUALITY CONTROLS: BIOFILTRATION
SWALE
4. Plants
a. Check or circle types of vegetation found on the site:
X_ deciduous tree: alder, maple, aspen, other
X_ evergreen tree: fir, cedar, pine, other
X_ shrubs
X_ grass
pasture
crop or grain
wet soil plants: cattail, buttercup, bulrush, skunk cabbage,
_ water plants: water lily, eelgrass, milfoil, other
_ other types of vegetation
b. What kind and amount of vegetation will be removed or altered?
ALL VEGETATION WITHIN THE CLEARING LIMITS WILL
BE REMOVED FOR GRADING AND CONSTRUCTION. THE
REMAINING AREA OF THE PARCEL (EAST OF
PROPOSED CONSTRUCTION) WILL BE THINNED BY
REMOVING A PORTION OF THE MERCHANTABLE
TIMBER; APPROXIMATELY 50 TREES PER ACRE WILL
REMAIN.
c. List threatened or endangered species known to be on or near the
site.
NONE
d. Proposed landscaping, use of native plants, or other measures to
preserve or enhance vegetation on the site, if any:
ALL DISTURBED AREAS NOT CONVERTED TO
IMPERVIOUS SURFACE WILL BE STABILIZED WITH
GRASS OR LANDSCAPING.
9
5. Animals
a. Underline any birds and animals which have been observed on or
near the site or are known to be on or near the site:
Birds: hawk, heron, eagle, songbirds, other:
Mammals: deer, bear, elk, beaver, other:
Fish: bass, salmon, trout, herring, shellfish, other: (NONE)
b. List any threatened or endangered species known to be on or near
the site.
NONE
c. Is the site part of a migration route? If so, explain.
NOT SURE
d. Proposed measures to preserve or enhance wildlife, if any:
NONE REQUIRED.
6. Energy and Natural Resources
a. What kinds of energy (electric, natural gas, oil, wood stove, solar)
will be used to meet the completed project's energy needs? Describe
whether it will be used for heating, manufacturing, etc.
BASIC UTILITIES FOR A TYPICAL COMMERCIAL
BUILDING.
b. Would your project affect the potential use of solar energy by
adjacent properties? If so, generally describe.
NO.
c. What kinds of energy conservation features are included in the
plans of this proposal? List other proposed measures to reduce or
control energy impacts, if any.
N/A.
10
7. Environmental Health
a. Are there any environmental health hazards, including exposure to
toxic chemicals, risk of fire or explosion, spill, or hazardous waste, that
could occur as a result of this proposal? If so describe.
NO
1) Describe emergency services that may be required.
NOT APPLICABLE
2) Proposed measures to reduce or control environmental health
hazards, if any:
NOT APPLICABLE
b. Noise
1) What types of noise exist in the area which may effect your
project (for example: traffic, equipment, operation, other)?
TRAFFIC
2) What types and levels of noise would be created by or
associated with the project on a short-term or a long-term basis (for
example: traffic, construction, operation, other)? Indicate what
hours noise would come from the site.
SHORT TERM: CONSTRUCTION & LOGGING
EQUIPMENT, 8:00 AM TO 5:00 PM (DURING
CONSTRUCTION ONLY, 12 MONTH DURATION)
LONG TERM: TRAFFIC NOISE
3) Proposed measures to reduce or control noise impacts, if any:
NONE REQUIRED
8. Land and Shoreline Use
a. What is the current use of the site and adjacent properties?
PROJECT SITE: TIMBER
11
ADJ. PROPERTIES: TIMBER, RESIDENTIAL &
COMMERCIAL
b. Has the site been used for agriculture? If so, describe.
NO
c. Describe any structures on the site.
ONE WOODEN FRAMED BUILDING
PARCEL 12332 50 00002
d. Will any structures be demolished? If so, what?
NO.
e. What is the current zoning classification of the site?
BELFAIR URBAN AREA
f. What is the current comprehensive plan designation of the site?
BELFAIR URBAN AREA
g. If applicable, what is the current shoreline master program
designation of the site?
N/A
h. Has any part of the site been classified as an "environmentally
sensitive" area? If so, specify.
UNKNOWN
i. Approximately how many people would reside or work in the
contemplated project?
25
j. Approximately how many people would the completed project
displace?
NONE
12
k. Proposed measures to avoid or reduce displacement impacts, if
any:
NONE REQUIRED
I. Proposed measures to ensure the proposal is compatible with
existing and projected land uses and plans, if any.
COORDINATION WITH MASON COUNTY DEPT. OF
COMMUNITY DEVELOPMENT.
9. Housing
a. Approximately how many units would be provided, if any? Indicate
whether high, middle, or low-income housing.
NONE
b. Approximately how many units, if any, would be eliminated?
Indicate whether high, middle, or low-income housing.
NONE
c. proposed measures to reduce or control housing impacts, if any:
N/A
10. Aesthetics
a. What is the tallest height of any proposed structure)s), not
including antennas; what is the principal exterior building material(s)
proposed?
BUILDING HAS NOT BEEN DESIGNED YET. IT IS
ANTICIPATED THAT IT WOULD NOT BE OVER TWO
STORIES IN HEIGHT.
b. What views in the immediate vicinity would be altered or
obstructed?
NONE.
13
c. Proposed measures to reduce or control aesthetic impacts, if any:
NOT APPLICABLE
11. Light and Glare
a. What types of light or glare will the proposal produce? What time
of day would it mainly occur?
VEHICLE HEADLIGHTS, NIGHTTIME.
b. Could light or glare from the finished project be a safety hazard or
interfere with views?
NO.
c. What existing off-site light sources of light or glare may affect your
proposal?
NONE
d. Proposed measures to reduce or control light and glare impacts, if
any:
NONE.
12. Recreation
a. What designated and informal recreational opportunities are in the
immediate vicinity?
INFORMAL FISHING AND BOATING EXIST IN THE
VICINITY. VARIOUS STATE AND COUNTY PARKS ARE
WITHIN SHORT DRIVING DISTANCE.
b. Would the proposed project displace any existing recreational
uses? If so, describe.
NO
c. Proposed measures to reduce or control impacts on recreation,
including recreational opportunities to be provided by the project
applicant, if any:
NOT APPLICABLE
14
13. Historic and Cultural Preservation
a. Are there any places or objects listed on, or proposed for, national,
state, or local preservation registers known to be on or next to the site?
If so, generally describe.
UNKNOWN
b. Generally describe any landmarks or evidence of historic,
archaeological, scientific, or cultural importance known to be on or next
to the site.
NONE
c. Proposed measures to reduce or control impacts, if any:
NOT APPLICABLE
14. Transportation
a. Identify public streets and highways serving the site, and describe
proposed access to the existing street system. Show on the site plans,
if any.
PROJECT ACCESS WILL BE FROM CANAL HEIGHTS
DRIVE.
b. Is the site currently served by public transit? If no, what is the
approximate distance to the nearest transit stop?
UNKNOWN.
c. How many parking spaces would the completed project have?
How many would the project eliminate?
APPROXIMATELY 65 NEW PARKING SPACES.
NO PARKING SPACES TO BE ELIMINATED.
d. Will the proposal require any new roads or streets, or
improvements to existing roads or streets, not including driveways? If
so generally describe (indicate whether public or private).
NO
15
e. Will the project use (or occur in the immediate vicinity of) water,
rail, or air transportation? If so generally describe.
NO
f. How many vehicular trips per day would be generated by the
completed project? If known, indicate when peak volumes would
occur.
APPROXIMATELY 10,000 SQUARE FOOT GENERAL
OFFICE BUILDING:
AVERAGE DAILY TRAFFIC = 250 TRIPS PER DAY
P.M. PEAK HOUR TRAFFIC = 34 VEHICLES PER HOUR
g. Proposed measure to reduce or control transportation impacts, if
p
any:
Y
NONE WARRANTED.
15. Public Services
a. Would the project result in an increased need for public services
(for example: fire protection, police protection, health care, schools,
other)? If so generally describe.
NO.
b. Proposed measures to reduce or control direct impacts on public
services, if any:
NONE
16. Utilities
a. Underline utilities currently available at the site: electricity, natural
gas, water, refuse service, telephone, sanitary sewer, septic system,
other (storm sewer).
THESE UTILITIES ARE AVAILABLE AT THE STATE
HIGHWAY.
16
I
C. SIGNATURE
The above answers are true and complete to the best of my
knowledge. I understand that the lead agency is relying on them to
make its decision.
Signature:
MICHAEL F. WNEK, P.E.
PROJECT CIVIL ENGINEER
Date Submitted: SEPTEMBER 21, 1999
Attachments:
CONSTRUCTION DRAWINGS C-1, C-2, DATED 09-20-99
CONSTRUCTION DRAWINGS C-3 DATED 07-21-99
\233\HISTORY\SEPA CIIFTON-BPI.DOC