HomeMy WebLinkAboutCOM2022-00057 Steel Bldg Storage - COM Inspections - 11/6/2023 INSPECTION CARD
_ Mason County
`r 615 W. Alder St. Bldg.8, Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
PERMIT# COM2022-00057 PROJECT ADDRESS 828 E HIAWATHA BLVD SHELTON, WA 98584
PARCEL# 320087590108 PROJECT DESCRIPTION Phase 1 NEW STEEL STORAGE BLDG Non-Heated/No energy
Mech/W-Hydronic
OWNER ROBBINS DONALD R&VALERIE ADDRESS 181 SE MORGAN RD PHONE 1.360.701.0415
CONTRACTOR ANDREW SPEAR CONSTRUCTION LLC ADDRESS 2000 W SHELTON VALLEY ROAD PHONE 360-490-0324
CONTRACTOR LICENSE ANDRESC951QQ LENDER
INSPECTION INSP DATE Comments INSPECTION INSP DATE Comments
Setback Inspection D 10-3 Rough-Plumbing Inspection I'(L -1-1;'2,
Footing Inspection bED ((3<<!. `uf Ex& c'01J; Mechanical Inspection J -7-210-
alt Pre=Pour— Insulation Inspection
ShearwaU4nsyeQctum Connection has been verified by
Framing Inspection J?Z 11-30• S L.t I( JpV1 BLD-Final Inspection -
UND��6RovaD YI��BN6 PA5S 96.0 /6-3
�nllt:ituR FOOtl�J6 - PASS DID t"A
e-)At CtoR T0o-l)A)6 -FA,(- 5e&A-t1Ar-k0j V��+
�µ �w ll^✓7IlYv�.
f /-ice ' ,.. k ( -2 g-23� S(a6 (0Stl�a�drt CCN ,. �av1V.,r�l 10- 14-ZZ JTL- / 44 ^A f-% k 1,0-k?j._3 JTL !''✓c W«. SGcI `ta<
,�t, �Kdipv6cc �t7iH� to-tl-t- 2z JZ- 1. tti" ''e ��lSc \ t/��v��cL�. Alt o-t'_ 4-4-C�5 A'w `j t4 Zs coK,Pl�f�
-
ad C(11ag -Ft
���, 20- L 3 J T2_ � �.1 ✓oJwt '�lvw•1..K� o�o�,(�.( e tit 4cc0 V4 Z
t - MASON COUNTY 360427-9670 Shelton ext.352
COMMUNITY SERVICES 36 60-482-52 Belfair ext.352
360-482-5269 Elma ext. 352
Building,Planning,Environmental Health,Community Health
615 W.Alder St. Bldg.8 - Shelton,WA 98584 www.co.mason.wa.us
CORRECTION/INSPECTION REPORT
PERMIT/CASE NUMBER:
ADDRESS/LOCATION:
FINDINGS•
Items listed above must be corrected to Lain compliance.
❑ THIS IS NOT A COMPLETE INSPECTION
❑ This structure has been inspected by Mason County Building Department and the items listed
above are in VIOLATION of Mason County laws and/or ordinances.
Call for re-inspection when corrections are made before proceeding with any further work.
❑ Make corrections, items will be checked on the next inspection.
❑ OK to
Date: ❑ Please contact our office regarding possible
Department: structural damage incurred by recent
,natural/man made"disasters.This is NOT a
Inspector: CORRECTION NOTICE.
DO NOT REMOVE THIS TAG
MCC14.12
MASON COUNTY 360-427-9670 Shelton ext. 352
360-275-4467 Belfair ext. 352
CQ)l COMMUNITY SERVICES 360-482-5269 Elma ext.352
Building,Planning,Environmental Health,Community Health
615 W.Alder St. Bldg.8 - Shelton,WA 98584 www.co.mason.wa.us
CORRECTION/INSPECTION REPORT
PERMIT/CASE NUMBER. CO "LOZ
ADDRESS/LOCATION:
FIN INGS•
n �
Q,
Items listed above must be corrected to gain compliance.
y IS IS NOT A COMPLETE INSPECTION
This structure has been inspected by Mason County Building Department and the items listed
'We are in VIOLATION of Mason County laws and/or ordinances.
all for re-inspection when corrections are made before proceeding with any further work.
Make corrections, items will be checked on the next inspection.
❑ OK to
Date: �O ' 22 ❑ Please contact our office regarding possible
Department: structural damage incurred by recent
Inspector: [ r 1 "natural/man made"disasters.This is NOT a
CORRECTION NOTICE.
DO NOT REMOVE THIS TAG
MCC14.12
Joshua Luck
From: Joshua Luck
Sent: Friday, September 29, 2023 1:40 PM
To: 'donald.robbins83@gmail.com'
Subject: COM2022-00057 Final Inspections Comments
Attachments: ADA Info.pdf
Good Afternoon,
Please see final inspection comment below. Let me know if you have any questions.
- ectrica na entire�uildt
- n y requir
Fire Marshal final/signoff required
Co`mple of bathroom fixtures
Ia&ta4-AQAZL b hats in hainrnnm ce)
Thank you
Joshua Luck I Deputy Building Official
Mason County Community Development
0: (360)427-9670 ext.726
C: (360)490-4077
www.masoncountVwa.gov
1
1
r p�
/1p �
Mason County
Mason County - Division of Community Development
615 W. Alder St. Bldg.8
Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
F
M2022-00057 NEW COMMERCIAL PERMIT
ECT DESCRIPTION: PHASE 1 NEW STEEL STORAGE BLDG ISSUED: 09/28/2022
HEATED/ NO ENERGY MECH/W-HYDRONICADDRESS: 828 E HIAWATHA BLVD SHELTON EXPIRES: 03/27/2023
PARCEL: 320087590108
APPLICANT: ROBBINS DONALD R&VALERIE OWNER: ROBBINS DONALD R&VALERIE
181 SE MORGAN RD 181 SE MORGAN RD
SHELTON, WA 98584 SHELTON, WA98584
1.360.701.0415
CONTACT: ANDREW SPEAR CONSTRUCTION LLC
2000 W SHELTON VALLEY ROADSHELTON,
WA 98584
360-490-0324
GENERAL CONTRACTOR'S LICENSE: ANDREW SPEAR CONSTRUCTION LLC License: ANDRESC951QQ
2000 W SHELTON VALLEY ROADSHELTON, WA Expires: 01/31/2023
98584
360-490-0324
VALUATIONS: FEES: Paid Due
S-1 IIB Storage, moderate 3600.00 $406,260.00 Technology Surcharge $99.32 $0.00
hazard Building Permit Fee $2,978.08 $0.00
Planning Commercial Review $380.00 $0.00
Fee
Plan Check Fee $1,935.75 $0.00
State Fee-Commercial $25.00 $0.00
IFC Plan Check Fee $80.00 $0.00
Planning Stormwater Review $300.00 $0.00
Plumbing Base Fee $25.00 $0.00
Plumbing Fees $27.00 $0.00
Total: $406,260.00 Totals : $5,850.15 $0.00
FIXTURES
Cat Plumbing Fixtures
1.0000 Bathroom Sink
Printed by:Ariane Paysse on:09/28/2022 01:07 PM
Pagel 0(4
Mason County
Mason County - Division of Community Development
615 W. Alder St. Bldg.8
Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
NEW COMMERCIAL PERMIT COM2022-00057
(sty Plumbing Fixtures
1.0000 For each repair or alteration of drainage or vent
piping, each fixture
1.0000 Number of Toilets
REQUIRED INSPECTIONS
Setback Inspection Rough-Plumbing Inspection
Footing Inspection Mechanical Inspection
Foundation Wall-Pre-Pour Inspection Insulation Inspection
Shearwall Inspection Connection has been verified by Health or Utilities
Framing Inspection BLD-Final Inspection
CONDITIONS
* All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor
increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way.
* All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted
classification. Any non-approved change of use or occupancy would result in permit revocation.
* All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and
plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee
schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections
being performed or approvals granted.
* All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building
Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration.
Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No
more than one extension may be granted.
* Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the
structure.
* Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982.The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
* Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly
corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of
pressure treated material.
* The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more
than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards
for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to
another fire apparatus access road which connects to a county maintained public road.
Printed by:Ariane Paysse on:09/28/2022 01:07 PM
Page 2 of 4
Mason County
Mason County - Division of Community Development
615 W. Alder St. Bldg.8
•N� Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
NEW COMMERCIAL PERMIT COM2022-00057
WIND LOADS- Roof coverings shall be designed and tested to withstand the maximum basic wind speed. The basic
wind speed for Mason County is 85 MPH.
REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable
provisions of the current code and the manufacturer's installation instructions.
A drip edge shall be provided at eaves and gables of shingle roofs.
All changes to "approved" building plans that effect compliance with the international codes as amended and adopted, or
any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
* Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and
MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either
private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an
existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance
and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting
from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any
construction which is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that
office to review future planned work which may affect your project.
The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the
approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule,
minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being
performed or approvals granted.
All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
` When parcel development requires direct access to state road(s), a Road Access Permit or Approval must be granted and
approved by the Washington State Department of Transportation. For more information contact Washington State
Department of Transportation, at (206)357-2620, ext. 630.
When parcel development requires direct access to county road(s), a Road Access Permit or Approval must be granted by
the Mason County Department of Public Works. For more information contact Public Works, at (360)427-9670, ext. 450 or
100 W Public Works Dr. Shelton. The building permit will not be finaled until the permit holder can show proof that the
access permit from Public Works has been finaled and approved.
Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance
with Mason County Title 14.28 and 14.17.
CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND THE ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All
construction must be in conformance with the international codes as amended and adopted by Mason County. Any
corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting
additional inspections.
Concrete encased grounding electrodes must be installed and used at each new building or structure that is built upon a
permanent concrete foundation. In Mason County the electrical code is regulated by Washington State Department of Labor
& Industries (L&I).
For more information contact L&I for additional information. In Olympia call (360)902-6350 and in Bremerton call (360)415-
4000.
All property lines shall be clearly identified at the time of foundation inspection.
Printed by:Anane Paysse on:09/28/2022 01:07 PM Page 3 of 4
Mason County
Mason County - Division of Community Development
615 W. Alder St. Bldg.8
Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
NEW COMMERCIAL PERMIT COM2022-00057
By definition, propane tanks and heatpumps are structures,which must meet setback conditions. Please check your
"Approved Site Plan"to ensure these structures meet the setback conditions listed.
* The foundation/footing must be placed on undisturbed, firm-native soil. Proper frost depth shall be observed below grade
in undisturbed soils.
" Front and Side setbacks are none, Rear yard setback is fifteen feet as it abuts to me restrictive zoning.
" Applicant/Owner assumes all responsibility if On-site Sewage Components are encumbered.
A.) Drainfield/Reserve requires a 1 Oft setback from all footing/foundations.
B.) Septic tank(s) requires 5ft setback from all footing/foundations.
C.) No foundation/ Perimeter Drains within 30ft, down gradient of Drainfield/Reserve area.
D.) No Cut Bank(s) (greater than 5ft and over 45 degrees)within 50ft, down gradient of Drainfield/Reserve area.
• A private stormwater maintenance agreement is to be issued prior to final occupancy.
• Temporary erosion/sediment control measures and permanent stormwater control measures to be constructed per plans
stamped by Michael Staten and dated 6/6/22. Pond seeding is required.
hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of any other state/local law regulating construction or the performance of construction.
Issued By: 4-1ane M%JJe
d �7
Contractor or Authorized Agent: Date: % 2�' Z L.
Printed by:Ariane Paysse on:09/28/2022 01:07 PM Page 4 of 4
evt v%lroteak
ereoteckvacaL' envi,rovuntev�taL o pra�ozine Roadwci
May 27,2023
Andrew Spear Construction
2000 W Shelton Valley Road
Shelton,Washington 98584
RE: Drainage Inspection for Robbins Development,848 E Hiawatha Blvd,Parcel No. 32008-75-
90108, Shelton,Mason County,Washington
To Whom It May Concern:
Envirotech Engineering, PLLC (Envirotech) has completed a site inspection on May 8, 2023 of the
referenced project in order to certify that the drainage conveyance pipes, structures, and all other
stormwater management systems have been constructed in compliance with the accepted plans. The
accepted stormwater management plans, dated June 6, 2022, was prepared by Envirotech (Project
#22092).
Based on our site inspection,it is my opinion that the drainage construction conforms to the intent of the
accepted stormwater plans and specifications.
Please call Michael Staten at 360-275-9374 if you have any questions or require additional information.
Sincerely,
Envirotech Engineering, PLLC
L CL5 bf-
/f.
SS110 1Lt
5/27/23
Michael Staten,P.E.
Project Director
'PO xox 984
-F�etfair, WaSKVi Oton 92522
Off: 360-2yt5:93y 4
CCLL: 360-689-6045
evLv%rotech@atotec��wicaliw faeovu
evev'WoteCh
ee&echwi.caL° 6wv%row ruewtaL°braiv�age°ROAGZY✓Ali
May 27,2023
Andrew Spear Construction
2000 W Shelton Valley Road
Shelton,Washington 98584
RE: Drainage Inspection for Robbins Development,848 E Hiawatha Blvd, Parcel No. 32008-75-
90108,Shelton,Mason County,Washington
To Whom It May Concern:
Envirotech Engineering, PLLC (Envirotech) has completed a site inspection on May 8, 2023 of the
referenced project in order to certify that the drainage conveyance pipes, structures, and all other
stormwater management systems have been constructed in compliance with the accepted plans. The
accepted stormwater management plans, dated June 6, 2022, was prepared by Envirotech (Project
#22092).
Based on our site inspection, it is my opinion that the drainage construction conforms to the intent of the
accepted stormwater plans and specifications.
Please call Michael Staten at 360-275-9374 if you have any questions or require additional information.
Sincerely,
Envirotech Engineering,PLLC
ctYr� �
WAsfj, -1rot
t
�045
NAt 5/27/23
Michael Staten,P.E.
Project Director
PO gox904
'getfA%r,wasi"Lwgtow g85'28
. Off: 360-2�5-93�-4
CtLL: 360-609-6045"
ewvi.rotec6�@geottehwLeaLLw fo.cow.
V�el1i5i d l i
t=�r
Revised MMATOR
12/01/2022 12:35:11 PM
d
°O
� � M6.
� �+• N 3
O y tc c p
Q
t� $4
Jt-18 A
COM2022-00057
Mason County
o, .-„: auNr O ro, W, O +W.�r�Nf, .w.,/.•.fv Permit Document
w •+w NIIEMIClp � �N�Ny.Cyrti O�lm�
aNbefore •• "". �;
peg, .re amocwxu roars ro.4�oevn..wo noes
1 { � � , Nam: - .emcw.waewrr.rwwawmn
'9wv (r � � 'f MRONa MLMIOIIflwkc.COw11V NNMlYGI �—
1 NL w.wllpltNl�TOM v®irDN rIK AtLL
NIUWICtw.p. _ _.____Y`wfM
Q14::
Boise wSingle 11-7/8" BCI® 6000-1.8 DF J05 (Joist)
BC CALC®Member Report Dry 2 spans I R cant. 116"OCS I Repetitive I Glued&nailed October
Build 8435
Job name: Robbins File name:
Address: Description:
City, State,Zip: AK Specifier:
Customer: Builders FirstSource Designer: Christy Clark
Code reports: ESR-1336 Company: Boise Cascade Woodinville
14-00-00 04-00-00
B1 132
Total Horizontal Product Length=18-00-00
Reaction Summary (Down I Uplift) (Ibs)
Bearing Live Dead Snow Wind Roof Live
B1,3-1/2" 379/31 87/0
B2,3-1/2" 612/0 153/0
Load Summary Live Dead Snow Wind Roof OCs
Live
Tag Description Load Type Ref. Start End Loc. % --go% 115% 160% 125%
1 Standard Load Unf.Area(lb/ft') L 00-00-00 18-00-00 Top 40 ► 10 16"
Controls Summary Value %Allowable Duration Case Location
Pos. Moment 1527 ft-Ibs 37.6% 100% 2 07-00-14
Neg. Moment -533 ft-Ibs 13.1% 100% 1 14-00-00
End Reaction 467 Ibs 32.7% 100% 2 00-00-00
Int. Reaction 764 Ibs 30.6% 100% 1 14-00-00
End Shear 447 Ibs 26.7% 100% 2 00-03-08
Cont.Shear 488 Ibs 29.1% 100% 1 13-10-04
Total Load Deflection U1073(0.154") 22.4% n\a 2 07-00-14
Live Load Deflection L/1295(0.128") 37.1% n\a 5 07-00-14
Total Neg. Defl. 2xL/1998(-0.114") n\a n\a 2 18-00-00
Max Defl. 0.154" 15.4% n\a 2 07-00-14
Cant. Max Defl. -0.114" n\a n\a 2 18-00-00
Span/Depth 13.9
%Allow %Allow
Bearing Supports Dim.(LxW) Value Support Member Material
B1 Wall/Plate 3-1/2"x 2-5/16" 467 Ibs n\a 32.7% Unspecified
B2 Wall/Plate 3-1/2"x 2-5/16" 764 Ibs n\a 30.6% Unspecified
BC FloorValue®Summary
BC FloorValue®: Subfloor:3/4"OSB,Glue+Nail
Minimum Enhanced Premium Subfloor Rating: Premium
Controlling Location:07-01-06
Cautions
Design assumes Top and Bottom flanges to be restrained.
Page 1 of 2