Loading...
HomeMy WebLinkAboutCOM2020-00017 Replace Vault Toilet - COM Inspections - 4/7/2023 INSPECTION CARD Mason County ' 615 W. Alder St. Building 8, Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov PERMIT# COM2020-00017 PROJECT ADDRESS 12830 W Shelton Matlock Rd Shelton, WA 98584 PARCEL# 520092260020 PROJECT DESCRIPTION REPLACE VAULT TOILET �7 \ OWNER WASHINGTON STATE DEPT OF FISH & ADDRESS 600 CAPITOL WAY N PHONE 360.584.3841 CONTRACTOR ADDRESS PHONE CONTRACTOR LICENSE LENDER INSPECTION INSP DATE Comments INSPECTION INSP DATE Comments 4et-Up4nspection , BLD-Final Inspection J7L -lq �3 eetbz&-tnspesiion GOMASON COUNTY 360-427-9670 Shelton ext.352 COMMUNITY SERVICES 36 60-482-5269-275-4467 lima e t.352 360-482-5269 Elma ext. 352 Building, Planning,Environmental Health,Community Health 615 W.Alder St. Bldg.8 - Shelton,WA 98584 www.co.mason.wa.us CORRECTIONANSPECTION REPORT PERMIT/CASE NUMBER: -ft CO!M ZO-2-0 - PAD 0l-1 ADDRESS/LOCATION: 12 S;p W SLR /,Fa✓t !�� r!C '�_ s'�4/�v" F NDINGS• A4 "k 3 �z�i -67611V x'400 aH Items listed above must be corrected to lain compliance. ❑ THIS IS NOT A COMPLETE INSPECTION ❑ This structure has been inspected by Mason County Building Department and the items listed above are in VIOLATION of Mason County laws and/or ordinances. %Qlfall for re-inspection when corrections are made before proceeding with any further work. Make corrections, items will be checked on the next inspection. OK to Date: Z-1L(-1 3 ❑ Please contact our office regarding possible Department:�3,yD structural damage incurred by recent Inspector: JTZ-- "natural/man made"disasters.This is NOT a CORRECTION NOTICE. DO NOT REMOVE THIS TAG MCC14.12 Mason County Mason County - Division of Community Development 615 W.Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov FPROJECT 0-00017 NEW COMMERCIAL PERMIT ESCRIPTION: REPLACE VAULT TOILET ISSUED: 01/31/2023 ESS: 12830 W SHELTON MATLOCK RD SHELTON EXPIRES: 07/30/2023 PARCEL: 520092260020 APPLICANT: WASHINGTON STATE DEPT OF FISH& OWNER: WASHINGTON STATE DEPT OF FISH& WILDLIFE WILDLIFE 600 CAPITOL WAY N 600 CAPITOL WAY N OLYMPIA,WA 98501 OLYMPIA,WA 98501 360.584.3841 VALUATIONS: FEES: Paid Due Project Valuation (BID, 13803.00 $13,803.00 State Fee-Commercial $25.00 $0.00 ESTIMATION..) Building Permit Fee $245.57 $0.00 Pre-application meeting - Major $220.00 $0.00 EH Plan Review Plan Check Fee $159.62 $0.00 Technology Surcharge $8.10 $0.00 Total: $13,803.00 Totals : $658.29 $0.00 REQUIRED INSPECTIONS Set-Up Inspection BLD-Final Inspection Setback Inspection CONDITIONS * Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. * All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. Printed by:Genie Mcfarland on:01/31/2023 10:59 AM Page 1 of 3 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov NEW COMMERCIAL PERMIT COM2020-00017 * OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null & void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. * Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. * All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No more than one extension may be granted. * CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. * The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road. * All property lines shall be clearly identified at the time of foundation inspection. * All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. * Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28 and 14.17. * All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. * Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. * All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way. Printed by:Genie Mcfarland on:01/31/2023 10:59 AM Page 2 of 3 e Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov NEW COMMERCIAL PERMIT COM2020-00017 * By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your "Approved Site Plan"to ensure these structures meet the setback conditions listed. * The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. * All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. * Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. * Lever hardware is required at doors. The unlatching of any door shall not require more than ONE operation. Hardware with locks must open with a single action from the egress side of the door. Door hardware shall allow egress doors to be readily open able from the egress side without the use of a key or special knowledge or effort. Handles, pulls, latches, locks and other operable parts on accessible doors shall have a shape that is easy to grasp with one hand and does not require tight- grasping, pinching, or twisting of the wrist to operate. X * Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather, garage floor slabs and other vertical concrete work exposed to the weather shall have a minimum compressive strength of 3000 psi (IRC Table R402.2). * On-site Septic System final installation approval (SWG2020-00500 final inspection & as-built submitted)required prior to closure of building permit. * Horizontal setbacks per WAC246-272A-0210 must be maintained, unless prior approval is obtained * Applicant/Owner assumes all responsibility if On-site Sewage Components are encumbered. A.) Drainfield/Reserve requires a 1 Oft setback from all footing/foundations. B.) Septic tank(s) requires 5ft setback from all footing/foundations. C.) No foundation/Perimeter Drains within 30ft, down gradient of Drainfield/Reserve area. D.) No Cut Bank(s) (greater than 5ft and over 45 degrees)within 50ft, down gradient of Drainfield/Reserve area. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By: Ouwu Contractor or Authorized Agent: T! j 1U Date: Printed by:Genie Mcfarland on:01/31/2023 10:59 AM Page 3 of 3