Loading...
HomeMy WebLinkAboutBLD2024-01077 Reroof - BLD Inspections - 11/6/2024 INSPECTION CARD Mason County 615 W. Alder St. too Building 8, Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov PERMIT# BLD2024-01077 PROJECT ADDRESS 1520 E Trails Rd Belfair, WA 98528 PARCEL# 222237590020 PROJECT DESCRIPTION To reroof my house OWNER O'KEEFE CONNER MICHAEL ADDRESS 121 E BEAUMONT DR,APT B PHONE CONTRACTOR ADDRESS PHONE CONTRACTOR LICENSE LENDER INSPECTION INSP DATE Comments INSPECTION INSP DATE Comments Re-Roof-Final Inspection A � Mason County lip Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov B DD2024-01077 REROOF- RESIDENTIAL PROJECT DESCRIPTION: TO REROOF MY HOUSE ISSUED: 09/05/2024 SITE ADDRESS: 1520 E TRAILS RD BELFAIR EXPIRES: 03/04/2025 PARCEL: 222237590020 APPLICANT: O'Keefe, Conner OWNER: O'KEEFE CONNER MICHAEL 1520 E Trails RD 121 E BEAUMONT DR,APT B Belfair,WA 98528 SHELTON,WA 98584 3603492155 FEES: Paid Due State Fee-Residential $6.50 $0.00 Re-Roof Residential Base Fee $120.00 $0.00 Technology Flat Convenience $5.00 $0.00 Fee Totals : $131.50 $0.00 REQUIRED INSPECTIONS Re-Roof-Final Inspection CONDITIONS * All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. * The demolition and disposal of debris must meet the regulations of Mason County and Olympic Region Clean Air Agency (ORCAA). It is unlawful for any person to cause or allow the demolition (or major renovation) of any structure unless all asbestos containing materials have been identified and removed from the area to be demolished. Work shall not commence on an asbestos project or demolition project unless the owner or operator has obtained written approval from ORCCA.2490 B Limited Lane NW, Olympia WA 98502, 360.586.1044/800.422.5623 www.orcaa.org Printed by:Brittany King on:09/06/2024 09:16 AM Page 1 of 3 AP 11 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov REROOF- RESIDENTIAL BLD2024-01077 Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. Roof Slope: IRC Chapter 9. Roof slope must be indicated to ensure selected roof covering is allowed on designed pitch. ------------ ---- * CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. * All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed.The Building Official may grant one or more extension of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicate that circumstances beyond the control of the permit holder prevented action from being taken. * Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance contact the Mason County Public Works Department prior to construction at Ext 450 Insulation: R503.1.1 2021 WSEC - Roofs without insulation in the cavity and where the sheathing or insulation is exposed during re-roofing shall be insulated either above or below the sheathing. All attic/roof insulation must comply with section R402.2 and table R402.1.3 of the 2021 WSEC * Single rafter joist roof replacement shall be insulated to a minimum of R-38 allowing for a minimum of one-inch continuous vented airspace above the level of insulation. Attic Ventilation: IRC sectionR806 Enclosed attic and rafter area shall be supplied with cross-ventilation. ------------------ * OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null & void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION UNLESS OTHERWISE APPROVED. * All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. * REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable provisions of the current code and the manufacturer's installation instructions. A drip edge shall be provided at eaves and gables of shingle roofs. * WIND LOADS - Roof coverings shall be designed and tested to withstand the maximum basic wind speed. The basic wind speed for Mason County is 85 mph with 110 mph gust factor. Printed by:Brittany King on:09/06/2024 09:16 AM Page 2 of 3 Mason County Mason County - Division of Community Development 615 W.Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov REROOF- RESIDENTIAL BLD2024-01077 * All roof structures must be equipped with gutters, downspouts, and splash blocks or other approved conveyance/collection system. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By: _24::a A P11\ Contractor or Authorized Agent: A *4 j Date: Z Printed by:Brittany King on:09/06/2024 09:16 AM Page 3 of 3