HomeMy WebLinkAboutBLD2024-00840 Ground Solar - BLD Inspections - 11/5/2024 INSPECTION CARD
Mason County
615 W. Alder St.
Building 8, Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
PERMIT# BLD2024-00840 PROJECT ADDRESS 540 E South Island Dr Shelton, WA 98584
PARCEL# 220103091004 PROJECT DESCRIPTION ground mounted solar array
OWNER ADDRESS PHONE
CONTRACTOR FORECAST ROOFING AND SOLAR LLC ADDRESS 12820 Avondale Way PHONE
CONTRACTOR LICENSE FORECRS883DG LENDER
INSPECTION INSP I DATE Comments INSPECTION INSP DATE Comments
BLD-Final Inspection , 11 2`{ 4,sS
FN'*Ak t 66 l 10(I$!z-t --Vx Ste-I+-w
INSPECTION RESULTS Page
WMASON COUNTY Department of Community Development
COMMUNITY DEVELOPMENT 615 W Alder St, Shelton, WA 98584
Cp� nssfs�azce cEncr_r,6uE� ing.�� ,,, ,� (360) 427-9670 ext. 352
Application# BLD2024-00840 Application Type GROUND MOUNT SOLAR Owner
Parcel # 220103091004 Site Address 540 E South Island Dr Shelton, WA 98584
Inspector Inspection Type Date Status Comments
10-18-24-J Q
solar structure has a lot of side to side lateral movement when hand tested -per
approved plan hard braces are to be installed for lateral support, please install per
plan see pg. S.12#3 Al and Pg. S50 for bracing details. see red marked area on
i`kV'LtA,e5-&, plans.
Joshua BLD-FINAL INSPECTION 10/18/2024 FAIL ,/Per pg.S21 and approved county conditions sheet 3 last bullet point- Gabion
Quarders basket ballast weight, Type of material used shall be provided at the time of
(�. 1 , inspection please provide pick ticket with material type and weight or the FOR
approval of ballast materials used. ok to send email
Call for reinspection when corrections are made before proceeding with any further
work
juarders@masoncountywa.gov
• � "; _ Kitsap Quarry
a?N
PO Box 4220
Bremerton,WA98312 ,,,►..�I (((q{ 7.y Ticket # 78183
!kfr 360-269-7521
kitsapquarry.brittany@gmaii.com Certified Scale
sued 9124/202411.11:18 AM Ref.# ;378
.......
Vehicle tt CASH CUSTOMER
Name FORECAST ROOFING Driver
PROJECT ,
Name KITSAP QUARRY _ Tkkala Today 1_._
_ ...........
�po
# Total Tons Today 14.01
'Location 818 ARCHIE AVE W
,
4.01 $14.50 $58.15
84 CC Fee 0. j 0.0 0.0 1.00 MOO $2 04
1
22-Environmental Surcharge 0.0 0.0 0.0 8,020.00• $0.00 $2.01
Notes: WHITE TRUCK WITH HIGH WALLED TRAILER
THANK YOU FOR YOUR BUSINESS! Delivery: $0.00
v Subtotal: $62.20
Tax: $0.00
Signature ..................... Total Price: $62.20
i
i,
i
Kitsap Quarry
PO Box 4220 !
• Bremerton,WA 98312 Ticket# 78183
* 360-269-7521
kitsapquarry.cdstal@gmail.com
Certified Scale
issued 9/24=4 11:0455 AM Ref.# 378
+ Vehicle# jCASH CUSTOMER
Noma FORECAST ROOFING Driver
Name Name KITSAP QUARRY 1
Address _ _ FPO#
Address 2 Location '180 -_..
jPROOuCT TARE GROSS , ,
i
0.0 4.011 $14.50 $58.1SI
--------------
84-CC Fee 0.0 0.01 0.0 1.00 $0.00 $2.04
22 -Environmental Surcharge 0.0 OA, 0.0 8,020.00( $0.00 $2A1;
Notes: WHITE TRUCK WITH HIGH WALLED TRAILER
Delivery: $0.00
THANK YOU FOR YOUR BUSINESS! ;y;
Subtotal: $62.20
Tex: $0.00
Total Price: $62.20
Signature ........................ ................ ..........
0
KITSAP QUARRY LLC
FOLLOW
818 ARCHIE AVE W
BREMERTON,WA 98312
+1 253-307-5900
Subtotal $62.20
Total Taxes $0.00
Total $ 62 20
PAYMENT ID: KBMPHJCYWMZSY
Hide Details
Card:Visa 3022
September 24, 2024, 11:10 AM
Method:TELEPHONE ORDER
Auth ID: 07053G
Reference ID:426800516308
Authorizing Network:VISA
DATE VISA
September 24,2024 VISA
11:10 am 3�""
022
View the Privacy Policies for
Clover
�i
i `ram f ?✓ �.
r
yC+
}
.z
7 t
•
a�
f;
, 1� „' ,. "T"-yN�'M�ir,ie. �•:..,^' 1s'� � j( F a ..k r +rs� `r,
w
E
Syr J
r
5
"j/j/ rot' �Z ; `�• �r�i ... �� _ .I � M H "�' _ _ -
Zi-
v
T r •"
q.
lime
lw
':� „ -Y, \ ,/ ,. `q, 7,r.� r ✓Si ice.+ _
�.� -, .< .. -. r ..1- 1.+�:s.c ci2_ r -,'�'14fi�7 M' ..+"t�� �Lwi g %�' 't!ffi"'�f�l.'� �,; '- --~•�.+�+1 �Y-, E�_�„ �,,�ce, .
,�� -,I+ � .L�+ J1 �"' �.� "�• �.jy.t \ ;$. �:. � w°` � .. "tea � -.
i y}j
Jim= �_��`�";\
�`�y� .:y ♦�:�,... `� • ��,.� s� �: + '\f.Y iJt= ���`:+ `\r...e_IA �.. 'le..i eF `�- '*-- a� v � �z
s�� !.T.x�' SIJi is ;.,[,:+,.�. v.._.j c.: •'_•^'f�' jj(( ' .._„`t-�S ''%�. '`.i j j - '+�r �.`�� ..�{ ��ry.�2�,'sr
+.4a,y { 3 .. t��y. f 't� ./ •/�. '+,.r...� L�� {} _. �+� 1 .\ Y l � ` si; '\ `t.
s �
-:
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
B DD2024-00840 GROUND MOUNT SOLAR
PROJECT DESCRIPTION: GROUND MOUNTED SOLAR ARRAY ISSUED: 09/12/2024
SITE ADDRESS: 540 E SOUTH ISLAND DR SHELTON
EXPIRES: 03/11/2025
PARCEL: 220103091004
APPLICANT: WEISKOPF DANIEL MARK&ELIZABETH OWNER:
JUNE
2012 E MILLER ST
SEATTLE,WA 98112
646-326-3274
CONTRACTOR: Forecast Solar LLC
12820 Avondale Way
Everett,WA 98204
4254876000
GENERAL CONTRACTOR'S LICENSE: FORECAST ROOFING AND SOLAR LLC License: FORECRS883DG
12820 Avondale Way Expires: 03/07/2026
EVERETT,WA 98204
FEES: Paid Due
Solar/PV Fee $152.00 $0.00
Technology Surcharge $1.60 $0.00
Final Inspection $80.00 $0.00
State Fee-Residential $6.50 $0.00
Solar/PV Base Fee $30.00 $0.00
Totals : $270.10 $0.00
REQUIRED INSPECTIONS
BLD-Final Inspection
CONDITIONS
Printed by:Annie Wilson on:09/12/2024 10:28 AM Page 1 of 3
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
GROUND MOUNT SOLAR BLD2024-00840
The installation of solar(thermal or photovoltaic) energy systems to provide space heating or cooling, hot water and
swimming pool heating shall conform to Chapter 23 of the International Residential Code, Chapter 14 of the International
Mechanical Code, Uniform Plumbing Code, the International Fire Code, and be shall be listed and labeled in accordance
with UL1703.
Roof mounted panels shall weigh no more than 4 Ibs per square foot. Supports for solar panels are to be installed to spread
the dead load across as many roof-framing members as needed to ensure that no point loads in excess of 50-Ibs are
created. Panels may be installed on roof assemblies with a single layer of roofing material. Roof assemblies with more than
one roofing material layer shall require an engineered analysis demonstrating that the roof will support the additional load of
the solar panel system. Attachment to the roof shall be in accordance with manufacturer specifications provided during the
inspection by the Mason County Building Inspector.
Roof mounted equipment shall comply with the International Fire Code Section 605.11, including signage and access
pathways. Roof access points shall not be located in areas where access ladders would block window or doors openings.
Not less than two- 3-foot wide access pathways shall be provided from the eave to ridge.
Ground-mounted panels and modules, installation must be in accordance with the manufacturer's instructions and be
available at time of inspection.
Inverters shall be listed and labeled in accordance with UL 1741. Systems connected to the utility grid shall use invertors
listed for the utility interaction
Collectors and thermal storage units shall be listed and labeled to show manufacturer's name, model number, serial number,
collector weight, collector maximum allowable temperatures and pressures, and the type of heat transfer fluids that are
compatible with the collector.
Connections to potable water supplies shall be provided with backflow protection in accordance with the Uniform Plumbing
Code. Solar energy systems containing pressurized fluids shall be protected with a temperature and pressure relief valve
and be protected from freeze damage. Systems shall be equipped with means to limit the maximum water temperature of
the system fluid entering or exchanging heat with any pressurized vessel inside the dwelling to 180 degrees Fahrenheit.
Solar energy collectors, controls, dampers, fans, blowers and pumps shall be accessible for inspection, maintenance, repair
and replacement. The roof shall be constructed to support the loads imposed by roof-mounted solar collectors and shall be
constructed of noncombustible materials, flashed and sealed to prevent entry of water, rodents, and insects. The building
inspector may require additional information, including an engineered design, to verify that existing roof or floor construction
are adequate to support the additional load of the solar energy equipment. When required provide an engineered design for
inspection.
OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit
revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or
contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained
permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The
owner or authorized agent represents that the information provided is accurate and grants employees of Mason County
access to the above described property and structure(s)for review and inspection. This permit/application becomes null &
void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of
180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT
APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION UNLESS OTHERWISE APPROVED.
* All other necessary permits from Mason County, Washington State, Federal Agencies, and/or other agencies/groups that
are required for this proposed development and construction must be obtained PRIOR TO DEVELOPMENT AND
CONSTRUCTION.
Printed by:Annie Wilson on:09/12/2024 10:28 AM
Page 2 of 3
� 4
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.mason countywa.gov
GROUND MOUNT SOLAR BLD2024-00840
" Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
* All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted
classification. Any non-approved change of use or occupancy would result in permit revocation.
* The demolition and disposal of debris must meet the regulations of Mason County and Olympic Region Clean Air Agency
(ORCAA).
It is unlawful for any person to cause or allow the demolition (or major renovation) of any structure unless all asbestos
containing materials have been identified and removed from the area to be demolished. Work shall not commence on an
asbestos project or demolition project unless the owner or operator has obtained written approval from ORCCA.2490 B
Limited Lane NW, Olympia WA 98502, 360.586.1044/800.422.5623 www.orcaa.org
.__1_1_________________. -----------------------.__.-------------
* Disclaimer
Mason County does not require surveys for building. As a result, site plans may not reflect accurate data. It is the applicant's
responsibility to comply with setback requirements.
PROVIDE BALLAST INFORMATION AT TIME OF INSPECTION (YARD/PATCH TICKET FROM SOURCE). THIS
DOCUMENT MUST NOTE THE WIEGHT AND TYPE OF MATERIAL USED. COMPLIANCE WITH THE INFORMAITON
ON THIS PAGE (S.21) MUST BE MET. IF INFORMATION IS NOT PROVDED AN ENGINEERS APPROVAL WILL BE
REQUIRED.
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of any other state/local law regulating construction or the performance of construction.
Issued By: L V1 I )I'
Contractor or Authorized Agent: Date:
Printed by:Annie Wilson on:09/12/2024 10:28 AM Page 3 of 3
40 MASON COUNTY 615 W.Alder St.Bldg 8,SHELTON,WA 98584
4 i COMMUNITY SERVICES SHELTON:360-427-9670, EXT 352
BELFAIR:360-2754467, EXT 352
Butlding,Plannaig,Environmenwl Health Community Health
ELMA: 360-482-5269, EXT 352
" www.co.mason.wa.us
INSPECTION CARD AND CERTIFICATE OF OCCUPANCY**
To schedule an inspection call or visit http:/twww.co.mason.wa.us/community-services/bid-inspection.php
Permit Number BLD2024-00840 Date Issued 09/12/2024 issued By
Project ground mounted solar array
Site Address 540 E South Island Dr
Applicant WEISKOPF DANIEL MARK&ELIZABETH JUNE
Contractor FORECAST ROOFING AND SOLAR LLC
Contractor Phone
Primary Code UPC IBC,IRC,IFC,IEC,IMC,& Type
Permit Type GROUND MOUNT SOLAR Occupancy
-APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS.
-DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED.
-THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION, FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY.
-ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION.
-OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION.
**THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED."
PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET
Public Works Access/Driveway Other
Health Septic Well
Deptartment
Planning Site Inspection
Department
Fire Marshall Fire Apparatus Access Fire Sprinkler
Auto Fire Alarm Hood and Duct
Other Final
Building
Department Building Official: Community Services Designee
Concrete Setbacks Slab
Footing Perimeter Point load Footing
Footing Interior Footing Decks/Porches
Foundation Stem Walls Other
Rough-In Groundwork Plumbing Framing
Groundwork Mechanical Plumbing
Groundwork Gas Pipe Mechanical
Gas Piping Shear Wall Nailing
Underfloor
Other
Insulation Slab Ceiling
Floor Vaulted Ceiling
Walls Vapor Barrier
Other
Wallboard Interior Wall Brace Panels Fire Walls
Nailing
Other
Final Building
Manufactured Setbacks Setup
Home
Concrete Foot/Runners Final
Other